Inspections for the day of: Friday, April 10, 2020.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-04669 BLD-Framing/Rough-in4/10/20204/10/20204/10/2020 4:22:33 PMPPASS
vince - Screened for COVID 19 symptoms Phone #: ###-####//ok to insulate//see truss engineering for missed bracing, please provide engineering for patio cover//
BLD19-03249 BLD-Energy code compliance4/10/20204/10/20204/10/2020 3:05:09 PMPPASS
ok to cover, corrections made//walked framing with engineer, contractor, and I, corrections were made//
BLD19-03252 BLD-Energy code compliance4/10/20204/10/20204/10/2020 3:04:53 PMPPASS
ok to cover, corrections made//walked framing with engineer, contractor, and I, corrections were made//
BLD19-03250 BLD-Energy code compliance4/10/20204/10/20204/10/2020 2:47:50 PMPPART
do not cover new electrical/// all other areas ok, corrections made, framing was walked through with engineer, contractor and I, corrections have been made//
BLD19-03251 BLD-Energy code compliance4/10/20204/10/20204/10/2020 2:47:37 PMPPART
do not cover new electrical/// all other areas ok, corrections made, framing was walked through with engineer, contractor and I, corrections have been made//
BLD20-00871 BLD-Framing/Rough-in4/9/20204/10/20204/10/2020 1:55:23 PMPPASS
Please call a half hour before arrival.
Thanks, Dan Beck 208 600 2515 Inspection requested via web by Dan Beck//insulation and vapor barrier installed, ele permit was issued and inspected for outlets and new lighting//ok per scope//
BLD19-03656 BLD-Framing/Rough-in4/10/20204/10/20204/10/2020 1:29:21 PMPPART
vince - Screened for COVID 19 symptoms Phone #: ###-####///se plans and truss docs for corrections ok to insulate//
BLD19-04651 BLD-Framing/Rough-in4/9/20204/10/20204/10/2020 1:28:45 PMPFAIL
Daiman *cleared* Phone #: ###-####//see plans and bmc calcs for corretions//
BLD19-00556 BLD-Blower Door Test Results4/10/20204/10/20204/10/2020 11:58:11 AMPCANC
BLD19-00556 BLD-Final4/9/20204/10/20204/10/2020 11:58:00 AMAFAIL
Daiman *cleared* Phone #: ###-####//still needs driveway or zoning approval//
BLD19-03249 BLD-Wall cover4/10/20204/10/20204/10/2020 10:50:22 AMAFAIL
Tell, I am still in Montana but I had Joey take all the 6 inch lags and replace with 10 in lags Where needed. Carl Phone #: ###-#### Inspection requested via web by Carl Funkcn issued to remove gyp to see framing corrections and insulation//
BLD19-03250 BLD-Wall cover4/10/20204/10/20204/10/2020 10:50:06 AMAFAIL
Phone #: ###-#### Inspection requested via web by Carl Funkcn issued to remove gyp to see framing corrections and insulation//
BLD19-03251 BLD-Wall cover4/10/20204/10/20204/10/2020 10:49:53 AMAFAIL
Phone #: ###-#### Inspection requested via web by Carl Funkcn issued to remove gyp to see framing corrections and insulation//
BLD19-03252 BLD-Energy code compliance4/10/20204/10/20204/10/2020 10:49:36 AMPFAIL
cn issued to remove gyp to see framing corrections and insulation//
BLD19-03254 BLD-Wall cover4/10/20204/10/20204/10/2020 10:47:42 AMACANC
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD19-00532 BLD-Wall Bracing4/8/20204/10/20204/10/2020 10:02:45 AMAPART
Inspection for floor to floor strapping and roof tie downs for cover of upper level roof eves with fire protection sheetrock Phone #: ###-#### Inspection requested via web by Travis Blackburn// north and west walls only, exterior strapping and nailing ok// eaves ok where h2.5s installed//
BLD19-00538 BLD-Wall Bracing4/8/20204/10/20204/10/2020 10:01:40 AMAPASS
Shear inspection for cover on exterior of garage 6 Phone #: ###-#### Inspection requested via web by Travis Blackburn//hold downs ok//shear nailing ok//
BLD19-04931 BLD-Final4/9/20204/10/20204/10/2020 9:29:47 AMAPASS
Phone #: ###-#### Inspection requested via web by BRS Permitting//ele finaled//panels installed per approved plans//
BLD19-04931 DOC - Permit Finaled4/10/20204/10/20204/10/2020 9:29:01 AMPPASS
BLD19-04887 BLD-Wall Bracing4/9/20204/10/20204/10/2020 9:20:44 AMAFAIL
*screened* Brett Phone #: ###-####//shear still does not meet plans, portal frames not correct, blocking does not meet requirements//talked with desinger on phone he will address//
BLD19-04441 BLD-Framing/Rough-in4/9/20204/10/20204/10/2020 8:55:13 AMAPASS
Phone #: ###-#### Inspection requested via web by Kelly Stover//corrections made//ok to insulate//
BLD18-04276 BLD-Aging Inspection4/10/20204/10/20204/10/2020 7:17:36 AM FAIL
no inspections have been requested
MIS19-00025 DOC - Permit Finaled4/10/20204/10/20204/10/2020 7:16:37 AMAPASS
bond was set