BLD20-00345
| BLD-Footing | 3/13/2020 | 3/13/2020 | 3/13/2020 3:37:01 PM | P | CANC |
|
|
Chris Phone #: ###-####//cancel per guys onsite//re-scheduled for monday PM//
|
BLD20-00149
| BLD-Other | 3/13/2020 | 3/13/2020 | 3/13/2020 3:35:57 PM | P | PART |
|
|
Shear Wall bracing Phone #: ###-#### Inspection requested via web by Judy Jepson/CN posted//
|
BLD20-00149
| BLD-Framing/Rough-in | 3/13/2020 | 3/13/2020 | 3/13/2020 3:35:40 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Judy Jepson//CN posted//
|
BLD19-02398
| BLD-Wall cover | 3/12/2020 | 3/13/2020 | 3/13/2020 3:21:20 PM | P | PART |
|
|
Inspection for cover at main floor exterior walls and seating area lid. Phone #: ###-#### Inspection requested via web by Wes palm//ok to cover walls--do not cover fire riser room--need rated assembly documents//ok to cover lid in dining area pending fire sprinkler approval//
|
BLD19-03895
| BLD-Wall Bracing | 3/13/2020 | 3/13/2020 | 3/13/2020 2:17:10 PM | P | PART |
|
|
Shear // Craig Phone #: ###-####//ok when nailing added and blocking added//
|
BLD19-04891
| BLD-Conference | 3/13/2020 | 3/13/2020 | 3/13/2020 1:50:44 PM | P | DONE |
|
|
requested by Mech inspector to look at med gas room//CN posted for contractor to contact me for conference regarding med gas room ratings and construction//
|
BLD19-03229
| BLD-Wall Bracing | 3/13/2020 | 3/13/2020 | 3/13/2020 1:07:14 PM | A | PASS |
|
|
Sheetrock fire walls Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD19-03253
| BLD-Wall Bracing | 3/13/2020 | 3/13/2020 | 3/13/2020 1:06:58 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD19-03247
| BLD-Wall Bracing | 3/13/2020 | 3/13/2020 | 3/13/2020 1:06:43 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD19-03248
| BLD-Wall Bracing | 3/13/2020 | 3/13/2020 | 3/13/2020 1:06:28 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD19-03873
| BLD-Conference | 3/13/2020 | 3/13/2020 | 3/13/2020 12:14:55 PM | P | DONE |
|
|
Ed Phone #: ###-####
|
BLD19-03555
| BLD-Final | 3/12/2020 | 3/13/2020 | 3/13/2020 11:10:35 AM | A | PART |
|
|
Homeowner will be available to do the final walk around Phone #: ###-#### Inspection requested via web by Christian Mikesell//addition ok per plans//smoke CO detectors added to house//only need hard surface at entry to final//
|
BLD19-04767
| BLD-Foundation | 3/12/2020 | 3/13/2020 | 3/13/2020 10:47:59 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD19-04770
| BLD-Foundation | 3/12/2020 | 3/13/2020 | 3/13/2020 10:47:46 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD19-04772
| BLD-Foundation | 3/12/2020 | 3/13/2020 | 3/13/2020 10:47:34 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD19-04773
| BLD-Foundation | 3/12/2020 | 3/13/2020 | 3/13/2020 10:47:21 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD19-03657
| BLD-Final | 3/12/2020 | 3/13/2020 | 3/13/2020 9:56:21 AM | A | PASS |
|
|
Garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover//need to update insulation values on permit, kelly will take care of//ok otherwise//
|
BLD19-03657
| DOC - Permit Finaled | 3/13/2020 | 3/13/2020 | 3/13/2020 9:55:39 AM | P | PASS |
|
|
|
BLD20-00713
| BLD-Framing/Rough-in | 3/12/2020 | 3/13/2020 | 3/13/2020 9:32:28 AM | A | DONE |
|
|
Taylor Barton is the on site contact Phone #: ###-#### Inspection requested via web by BRS Permitting//onsite ok, needs electrical,, no changes to structure required per engineer//pend electrical pass//
|
BLD20-00724
| BLD-Other | 3/12/2020 | 3/13/2020 | 3/13/2020 9:08:59 AM | A | DONE |
|
|
Inspection on a completed asphalt roofing project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-00724
| DOC - Permit Finaled | 3/13/2020 | 3/13/2020 | 3/13/2020 9:08:51 AM | P | PASS |
|
|
roof appears to be installed within code requirements// no access to back//
|
BLD19-03873
| BLD-Final | 3/12/2020 | 3/13/2020 | 3/13/2020 12:00:00 AM | P | CANC |
|
|
Ed Phone #: ###-####
|