Inspections for the day of: Wednesday, May 27, 2020.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-00381 BLD-Wall Bracing5/27/20205/27/20205/27/2020 4:13:51 PMPPART
Randy Phone #: ###-####//ok when nails added per discussion//
BLD16-01125 BLD-Conference5/27/20205/27/20205/27/2020 3:01:10 PMPDONE
owner stated project is in litigation with previous contractor//let supervisor know what is going on//
MIS20-00174 BLD-Conference5/27/20205/27/20205/27/2020 2:56:59 PMPCANC
not needed per Daryl
BLD20-00381 BLD-Other5/27/20205/27/20205/27/2020 1:57:20 PMPPASS
separation wall between units ok per plans//previously inspected prior to wall being stood in place//
BLD19-03873 BLD-Final5/26/20205/27/20205/27/2020 1:56:47 PMPNR
Eddie Phone #: ###-####//need city approved plans for final//need zoning final sign off//reviewed special inspection reports, missing special inspection for bolts and racking//let Eddie know he will be getting back with me//
BLD20-01494 BLD-Framing/Rough-in5/27/20205/27/20205/27/2020 12:52:40 PMPPART
Hoping for AM! Phone #: ###-#### Inspection requested via web by David Dexter//ok when all the screws have been installed per plans//they were adding the screws when I left//this inspections was of mechanical connections at existing truss tails//
BLD19-02700 BLD-Conference4/29/20205/27/20205/27/2020 11:16:22 AMADONE
follow up on easement//###-####//Brandon//approved by council, waiting on signed resolution and ok from zoning//will follow up//
BLD19-03180 BLD-Energy code compliance5/27/20205/27/20205/27/2020 11:14:43 AMAPART
Inspection requested via web by Carl Funk//add hangers to area above stairs as discussed//add VB at areas discussed//add truss bracing//add r20 min inuslation in areas r19 was installed//framing that is different than plans is in accordance with engineers site walk though and accepted by him on the first eight units, same framing used on this unit//
BLD19-03181 BLD-Energy code compliance5/27/20205/27/20205/27/2020 11:14:26 AMAPART
Inspection requested via web by Carl Funk//add hangers to area above stairs as discussed//add VB at areas discussed//add truss bracing//add r20 min inuslation in areas r19 was installed//framing that is different than plans is in accordance with engineers site walk though and accepted by him on the first eight units, same framing used on this unit//
BLD19-03187 BLD-Energy code compliance5/27/20205/27/20205/27/2020 11:14:11 AMAPART
Inspection requested via web by Carl Funk//add hangers to area above stairs as discussed//add VB at areas discussed//add truss bracing//add r20 min inuslation in areas r19 was installed//framing that is different than plans is in accordance with engineers site walk though and accepted by him on the first eight units, same framing used on this unit//
BLD19-03188 BLD-Energy code compliance5/27/20205/27/20205/27/2020 11:13:52 AMAPART
Inspection requested via web by Carl Funk//add hangers to area above stairs as discussed//add VB at areas discussed//add truss bracing//add r20 min inuslation in areas r19 was installed//framing that is different than plans is in accordance with engineers site walk though and accepted by him on the first eight units, same framing used on this unit//
BLD20-00337 BLD-Footing5/26/20205/27/20205/27/2020 10:09:22 AMAPART
asked for between 9-11 if possible // Jason Phone #: ###-####//more area A footings for gym//footing sizes ok per plans//pending all special inspections//
BLD19-01221 BLD-Energy code compliance5/26/20205/27/20205/27/2020 9:33:51 AMAPASS
screened // Dave Phone #: ###-####//shear was previously inspected, just not noted//energy ok//deck framinng ok per plans//