Inspections for the day of: Friday, February 7, 2020.
Number of inspections: 31
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03519 BLD-Aging Inspection2/7/20202/7/20202/10/2020 8:33:56 AM DONE
Expires: 03/23/20
BLD19-00843 BLD-Final2/7/20202/7/20202/7/2020 4:03:05 PMPCANC
Phone #: ###-#### Inspection requested via web by Zach Carter//need fire life safety, sprinkler and fire alarm finals// will need to reshedule//
BLD19-00376 BLD-Final2/7/20202/7/20202/7/2020 4:02:04 PMPPASS
jack Phone #: ###-####//final complete per approved plans//smoke and CO detectors added//
BLD19-00376 DOC - Permit Finaled2/7/20202/7/20202/7/2020 4:01:26 PMPPASS
BLD19-03357 BLD-Energy code compliance2/7/20202/7/20202/7/2020 2:59:37 PMPFAIL
Insulation inspection prior to sheetrock. Phone #: ###-#### Inspection requested via web by Alex Macdoanld//need truss engineering//noted from previous inspection//
BLD19-01949 BLD-Final2/7/20202/7/20202/7/2020 1:42:33 PMPNR
Doyle Phone #: ###-####//no roofing on door cover or any accents//
BLD19-02398 BLD-Wall Bracing2/6/20202/7/20202/7/2020 1:08:47 PMPPART
Hoping to also have you look at small insulated areas before cover at TPO areas. Phone #: ###-#### Inspection requested via web by Wes palm//flat roof and floor decking ok//ok to insulate upper wall areas to finish exterior sheathing//need to add strapping at windows per details on plans// add truss blocking per truss details and plans at strapping required on roof decking//
BLD20-00260 BLD-Final2/7/20202/7/20202/7/2020 12:25:43 PMPPASS
Rob Phone #: ###-####
BLD19-04895 BLD-Other2/4/20202/7/20202/7/2020 12:25:27 PMADONE
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD19-04895 DOC - Permit Finaled2/7/20202/7/20202/7/2020 12:25:16 PMPPASS
new roof flashing installed//roofing appears to be installed within code requirements.//
BLD19-03916 BLD-Other2/6/20202/7/20202/7/2020 12:24:36 PMADONE
Inspection on a re-roof project that has been completed Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD19-03916 DOC - Permit Finaled2/7/20202/7/20202/7/2020 12:24:26 PMPPASS
new roof flashings installed//roofing appears to be installed within code requirements//
BLD19-04261 BLD-Other2/6/20202/7/20202/7/2020 11:55:14 AMADONE
Inspection on a re-roof project that has been completed Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD19-04261 DOC - Permit Finaled2/7/20202/7/20202/7/2020 11:55:04 AMPPASS
new roof flashing installed//roofing appears to be installed within code requirements//
BLD19-01154 BLD-Final2/6/20202/7/20202/7/2020 11:46:55 AMAFAIL
call for access code Shawn Phone #: ###-#### or ###-#### Marty//plans show r 38 insulation--description is prescriptive of R 49--manual J also shows R49 attic insulation//insulation certificate does not list crawlspace insulation//remove dust covers from smoke and smoke/CO detectors// CN posted onsite//
BLD19-01154 BLD-Blower Door Test Results2/7/20202/7/20202/7/2020 11:45:13 AMADONE
3.78 ACH 50
BLD20-00264 BLD-Other2/4/20202/7/20202/7/2020 11:07:04 AMADONE
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-00264 DOC - Permit Finaled2/7/20202/7/20202/7/2020 11:06:55 AMPPASS
no access to back//new roof flashings installed//roof appears to be installed within code requirements//
BLD20-00254 BLD-Final2/4/20202/7/20202/7/2020 10:36:40 AMADONE
Inspection requested via web by Hans Weikl
BLD20-00254 DOC - Permit Finaled2/7/20202/7/20202/7/2020 10:36:28 AMPPASS
new roof flashing installed//no access to back//roofing appears to be installed within code requirements//
BLD19-03913 BLD-Other2/6/20202/7/20202/7/2020 9:53:36 AMADONE
Inspection on a re-roof project that has been completed Phone #: ###-#### Inspection requested via web by Michael La Pointe//some soffit damage observed onsite--possibly prior to new roofing installation//
BLD19-03913 DOC - Permit Finaled2/7/20202/7/20202/7/2020 9:52:39 AMPPASS
new roof flashings installed//roofing appears to be installed within code requirements//
BLD19-04033 BLD-Framing/Rough-in2/6/20202/7/20202/7/2020 9:44:35 AMAFAIL
Jeff Phone #: ###-####//CN posted//no plans onsite, a couple corrections noted//
BLD19-04031 BLD-Framing/Rough-in2/6/20202/7/20202/7/2020 9:22:30 AMAPASS
Jeff Phone #: ###-####//ok to insulate//
BLD18-03071 BLD-Aging Inspection2/7/20202/7/20202/7/2020 8:33:04 AM PASS
WIP
BLD16-03262 BLD-Aging Inspection2/7/20202/7/20202/7/2020 8:31:55 AM DONE
Still needs electrical final
Expires: 03/24/20
BLD18-03524 BLD-Aging Inspection2/7/20202/7/20202/7/2020 8:30:49 AM CANC
BLD15-02348 BLD-Aging Inspection2/7/20202/7/20202/7/2020 8:30:26 AM DONE
no activity since failed final on 9/26/2019
BLD20-00186 BLD-Other2/4/20202/7/20202/7/2020 8:28:56 AMADONE
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe//new roof flashings installed///roofing appears to be installed within code requirements//
BLD20-00186 DOC - Permit Finaled2/7/20202/7/20202/7/2020 8:28:23 AMPPASS
BLD19-01154 BLD-Final2/6/20202/7/20202/7/2020 12:00:00 AMACANC
Shawn call to cancel, not ready will call to reschedule//Shawn Phone #: ###-####