BLD18-02788
| BLD-Aging Inspection | 4/22/2020 | 4/22/2020 | 4/27/2020 7:20:08 AM | | PASS |
|
|
wip
|
BLD20-01317
| BLD-Final | 4/22/2020 | 4/22/2020 | 4/22/2020 3:28:01 PM | P | PEND |
|
|
please call so i can meet and let you in. 20 min notice is preferable. Thanks Tim Phone #: ###-#### Inspection requested via web by Tim Lenberg//need zoning sign off//otherwise ok, contactor stated no temp needed as no wet areas or close to doors//did not enter due to pandemic guidelines//
|
BLD20-00359
| BLD-Footing | 4/22/2020 | 4/22/2020 | 4/22/2020 3:17:34 PM | P | PART |
|
|
screened - Michael Phone #: ###-####//plan modification plans were used from documents folder//rebar was elevated and photos sent//
|
BLD20-01246
| BLD-Other | 4/22/2020 | 4/22/2020 | 4/22/2020 3:16:18 PM | P | DONE |
|
|
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-01246
| DOC - Permit Finaled | 4/22/2020 | 4/22/2020 | 4/22/2020 3:16:10 PM | P | PASS |
|
|
roof appears to be installed within code requirements//
|
BLD20-01136
| BLD-Foundation | 4/22/2020 | 4/22/2020 | 4/22/2020 3:08:07 PM | P | PASS |
|
|
wall // Vince Phone #: ###-####
|
BLD19-04669
| BLD-Energy code compliance | 4/22/2020 | 4/22/2020 | 4/22/2020 2:20:15 PM | P | PASS |
|
|
Vince Phone #: ###-####
|
BLD20-00670
| BLD-Wall Bracing | 4/21/2020 | 4/22/2020 | 4/22/2020 12:46:42 PM | P | PASS |
|
|
Shear inspection Phone #: ###-#### Inspection requested via web by David Thompson//corrections made// nails added at front and rear walls, staples used for conversion on side wall per engineering//hot dipped nails used in pt//
|
BLD19-00534
| BLD-Conference | 4/21/2020 | 4/22/2020 | 4/22/2020 11:57:54 AM | A | DONE |
|
|
Discuss phased turnover and clubhouse firestopping. Phone #: ###-#### Inspection requested via web by Travis Blackburn
|
BLD19-00534
| BLD-Framing/Rough-in | 4/21/2020 | 4/22/2020 | 4/22/2020 11:57:40 AM | A | PART |
|
|
Framing inspection to insulate 2nd floor only. Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to insulate 2nd floor//collars on 3rd and 4th floor installed, and joist repairs were made//
|
BLD19-04742
| BLD-Footing | 4/21/2020 | 4/22/2020 | 4/22/2020 10:44:43 AM | A | PEND |
|
|
screened // David Phone #: ###-####//need ro resubmit new engineering for change in design and specify which footings/columns have changed//approved plans/engineering show new columns, piers and footings//new engineering shows built up footings around west end footings//please specify actual location of new design and where existing footings/columns are to remain//pending city approval//
|
BLD20-01190
| BLD-Final | 4/21/2020 | 4/22/2020 | 4/22/2020 10:07:28 AM | A | PASS |
|
|
window // Patricia - call Wayne for window location Phone #: ###-####
|
BLD20-01190
| DOC - Permit Finaled | 4/22/2020 | 4/22/2020 | 4/22/2020 10:07:11 AM | P | PASS |
|
|
|
BLD20-00444
| BLD-Energy code compliance | 4/21/2020 | 4/22/2020 | 4/22/2020 9:45:48 AM | A | PASS |
|
|
Screened- Allen Phone #: ###-####//meets rescheck requirements//framing corrections made//
|
BLD20-00857
| BLD-Framing/Rough-in | 4/21/2020 | 4/22/2020 | 4/22/2020 9:40:48 AM | A | PASS |
|
|
Call prior to going Phone #: 2086069534 >> Inspection requested via mobile web by Isaac Gomez//complete VIA Virtual inspection as home is occupied during pandemic//appears to meet plans, discussed walls and appear to be non load bearing//ok to continue//
|
BLD19-04651
| BLD-Energy code compliance | 4/21/2020 | 4/22/2020 | 4/21/2020 1:47:04 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Damion Jordan//updated Rescheck was provided for energy trade offs//the insulation and windows are now compliant with the rescheck trade off values//report provided by designer//
|