BLD19-03464
| BLD-Aging Inspection | 4/16/2020 | 4/16/2020 | 4/20/2020 8:37:59 AM | | PEND |
|
|
|
BLD19-03947
| BLD-Final | 4/15/2020 | 4/16/2020 | 4/16/2020 3:13:32 PM | P | DONE |
|
|
Phone #: 2083425188 >> Inspection requested via mobile web by Chris Hopkins
|
BLD19-03947
| DOC - Permit Finaled | 4/16/2020 | 4/16/2020 | 4/16/2020 3:13:22 PM | P | PASS |
|
|
|
BLD19-03358
| BLD-Blower Door Test Results | 4/16/2020 | 4/16/2020 | 4/16/2020 3:12:48 PM | P | DONE |
|
|
3.21 ACH 50
|
BLD19-03358
| BLD-Final | 4/15/2020 | 4/16/2020 | 4/16/2020 3:09:48 PM | P | PASS |
|
|
Caulk completed. Handrail being finalized. Garage code 8118. Thank you!! Phone #: ###-#### Inspection requested via web by Alex Macdonald//corrections made//
|
BLD19-03358
| DOC - Permit Finaled | 4/16/2020 | 4/16/2020 | 4/16/2020 3:09:31 PM | P | PASS |
|
|
|
BLD20-01050
| BLD-Framing/Rough-in | 4/16/2020 | 4/16/2020 | 4/16/2020 1:58:57 PM | P | PASS |
|
|
virtual inspection requested //Ben Phone #: ###-####//inspection completed via Google DUO//owner walked me through project, egress, smoke/co detectors were discussed//all trades isnpections were completed via virtual inspection as well//appears to be ok during video call, ok to cover//
|
BLD20-00987
| BLD-Final | 4/13/2020 | 4/16/2020 | 4/16/2020 1:17:50 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting
|
BLD20-00987
| DOC - Permit Finaled | 4/16/2020 | 4/16/2020 | 4/16/2020 1:17:39 PM | P | PASS |
|
|
appears to be installed per the approved documents//ELE final is complete//
|
BLD20-01065
| BLD-Framing/Rough-in | 4/15/2020 | 4/16/2020 | 4/16/2020 11:08:27 AM | A | CANC |
|
|
Jay Walters is the onsite contact ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting//framing inspection is not required as no changes to the existing structure are required per the engineers evaluation//
|
BLD20-00206
| BLD-Wall Bracing | 4/15/2020 | 4/16/2020 | 4/16/2020 10:48:45 AM | A | PASS |
|
|
Robert **Cleared** Phone #: ###-####
|
BLD19-04651
| BLD-Framing/Rough-in | 4/15/2020 | 4/16/2020 | 4/16/2020 10:27:42 AM | A | PART |
|
|
framer there now should be done today by 3 pm. Phone #: ###-#### Inspection requested via web by Damion Jordan//repair for notched joist needs to match fix and use correct hangers//framing at swoop near front porch still does not reflect the details on plans-need to use 2x material for rim and ledger-1/2" osb was used// ok to insulate only//
|
BLD19-04669
| BLD-Energy code compliance | 4/15/2020 | 4/16/2020 | 4/16/2020 9:22:19 AM | A | NR |
|
|
Vince Phone #: ###-####//gas line test has failed//no inspection completed//not cover until inspection completed after gas line test has passed//
|
BLD19-03656
| BLD-Energy code compliance | 4/15/2020 | 4/16/2020 | 4/16/2020 9:20:20 AM | A | FAIL |
|
|
Vince Phone #: ###-####//F02 trusses still need bracing//girders still need nailed//verify R49 insulation values have been acheived--batts show R38//porch post attachment must be approved attachment and be protected from ground/concrete contact by approved methods//
|