Inspections for the day of: Friday, May 1, 2020.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-00230 BLD-Concrete5/1/20205/1/20205/1/2020 3:46:19 PMPPART
Phone #: ###-#### Inspection requested via web by Andy Thompson//concrete was already poured//could see edges of VB//
BLD19-04366 BLD-Other4/30/20205/1/20205/1/2020 3:11:39 PMPPART
roof nailing // melvan Phone #: ###-####//ok when nails added in the field at 6" oc per plans//
BLD19-04205 BLD-Blower Door Test Results5/1/20205/1/20205/1/2020 1:25:52 PMPDONE
2.96 ACH 50
BLD18-02912 BLD-Final5/1/20205/1/20205/1/2020 12:35:18 PMPFAIL
Garage code is 2583 to access house. Phone #: ###-#### Inspection requested via web by Braden Holbrook//CN posted, left on kitchen counter//
BLD19-00527 BLD-Wall cover4/30/20205/1/20205/1/2020 11:39:12 AMAPART
If time allows, cover inspection for drop ceilings on 3rd floor. Phone #: ###-#### Inspection requested via web by Travis Blackburn//Plumbing rough in has passed, other rough ins ok//drops on 3rd floor ok when areas around mechanical on exterior walls have been insulated//
BLD20-01152 BLD-Foundation4/30/20205/1/20205/1/2020 11:34:26 AMAPART
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo //side 5' setback right on foundationn wall//front and rear ok// rebar ok per plans//discussed frost depth and drainage on 5' side, as elevation seems high//
BLD19-04205 BLD-Final4/30/20205/1/20205/1/2020 11:22:30 AMAPASS
Screened-Christina Phone #: ###-####
BLD19-04205 DOC - Permit Finaled5/1/20205/1/20205/1/2020 11:22:15 AMPPASS
BLD19-00526 BLD-Framing/Rough-in4/30/20205/1/20205/1/2020 10:38:27 AMAPART
Inspect truss bracing and hardware on 3rd floor Phone #: ###-#### Inspection requested via web by Travis Blackburn//truss bracing and layout, see layout sheet for minor corrections, need details on truss clips at walls, ad hardware at blocking along corridors//west half of building was looked at//will need to verify corrections//
BLD20-01425 BLD-Final4/29/20205/1/20205/1/2020 9:01:44 AMADONE
Final roof inspection Phone #: ###-#### Inspection requested via web by Nicholas Ziegler
BLD20-01425 DOC - Permit Finaled5/1/20205/1/20205/1/2020 9:01:29 AMPPASS
//metal valley flashing installed//continuous ridge vent installed//roof appears to be installed within code requirements//