Inspections for the day of: Wednesday, May 13, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-00075 BLD-Aging Inspection5/13/20205/13/20205/14/2020 7:06:51 AM PEND
BLD20-00430 BLD-Framing/Rough-in5/13/20205/13/20205/14/2020 7:06:36 AMPCANC
House is occupied. Phone #: ###-#### Inspection requested via web by pat raymes
BLD19-03180 BLD-Wall Bracing5/13/20205/13/20205/13/2020 3:31:41 PMPFAIL
Firewall Shear Phone #: ###-#### Inspection requested via web by Carl Funk//Not ready, not all walls hung, nailing needs to be done at all plates//still need verifiction of ele heater boxes in firewall//
BLD19-03181 BLD-Wall Bracing5/13/20205/13/20205/13/2020 3:31:26 PMPFAIL
Firewall Shear Inspection requested via web by Carl Funk//Not ready, not all walls hung, nailing needs to be done at all plates//still need verifiction of ele heater boxes in firewall//
BLD19-03187 BLD-Wall Bracing5/13/20205/13/20205/13/2020 3:31:11 PMPFAIL
Firewall shear Inspection requested via web by Carl Funk//Not ready, not all walls hung, nailing needs to be done at all plates//still need verifiction of ele heater boxes in firewall//
BLD19-03188 BLD-Wall Bracing5/13/20205/13/20205/13/2020 3:30:52 PMPFAIL
Firewall Shear Inspection requested via web by Carl Funk//Not ready, not all walls hung, nailing needs to be done at all plates//still need verifiction of ele heater boxes in firewall//
MIS20-00157 BLD-Conference5/13/20205/13/20205/13/2020 3:08:18 PMPDONE
no one home CN left on door mat at front door//roofing being done without permits//follow up in 5 days//
BLD20-00680 BLD-Footing5/12/20205/13/20205/13/2020 2:07:15 PMPPART
Screened-pour time is at 2pm-Mark Phone #: ###-####//talked with Sue at zoning, verified minumum setback is 20 feet from front pin to garage//setbacks per plans, and minimum per zoning in front//need to delete rebar note from plans as general does not want it installed//
BLD20-00774 BLD-Footing5/12/20205/13/20205/13/2020 2:06:57 PMPPART
Screened-pour time is at 2pm-Mark Phone #: ###-####//talked with Sue at zoning, verified minumum setback is 20 feet from front pin to garage//setbacks per plans, and minimum per zoning in front//need to delete rebar note from plans as general does not want it installed//
BLD20-00704 BLD-Footing5/12/20205/13/20205/13/2020 2:06:41 PMPPART
Screened-pour time is at 2pm-Mark Phone #: ###-####//talked with Sue at zoning, verified minumum setback is 20 feet from front pin to garage//setbacks per plans, and minimum per zoning in front//need to delete rebar note from plans as general does not want it installed//
BLD19-00530 BLD-Concrete5/13/20205/13/20205/13/2020 1:12:17 PMPPEND
Thickened footing rebar before slab pour Phone #: ###-#### Inspection requested via web by Travis Blackburn//VB ok//rebar needs to be elevated for clearances--pending specials//
BLD19-00526 BLD-Framing/Rough-in5/12/20205/13/20205/13/2020 1:11:40 PMPPART
Review framing on corridors at all floors Phone #: ###-#### Inspection requested via web by Travis Blackburn//minor framing corrections and fire caulking needed//jeremy will take photos, all areas are marked on walls in red//
BLD20-00380 BLD-Wall Bracing5/12/20205/13/20205/13/2020 10:20:24 AMAPASS
Screened-Randy Phone #: ###-####//corrections made//add nails at 3" oc at portal//
BLD20-01215 BLD-Footing5/12/20205/13/20205/13/2020 10:18:44 AMAPART
Fooring inspection can be done in the AM tomorrow. Nick is the installer on this and his cell phone is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch//working on cleaning out larger holes, ok when complete//
BLD19-04887 BLD-Wall Bracing5/12/20205/13/20205/13/2020 9:49:35 AMAPASS
shear // Brett Phone #: ###-####//ok when screws added as discussed on interior shear walls//
BLD20-00933 BLD-Wall Bracing5/12/20205/13/20205/13/2020 8:59:50 AMANH
virtual inspection requested // Jason Phone #: ###-####//left VM, exterior shear, should be able to perform onsite inspeciton//no one onsite, no answer on phone, will need to reshedule when someone is onsite or I have access to back//