Inspections for the day of: Friday, June 14, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00226 MIS-Aging Inspection6/14/20196/14/20196/20/2019 3:52:14 PM DONE
BLD19-01620 BLD-Final6/13/20196/14/20196/14/2019 3:26:07 PMPPASS
Phone #: ###-#### Inspection requested via web by Michael La Pointe//roof appears to be installed per code requirements//new roof flashing and vents installed.//
BLD19-00833 BLD-Framing/Rough-in6/14/20196/14/20196/14/2019 3:21:40 PMPPASS
ok to insulate only//provide truss fix//nail hangers// fill hole under tub//
BLD18-04401 BLD-Wall Bracing6/14/20196/14/20196/14/2019 2:47:56 PMPPART
Rudy Phone #: ###-####//nailing ok per plans// add hold downs at corner windows (Front) per plans//check at framing//
BLD18-03837 BLD-Blower Door Test Results6/14/20196/14/20196/14/2019 1:46:11 PMPDONE
5.69 ACH 2950 Pa
BLD18-03837 BLD-Final6/14/20196/14/20196/14/2019 1:11:54 PMPDONE
blowe door 5.69 ACH 2950 Pa
BLD18-03837 BLD-Final6/14/20196/14/20196/14/2019 1:06:07 PMPPASS
final complete oer plans//steps were added to back doors//fine grade to be completed//
BLD18-03837 DOC - Permit Finaled6/14/20196/14/20196/14/2019 1:05:17 PMPPASS
BLD19-00754 BLD-Footing6/14/20196/14/20196/14/2019 12:45:15 PMPPASS
Jim Phone #: ###-####//surveyed point installed. setbacks meet requirements per plans//
BLD19-00362 BLD-Foundation6/13/20196/14/20196/14/2019 12:20:01 PMAPART
stem wall // Troy Phone #: ###-####//walls ok on west side//pending special inspection ok to pour//
BLD19-01314 BLD-Footing6/14/20196/14/20196/14/2019 12:19:04 PMPPASS
Phone #: 2086971241 >> Inspection requested via mobile web by Heron//setbacks ok per site plan//rebar installed per plans. //
BLD19-01613 BLD-Foundation6/14/20196/14/20196/14/2019 10:56:31 AMAPART
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro //rebar ok per plans//work in progress//holddowns and anchor bolts onsite.//vents onsite//
BLD18-03837 BLD-Aging Inspection6/14/20196/14/20196/14/2019 9:44:49 AM NR
inspection scheduled for final on 6/14/2019. not ready.
BLD19-00670 BLD-Energy code compliance6/13/20196/14/20196/14/2019 9:40:01 AMAPART
Brandon Phone #: ###-####//air seal complete.// insulate walls and call for re-inspection//
BLD18-04216 BLD-Final6/13/20196/14/20196/14/2019 8:58:17 AMAPASS
Pepper Phone #: ###-####//carport installed per engineered plans//
BLD18-03837 BLD-Final6/13/20196/14/20196/14/2019 8:36:52 AMANR
Eric-call for the access code Phone #: ###-####//steps at kitchen bedroom door still not complete//grading needs to be completed around house and foundation fall 6" in 10 feet around building.//