MIS19-00178
| MIS-Aging Inspection | 6/16/2020 | 6/16/2020 | 6/19/2020 7:23:23 AM | | DONE |
|
|
permit is finaled
|
BLD20-01018
| BLD-Wall Bracing | 6/16/2020 | 6/16/2020 | 6/16/2020 3:49:25 PM | P | PASS |
|
|
ok to wrap when nails added as dicussed//
|
BLD20-01018
| BLD-Framing/Rough-in | 6/15/2020 | 6/16/2020 | 6/16/2020 3:49:12 PM | P | CANC |
|
|
James *screened* Phone #: ###-####
|
BLD20-01596
| BLD-Wall cover | 6/15/2020 | 6/16/2020 | 6/16/2020 3:44:43 PM | P | PART |
|
|
Jerrold- picture inspection please, call please, traveled out of state in last 14 days. Phone #: ###-####//area around tub ok to cover when insulation added and niche is moved to the interior wall//this is only for partial cover in this area as mechanical and electrical will need to be completed prior to any other areas covered//
|
BLD20-01839
| BLD-Final | 6/16/2020 | 6/16/2020 | 6/16/2020 3:20:12 PM | P | DONE |
|
|
Inspection on a completed metal roofing project. Previous roof was peeled back during a wind storm. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-01839
| DOC - Permit Finaled | 6/16/2020 | 6/16/2020 | 6/16/2020 3:19:58 PM | P | PASS |
|
|
new standing seam roofing installed//no access to roof//appears to be complete--trim installed//can see at soffit areas that some decking was replaced//limited access to view roof//
|
MIS20-00197
| BLD-Conference | 6/15/2020 | 6/16/2020 | 6/16/2020 2:29:03 PM | A | DONE |
|
|
CN issued for re-roof//Brian mechanical inspecor witnessed roof being installed// follow up in 10 days//
|
BLD20-01637
| BLD-Energy code compliance | 6/16/2020 | 6/16/2020 | 6/16/2020 1:28:14 PM | P | PASS |
|
|
Screened- Derek Phone #: ###-####//ok when insulation added to rim board area and at the plumbing chase on exterior wall--will take photos of this completed//close cell foam with value of roughly R21 installed//
|
BLD20-00225
| BLD-Foundation | 6/15/2020 | 6/16/2020 | 6/16/2020 1:18:07 PM | P | PART |
|
|
Screened-foundation wall Phone #: ###-####//ok//still need to remove rebar from plans//setbacks still appear to be ok//WIP//
|
BLD19-00535
| BLD-Framing/Rough-in | 6/15/2020 | 6/16/2020 | 6/16/2020 12:18:25 PM | A | PART |
|
|
Inspection on 3rd and 4th floor for approval to insulate Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to insulate//need fire approval//add firecaulk as discussed//fix studs//shear ok//
|
BLD20-01921
| BLD-Final | 6/15/2020 | 6/16/2020 | 6/16/2020 11:58:54 AM | P | CANC |
|
|
Pls contact Bryce (Foreman) @ ###-#### or George (Electrician) @ ###-#### one hr prior as someone will need to meet inspector on site. Thanks in advance. >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Rob Maes
|
BLD20-01131
| BLD-Framing/Rough-in | 6/15/2020 | 6/16/2020 | 6/16/2020 10:59:56 AM | A | DONE |
|
|
Taylor Barton is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting//onsite contact stated no structural changes were being done//will schedule final//
|
BLD20-01299
| BLD-Conference | 6/15/2020 | 6/16/2020 | 6/16/2020 10:37:24 AM | A | DONE |
|
|
Miles *screened* Phone #: ###-####//discussed inspection timelines//slab cutouts and rebar ok per plans--pend any electrical, mechanical or plumbing rough in inspections//
|
BLD17-00258
| BLD-Final | 6/15/2020 | 6/16/2020 | 6/16/2020 10:25:55 AM | A | NR |
|
|
Shawn Phone #: ###-####//need to have plumbing permit and final//original permit is expired//let contact know to re-schedule//
|
BLD19-04013
| BLD-Energy code compliance | 6/15/2020 | 6/16/2020 | 6/16/2020 10:19:33 AM | A | FAIL |
|
|
screened // Matt Phone #: ###-####//label fire walls in attic--fire caulk penetrations//wall insulation does not meet rescheck//window u-values do not meet rescheck//1 hour rated laydown parapet was not installed for 4' from separation walls at deck//need fire sprinkler tenting inspection//
|
BLD20-00380
| BLD-Energy code compliance | 6/15/2020 | 6/16/2020 | 6/16/2020 9:29:29 AM | A | PASS |
|
|
screened // Randy Phone #: ###-####//plans show r 49 insulation, let builder know to post on certification for final//
|
MIS20-00178
| BLD-Conference | 6/2/2020 | 6/16/2020 | 6/16/2020 8:40:18 AM | A | DONE |
|
|
follow up on permits
|
MIS20-00178
| DOC - Permit Finaled | 6/16/2020 | 6/16/2020 | 6/16/2020 8:40:08 AM | P | PASS |
|
|
roof permit was issued and finaled//other permits were for minor hvac changes and a new water heater//
|