Inspections for the day of: Thursday, April 16, 2020.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-03464 BLD-Aging Inspection4/16/20204/16/20204/20/2020 8:37:59 AM PEND
BLD19-03947 BLD-Final4/15/20204/16/20204/16/2020 3:13:32 PMPDONE
Phone #: 2083425188 >> Inspection requested via mobile web by Chris Hopkins
BLD19-03947 DOC - Permit Finaled4/16/20204/16/20204/16/2020 3:13:22 PMPPASS
BLD19-03358 BLD-Blower Door Test Results4/16/20204/16/20204/16/2020 3:12:48 PMPDONE
3.21 ACH 50
BLD19-03358 BLD-Final4/15/20204/16/20204/16/2020 3:09:48 PMPPASS
Caulk completed. Handrail being finalized. Garage code 8118. Thank you!! Phone #: ###-#### Inspection requested via web by Alex Macdonald//corrections made//
BLD19-03358 DOC - Permit Finaled4/16/20204/16/20204/16/2020 3:09:31 PMPPASS
BLD20-01050 BLD-Framing/Rough-in4/16/20204/16/20204/16/2020 1:58:57 PMPPASS
virtual inspection requested //Ben Phone #: ###-####//inspection completed via Google DUO//owner walked me through project, egress, smoke/co detectors were discussed//all trades isnpections were completed via virtual inspection as well//appears to be ok during video call, ok to cover//
BLD20-00987 BLD-Final4/13/20204/16/20204/16/2020 1:17:50 PMPDONE
Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD20-00987 DOC - Permit Finaled4/16/20204/16/20204/16/2020 1:17:39 PMPPASS
appears to be installed per the approved documents//ELE final is complete//
BLD20-01065 BLD-Framing/Rough-in4/15/20204/16/20204/16/2020 11:08:27 AMACANC
Jay Walters is the onsite contact ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting//framing inspection is not required as no changes to the existing structure are required per the engineers evaluation//
BLD20-00206 BLD-Wall Bracing4/15/20204/16/20204/16/2020 10:48:45 AMAPASS
Robert **Cleared** Phone #: ###-####
BLD19-04651 BLD-Framing/Rough-in4/15/20204/16/20204/16/2020 10:27:42 AMAPART
framer there now should be done today by 3 pm. Phone #: ###-#### Inspection requested via web by Damion Jordan//repair for notched joist needs to match fix and use correct hangers//framing at swoop near front porch still does not reflect the details on plans-need to use 2x material for rim and ledger-1/2" osb was used// ok to insulate only//
BLD19-04669 BLD-Energy code compliance4/15/20204/16/20204/16/2020 9:22:19 AMANR
Vince Phone #: ###-####//gas line test has failed//no inspection completed//not cover until inspection completed after gas line test has passed//
BLD19-03656 BLD-Energy code compliance4/15/20204/16/20204/16/2020 9:20:20 AMAFAIL
Vince Phone #: ###-####//F02 trusses still need bracing//girders still need nailed//verify R49 insulation values have been acheived--batts show R38//porch post attachment must be approved attachment and be protected from ground/concrete contact by approved methods//