Inspections for the day of: Wednesday, April 22, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02788 BLD-Aging Inspection4/22/20204/22/20204/27/2020 7:20:08 AM PASS
wip
BLD20-01317 BLD-Final4/22/20204/22/20204/22/2020 3:28:01 PMPPEND
please call so i can meet and let you in. 20 min notice is preferable.
Thanks
Tim Phone #: ###-#### Inspection requested via web by Tim Lenberg//need zoning sign off//otherwise ok, contactor stated no temp needed as no wet areas or close to doors//did not enter due to pandemic guidelines//
BLD20-00359 BLD-Footing4/22/20204/22/20204/22/2020 3:17:34 PMPPART
screened - Michael Phone #: ###-####//plan modification plans were used from documents folder//rebar was elevated and photos sent//
BLD20-01246 BLD-Other4/22/20204/22/20204/22/2020 3:16:18 PMPDONE
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-01246 DOC - Permit Finaled4/22/20204/22/20204/22/2020 3:16:10 PMPPASS
roof appears to be installed within code requirements//
BLD20-01136 BLD-Foundation4/22/20204/22/20204/22/2020 3:08:07 PMPPASS
wall // Vince Phone #: ###-####
BLD19-04669 BLD-Energy code compliance4/22/20204/22/20204/22/2020 2:20:15 PMPPASS
Vince Phone #: ###-####
BLD20-00670 BLD-Wall Bracing4/21/20204/22/20204/22/2020 12:46:42 PMPPASS
Shear inspection Phone #: ###-#### Inspection requested via web by David Thompson//corrections made// nails added at front and rear walls, staples used for conversion on side wall per engineering//hot dipped nails used in pt//
BLD19-00534 BLD-Conference4/21/20204/22/20204/22/2020 11:57:54 AMADONE
Discuss phased turnover and clubhouse firestopping. Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD19-00534 BLD-Framing/Rough-in4/21/20204/22/20204/22/2020 11:57:40 AMAPART
Framing inspection to insulate 2nd floor only. Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to insulate 2nd floor//collars on 3rd and 4th floor installed, and joist repairs were made//
BLD19-04742 BLD-Footing4/21/20204/22/20204/22/2020 10:44:43 AMAPEND
screened // David Phone #: ###-####//need ro resubmit new engineering for change in design and specify which footings/columns have changed//approved plans/engineering show new columns, piers and footings//new engineering shows built up footings around west end footings//please specify actual location of new design and where existing footings/columns are to remain//pending city approval//
BLD20-01190 BLD-Final4/21/20204/22/20204/22/2020 10:07:28 AMAPASS
window // Patricia - call Wayne for window location Phone #: ###-####
BLD20-01190 DOC - Permit Finaled4/22/20204/22/20204/22/2020 10:07:11 AMPPASS
BLD20-00444 BLD-Energy code compliance4/21/20204/22/20204/22/2020 9:45:48 AMAPASS
Screened- Allen Phone #: ###-####//meets rescheck requirements//framing corrections made//
BLD20-00857 BLD-Framing/Rough-in4/21/20204/22/20204/22/2020 9:40:48 AMAPASS
Call prior to going Phone #: 2086069534 >> Inspection requested via mobile web by Isaac Gomez//complete VIA Virtual inspection as home is occupied during pandemic//appears to meet plans, discussed walls and appear to be non load bearing//ok to continue//
BLD19-04651 BLD-Energy code compliance4/21/20204/22/20204/21/2020 1:47:04 PMAPASS
Phone #: ###-#### Inspection requested via web by Damion Jordan//updated Rescheck was provided for energy trade offs//the insulation and windows are now compliant with the rescheck trade off values//report provided by designer//