Inspections for the day of: Monday, May 18, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00873 BLD-Aging Inspection5/18/20205/18/20205/20/2020 12:01:35 PM PEND
BLD19-03209 BLD-Ceiling Grid Inspection5/18/20205/18/20205/18/2020 4:02:48 PMPPART
Screened // Tom Phone #: ###-####//phase 3 and a portion of phase 4//fix clips in areas noted prior to floodinng grid//
BLD19-04013 BLD-Wall Bracing5/18/20205/18/20205/18/2020 4:02:01 PMPFAIL
Matt *screened* Phone #: ###-####//Still need RFI for densglass shear walls in corridors//plans show all shear walls to be wood structural panels, and plans do not have nailing or shear schedule for densglass//
BLD19-00526 BLD-Framing/Rough-in5/18/20205/18/20205/18/2020 3:13:16 PMPNR
1st floor inspection to allow insulation Phone #: ###-#### Inspection requested via web by Travis Blackburn//too many corrections, will call back in//
BLD19-00526 BLD-Energy code compliance5/18/20205/18/20205/18/2020 2:16:30 PMPPART
2nd floor insulation inspection for cover approval Phone #: ###-#### Inspection requested via web by Travis Blackburn//2nd floor energy ok, add in one location as discussed//
BLD18-00847 BLD-Conference5/15/20205/18/20205/18/2020 12:05:09 PMADONE
Status?//correction notice posted to get permit finaled//still need zoning approval of as is parking, provide hard surface treads and landings at steps, need to be code compliant//
BLD16-01125 BLD-Conference5/15/20205/18/20205/18/2020 11:56:52 AMADONE
Status? Any change?//left notice permit will expire in 10 days, follow up has been scheduled//also other construction demo located in driveway, left notice to obtain permit if needed//
BLD20-01191 BLD-Framing/Rough-in5/15/20205/18/20205/18/2020 11:30:45 AMAFAIL
Chris *screened* Phone #: ###-####//left correction notice and called Chris//need more detailed plans for structural//noted on correction, may need structural evaluation from engineer//
BLD19-03254 BLD-Energy code compliance5/18/20205/18/20205/18/2020 11:09:38 AMAPART
firewall insulation Inspection requested via web by Carl Funk//fire wall insulation only ok//call for shear on gyp//
BLD19-03255 BLD-Energy code compliance5/18/20205/18/20205/18/2020 11:09:22 AMAPART
Inspection requested via web by Carl Funk//fire wall insulation only ok//call for shear on gyp//
BLD19-03256 BLD-Energy code compliance5/18/20205/18/20205/18/2020 11:09:06 AMAPART
Inspection requested via web by Carl Funk//fire wall insulation only ok//call for shear on gyp//
BLD19-03257 BLD-Energy code compliance5/18/20205/18/20205/18/2020 11:08:46 AMAPART
Inspection requested via web by Carl Funk//fire wall insulation only ok//call for shear on gyp//
BLD20-01152 BLD-Wall Bracing5/15/20205/18/20205/18/2020 9:57:46 AMANR
Call Alex at ###-#### with any questions! Phone #: ###-#### Inspection requested via web by Alex Macdonald
BLD19-04398 BLD-Framing/Rough-in5/14/20205/18/20205/18/2020 9:41:47 AMAPART
call for access- Shellie *screened* Phone #: ###-####//see correction notice//add 2x6 at 8"oc across entire furnace platform//remove area of platform over closet bathroom area//add supports to rafters to beam over vault area and take photos for verification//ok to insulate and complete air seal//
BLD19-04385 BLD-Final5/18/20205/18/20205/18/2020 8:57:39 AMAPASS
zoning confirmed sign off via email////ACHD permit finaled//no fire lifesafety as this is a residential IRC building//final corrections were completed//
BLD19-04385 DOC - Permit Finaled5/18/20205/18/20205/18/2020 8:57:27 AMPPASS