MIS19-00176
| MIS-Aging Inspection | 6/11/2020 | 6/11/2020 | 6/12/2020 7:28:11 AM | | DONE |
|
|
|
BLD19-00299
| BLD-Aging Inspection | 6/11/2020 | 6/11/2020 | 6/12/2020 7:27:09 AM | | PEND |
|
|
|
BLD20-00380
| BLD-Framing/Rough-in | 6/11/2020 | 6/11/2020 | 6/12/2020 7:25:57 AM | P | CANC |
|
|
Randy Phone #: ###-####
|
BLD19-00533
| BLD-Wall Bracing | 6/10/2020 | 6/11/2020 | 6/11/2020 3:37:08 PM | P | PART |
|
|
Inspect floor to floor straps for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//exterior floor to floor strapping ok--north end 4 straps need to be changed to meet requirements//
|
BLD19-00535
| BLD-Framing/Rough-in | 6/10/2020 | 6/11/2020 | 6/11/2020 3:36:26 PM | P | PART |
|
|
Inspect Holddowns at 1st floor and interior shear Phone #: ###-#### Inspection requested via web by Travis Blackburn//hold downs ok--tighten nut in one location//shear walls need nails added to meet 3" oc requirement--call back in and check floor to floor strapping all levels//
|
BLD19-00526
| BLD-Wall Bracing | 6/10/2020 | 6/11/2020 | 6/11/2020 3:35:10 PM | P | PART |
|
|
Gyp shear inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//screws need to meet 4" oc per plans in units-301,304,305 and 312//third floor inspection only//
|
BLD19-04366
| BLD-Final | 6/9/2020 | 6/11/2020 | 6/11/2020 3:21:55 PM | P | PART |
|
|
screened // Melvin Phone #: ###-####//need verification of ACHD sign off//need special inspection reports//provide RFI structural details for opening steel framing that does not reflect design on plans, bolting, member size, etc//ok to use vault as fire life safety has passed//
|
BLD20-00370
| BLD-Framing/Rough-in | 6/11/2020 | 6/11/2020 | 6/11/2020 2:28:33 PM | P | PART |
|
|
call for access // Luke Phone #: ###-####//add strapping to front wall take photos and installed shear panel//add bracing to girder truss//provide engineering ok for single king stud in place of 2 king studs listed on engineering//ok to insulate//
|
BLD19-04013
| BLD-Wall cover | 6/11/2020 | 6/11/2020 | 6/11/2020 1:56:54 PM | P | PART |
|
|
screened // Matthew Phone #: ###-####//3rd 6 units 2nd floor drops--corrections made//architect approved fire blocking fix for first 4 2nd floor drops//remaining drops will have gyp on walls//
|
BLD19-02684
| BLD-Conference | 6/11/2020 | 6/11/2020 | 6/11/2020 1:40:02 PM | P | DONE |
|
|
Screened- please call if possible-Stewert Phone #: ###-####//shear questions//
|
BLD19-04625
| BLD-Final | 6/11/2020 | 6/11/2020 | 6/11/2020 12:22:21 PM | P | PASS |
|
|
screened // john Phone #: ###-####//final occupancy ok as fire life safety has been completed//signed card//
|
BLD20-01716
| BLD-Framing/Rough-in | 6/10/2020 | 6/11/2020 | 6/11/2020 11:25:46 AM | A | DONE |
|
|
Jay Walters is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting//stopped by, no changes to structure required by engineer//ELE rough complete//let them know to call in final//
|
BLD20-00337
| BLD-Foundation | 6/10/2020 | 6/11/2020 | 6/11/2020 10:13:20 AM | A | PART |
|
|
Chase *screened* Phone #: ###-####//portions of area B and C walls//ok when bar clearances are corrected//pend all specials//
|
BLD20-00337
| BLD-Footing | 6/10/2020 | 6/11/2020 | 6/11/2020 9:49:16 AM | A | CANC |
|
|
Chase *screened* Phone #: ###-####//previously inspected area A footing//
|