MIS17-00326
| MIS-Aging Inspection | 4/29/2020 | 4/29/2020 | 5/4/2020 7:15:09 AM | | DONE |
|
|
old MIS
|
BLD20-01152
| BLD-Footing | 4/28/2020 | 4/29/2020 | 4/29/2020 4:03:22 PM | P | NH |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron aggregate construct//no one oniste//will reschedule//
|
BLD19-02700
| BLD-Conference | 3/25/2020 | 4/29/2020 | 4/29/2020 2:46:41 PM | A | DONE |
|
|
status on easments//Brandon Phone #: ###-####//discussed with Brandon, no information yet on if easment has been vacated// will check back in 30 days or Brandon will contact me//
|
BLD19-04891
| BLD-Ceiling Grid Inspection | 4/28/2020 | 4/29/2020 | 4/29/2020 1:34:42 PM | P | PASS |
|
|
I would like to meet you onsite to review any correction if need be.
Thanks, Drew Moorhouse McCarter-Moorhouse ###-####
Phone #: ###-#### Inspection requested via web by Drew Moorhouse// fix insulation above exam area//add clips to wall connections in back room, other wise ok to cover grid//will meet Drew thursday regarding med gas room and fire wall//
|
BLD19-00527
| BLD-Framing/Rough-in | 4/28/2020 | 4/29/2020 | 4/29/2020 12:21:28 PM | A | NR |
|
|
Corridor inspection to be able to hang lids Phone #: ###-#### Inspection requested via web by Travis Blackburn//walkthrough on corridor framing--minor framing corrections, nails hangers, fire caulking, add lags as discussed//address stair stringer attachment as it differs from plan details///
|
BLD20-00844
| BLD-Final | 4/28/2020 | 4/29/2020 | 4/29/2020 10:59:23 AM | A | NR |
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Candyce Moss//CN posted//need to fill footing in around post nearest to house, small area unfilled with concrete// please provide post to beam attachment//roof attachment appears to be missing the 3"x3" post to bracket per the engineering, please address or provide design for the attachment method used//
|
BLD20-00232
| BLD-Framing/Rough-in | 4/28/2020 | 4/29/2020 | 4/29/2020 9:09:22 AM | A | PASS |
|
|
Jay Walters is the onsite contact ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting//no changes to roof structure per engineer letter//layout in progress, appears to be in accordance with approved plans, 3 foot from eaves per plans//WIP//
|
BLD20-01393
| BLD-Final | 4/27/2020 | 4/29/2020 | 4/29/2020 8:48:49 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Scott Smith
|
BLD20-01393
| DOC - Permit Finaled | 4/29/2020 | 4/29/2020 | 4/29/2020 8:48:39 AM | P | PASS |
|
|
appears new roof flashings were installed//no access to roof//roof appears to be installed within code requirements//no access to back//
|