BLD18-02066
| BLD-Aging Inspection | 3/5/2020 | 3/5/2020 | 3/6/2020 8:32:40 AM | | CANC |
|
|
|
MIS19-00131
| MIS-Aging Inspection | 3/5/2020 | 3/5/2020 | 3/6/2020 8:32:18 AM | | DONE |
|
|
expired
|
BLD15-00001
| BLD-Aging Inspection | 3/5/2020 | 3/5/2020 | 3/6/2020 8:30:51 AM | | PART |
|
|
no contact from owner on the project, i believe he was having surgery//
|
BLD19-00527
| BLD-Framing/Rough-in | 3/4/2020 | 3/5/2020 | 3/5/2020 4:40:41 PM | P | PART |
|
|
Inspection for insulation on 1st floor needed. Nobody will be able to walk from 12-2. After 2 would be preferred. I would also like to inspect shaftliner assembly at top of stairways for cover. Phone #: ###-#### Inspection requested via web by Travis Blackburn//1st floor only//some framig corrections, fire caulking, and anchors bolts needed//still need fire blocking on separation walls//will call in for inspection of above//
|
BLD19-03947
| BLD-Footing | 3/5/2020 | 3/5/2020 | 3/5/2020 4:39:27 PM | P | PART |
|
|
Phone #: 2083425188 >> Inspection requested via mobile web by Chris Hopkins//clean hole prior to pour, depth and width per plans//WIP//
|
BLD20-00656
| BLD-Framing/Rough-in | 3/4/2020 | 3/5/2020 | 3/5/2020 3:10:04 PM | P | PART |
|
|
Lloyd Phone #: ###-####//need to add angle bracing a 4ft oc per plans//ok to cover and check bracing at grid inspection//CN left onsite//
|
BLD19-03303
| BLD-Final | 3/5/2020 | 3/5/2020 | 3/5/2020 2:36:39 PM | P | PASS |
|
|
Call for access Phone #: 2089417066 >> Inspection requested via mobile web by Anthony Day
|
BLD19-03303
| DOC - Permit Finaled | 3/5/2020 | 3/5/2020 | 3/5/2020 2:36:28 PM | P | PASS |
|
|
|
BLD19-03303
| BLD-Blower Door Test Results | 3/5/2020 | 3/5/2020 | 3/5/2020 2:34:56 PM | P | DONE |
|
|
2.92 ACH 50
|
BLD20-00370
| BLD-Footing | 3/5/2020 | 3/5/2020 | 3/5/2020 1:40:00 PM | P | CANC |
|
|
Chris Phone #: ###-####//spoke with Chris, needs to locate side pin for setback verification--asked to cancel//
|
BLD18-04091
| BLD-Footing | 3/5/2020 | 3/5/2020 | 3/5/2020 1:39:01 PM | P | FAIL |
|
|
Logan Phone #: ###-####//front setbacks need to be minimum of 20 feet per planning//measured onsite of 13 feet to front pop-out and 15 feet to main house from pins//sides ok, rear ok//
|
BLD19-02398
| BLD-Framing/Rough-in | 3/4/2020 | 3/5/2020 | 3/5/2020 12:54:58 PM | P | PASS |
|
|
Please Call Wes with any questions at the number listed above. Phone #: ###-#### call 30 minutes//ok to insulate//a few corrections and interior shear needs verified//
|
BLD19-03873
| BLD-Framing/Rough-in | 3/4/2020 | 3/5/2020 | 3/5/2020 11:14:11 AM | A | PASS |
|
|
Eddie Phone #: ###-####//last for wall framing ok//call for grid when ready//
|
BLD20-00575
| BLD-Final | 3/4/2020 | 3/5/2020 | 3/5/2020 10:55:23 AM | A | PASS |
|
|
there is a roof hatch to access roof Phone #: ###-#### Inspection requested via web by Kerrie Kuhn
|
BLD20-00575
| DOC - Permit Finaled | 3/5/2020 | 3/5/2020 | 3/5/2020 10:55:13 AM | P | PASS |
|
|
roofing appears to be installed within code requirements//
|
MIS20-00051
| BLD-Conference | 2/28/2020 | 3/5/2020 | 3/5/2020 10:08:28 AM | A | DONE |
|
|
follow up....//talked with contractor and advised to make application within 5 days or a Notice of Violation will be issued//new walls installed inside home new kitchen payout, windows, sideing// check back 5 days//
|
BLD19-04743
| BLD-Wall Bracing | 3/4/2020 | 3/5/2020 | 3/5/2020 9:34:48 AM | A | PASS |
|
|
Christina Phone #: ###-####
|
BLD19-04385
| BLD-Wall cover | 3/4/2020 | 3/5/2020 | 3/5/2020 9:13:25 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John Treat
|