BLD19-04891
| BLD-Conference | 4/29/2020 | 4/30/2020 | 4/30/2020 2:51:55 PM | P | DONE |
|
|
meet Drew ###-####//discuss med gas room, need architect to approve as built design, 2x6 wall does not extend to underside of roof deck, although shaft is lined with 2 layers 5/8 typ X, walls below are 2x6 with 5/8 type x on both sides//does not match plans//
|
BLD20-01345
| BLD-Other | 4/30/2020 | 4/30/2020 | 4/30/2020 2:49:44 PM | P | DONE |
|
|
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-01345
| DOC - Permit Finaled | 4/30/2020 | 4/30/2020 | 4/30/2020 2:49:35 PM | P | PASS |
|
|
roof appears to be installed within code requirements//
|
BLD19-00527
| BLD-Wall cover | 4/29/2020 | 4/30/2020 | 4/30/2020 2:26:43 PM | A | NR |
|
|
Drop ceiling inspection for cover on 3rd floor and 2nd if time permits Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to have plumbing inspections passed prior to inspection///
|
BLD19-00527
| BLD-Framing/Rough-in | 4/29/2020 | 4/30/2020 | 4/30/2020 2:26:02 PM | A | PEND |
|
|
Corridor reinspect for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//corridor corrections made//Fire sprinkler inspection failed, need to have approval for fire sprinklers prior to any cover//
|
BLD20-01018
| BLD-Footing | 4/30/2020 | 4/30/2020 | 4/30/2020 2:20:19 PM | P | PASS |
|
|
Brandon Phone #: ###-####//side setbacks maintain existing//40 plus feet in rear//ok per plans//
|
BLD20-01247
| BLD-Conference | 4/30/2020 | 4/30/2020 | 4/30/2020 1:05:13 PM | P | DONE |
|
|
met Lloyd with Point roofing on a differnet job, let him know concerns with this project, he said he would get someone to look at the issue and get back with me//possibly flash under vents to prevent wind driven rain to enter the flashing-showed him photos of the project//
|
BLD19-03209
| BLD-Framing/Rough-in | 4/30/2020 | 4/30/2020 | 4/30/2020 12:35:38 PM | P | PART |
|
|
Please give me a call when you are on your way. Phone #: ###-#### Inspection requested via web by tom mccalister//phase 3 restrooms and open work room, wall framing ok, add bracing at double/plumbing wall//
|
BLD19-04887
| BLD-Framing/Rough-in | 4/29/2020 | 4/30/2020 | 4/30/2020 11:08:21 AM | A | PASS |
|
|
screened // Brett Phone #: ###-####//ok to insulate//
|
BLD20-01152
| BLD-Footing | 4/29/2020 | 4/30/2020 | 4/30/2020 10:30:14 AM | A | PART |
|
|
south side, front and rear setbacks per plans//side with canal measured at center of bridge meets 15'4" on plans//rebar per plans//talked with Andy about ESC permit, notified concrete guys of washout containment, stated they would washout offsite//north side will need to comply with 2' frost depth requirements and contain water onsite--will need to be addressed by contractor//
|
BLD19-02398
| BLD-Energy code compliance | 4/29/2020 | 4/30/2020 | 4/30/2020 8:57:50 AM | A | PART |
|
|
Insulation / Cover Inspection at Fire Riser Room Phone #: ###-#### Inspection requested via web by Wes palm//add insulation as discussed//architect provided 1hr detail//light needs to surface mount//door needs to be 1hr per plans, current door is not rated//
|
BLD20-00344
| BLD-Framing/Rough-in | 4/29/2020 | 4/30/2020 | 4/30/2020 8:18:07 AM | A | PART |
|
|
Confirmation to sheetrock inspected soffits throughout Phone #: ###-#### Inspection requested via web by Miles Gastil//ok to cover soffits, 2-where mechanical is present, and fire spinklers signed off, also areas where no mechanical, but electrical and fire sprinklers are approved//framing was looked at previously, ok now that rough ins have been approved//
|