Inspections for the day of: Monday, April 13, 2020.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-04309 BLD-Aging Inspection4/13/20204/13/20204/14/2020 7:00:24 AM PEND
Expires: 05/28/20
BLD19-01791 BLD-Aging Inspection4/13/20204/13/20204/14/2020 6:59:28 AM PEND
BLD20-01111 BLD-Final4/13/20204/13/20204/13/2020 4:00:49 PMPDONE
Phone #: ###-#### Inspection requested via web by Ira Rutledge
BLD20-01111 DOC - Permit Finaled4/13/20204/13/20204/13/2020 4:00:39 PMPPASS
roof appears to be installed within code requirements//no access to back//
BLD19-01221 BLD-Framing/Rough-in4/13/20204/13/20204/13/2020 3:59:45 PMPPASS
Michael Phone #: ###-####//ok to insulate the shop area and ceiling// loft is unfinished//add uplift hardware to deck rafters and shop rafters//
BLD20-01104 BLD-Framing/Rough-in4/13/20204/13/20204/13/2020 2:40:42 PMPPART
Footing inspection requested simultaneously please. Phone #: ###-#### Inspection requested via web by David Dexter//hardware ok//
BLD20-01104 BLD-Footing4/13/20204/13/20204/13/2020 1:17:05 PMPPASS
Framing inspection requested simultaneously please. Phone #: ###-#### Inspection requested via web by David Dexter//footing will be constrained once concrete patio is poured//frost depth ok//
BLD20-00223 BLD-Wall Bracing4/13/20204/13/20204/13/2020 12:44:25 PMPFAIL
stated no one would be onsite..... shear // Kerry Phone #: ###-####//CN issued//need to add hot dip galvanized nails in PT//need to finish nailing portal frame and add hold downs in correct location//nail areas marked in red//
BLD20-01020 BLD-Final4/9/20204/13/20204/13/2020 11:32:00 AMADONE
Inspection requested via web by Hans Weikl
BLD20-01020 DOC - Permit Finaled4/13/20204/13/20204/13/2020 11:31:51 AMPPASS
roof appears to be installed within code requirements//
BLD20-00085 BLD-Energy code compliance4/11/20204/13/20204/13/2020 11:01:57 AMAPART
Phone #: ###-#### Inspection requested via web by Roger Judge//ok still need to see joist repair//ok to cover partial and will need to call in for joist repair//
BLD19-04887 BLD-Wall Bracing4/10/20204/13/20204/13/2020 10:34:18 AMAPASS
Brett - Screened for COVID 19 Symptoms. Phone #: ###-####//APA wall bracing documents were updated and now reflect onsite wall bracing methods//
BLD19-04441 BLD-Energy code compliance4/12/20204/13/20204/13/2020 10:02:49 AMAPASS
Phone #: ###-#### Inspection requested via web by Kelly Stover
BLD19-03339 BLD-Final4/10/20204/13/20204/13/2020 9:32:24 AMAFAIL
John Phone #: ###-####//home appears to be on property and was not demolished//
BLD19-01748 BLD-Final4/10/20204/13/20204/13/2020 9:05:09 AMAPASS
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD19-01748 DOC - Permit Finaled4/13/20204/13/20204/13/2020 9:04:59 AMPPASS
BLD19-01748 BLD-Blower Door Test Results4/10/20204/13/20204/13/2020 9:02:31 AMADONE
Phone #: ###-#### Inspection requested via web by Clint Wall//4.09 ACH 50//