BLD19-00527
| BLD-Wall cover | 3/10/2020 | 3/10/2020 | 3/10/2020 4:31:55 PM | P | PART |
|
|
1st floor cover inspection on units only. Phone #: ###-#### Inspection requested via web by Travis Blackburn//1st floor ok to cover--energy ok//
|
BLD19-04375
| BLD-Other | 3/9/2020 | 3/10/2020 | 3/10/2020 4:31:23 PM | P | DONE |
|
|
Inspection on a completed TPO roof. Our representative will meet you at the property, please call him when you know what time you''ll be out there so he can bring his ladder to facilitate the inspection. Chris Waskoviak ###-#### Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-04375
| DOC - Permit Finaled | 3/10/2020 | 3/10/2020 | 3/10/2020 4:31:06 PM | P | PASS |
|
|
roof appears to be installed within code requirements//
|
BLD19-04447
| BLD-Other | 3/9/2020 | 3/10/2020 | 3/10/2020 2:51:38 PM | P | DONE |
|
|
Inspection on a completed TPO roof. Our representative will meet you at the property, please call him when you know what time you''ll be out there so he can bring his ladder to facilitate the inspection. Chris Waskoviak ###-#### Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-04447
| DOC - Permit Finaled | 3/10/2020 | 3/10/2020 | 3/10/2020 2:51:28 PM | P | PASS |
|
|
roof appears to be installed within code requirements//
|
BLD20-00750
| BLD-Footing | 3/9/2020 | 3/10/2020 | 3/10/2020 2:50:36 PM | P | PASS |
|
|
A PM inspection for this footing inspection will be great. Alex will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch//ok after holes are dug to 25"x25" per plans, working on it when i left//
|
BLD19-04773
| BLD-Footing | 3/9/2020 | 3/10/2020 | 3/10/2020 1:41:09 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD19-04772
| BLD-Footing | 3/9/2020 | 3/10/2020 | 3/10/2020 1:40:51 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD19-04770
| BLD-Footing | 3/9/2020 | 3/10/2020 | 3/10/2020 1:40:36 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD19-04767
| BLD-Footing | 3/9/2020 | 3/10/2020 | 3/10/2020 1:40:21 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD19-04526
| BLD-Framing/Rough-in | 3/10/2020 | 3/10/2020 | 3/10/2020 12:52:20 PM | P | PASS |
|
|
willie Phone #: ###-####//ok to insulate//need truss plans onsite//
|
BLD20-00370
| BLD-Foundation | 3/9/2020 | 3/10/2020 | 3/10/2020 11:25:29 AM | A | PART |
|
|
Pat Phone #: ###-####//still need to set bolts and hold downs//otherwise ok -- WIP//
|
BLD19-04366
| BLD-Energy code compliance | 3/9/2020 | 3/10/2020 | 3/10/2020 11:07:32 AM | A | PASS |
|
|
Bruce Phone #: ###-####//foundation wall insulation per plans//
|
BLD19-01303
| BLD-Framing/Rough-in | 3/9/2020 | 3/10/2020 | 3/10/2020 8:38:43 AM | A | FAIL |
|
|
Correction List: Nailed all green plate with hand dipped galvanized nails. Removed 3 small panels of shear to make visible the hold downs Added Simpson S27 straps on the portal header. A roof plan and engineering is in the fireplace. Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk//correction notice posted/need two hold downs per portal frame- only 1 per side on side portal frames//straps are not the same as specified on plans, and all 4 wall need them per the engineering// trusses ok//fix framing per plans or have enginneer approve//
|