Inspections for the day of: Tuesday, June 16, 2020.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS19-00178 MIS-Aging Inspection6/16/20206/16/20206/19/2020 7:23:23 AM DONE
permit is finaled
BLD20-01018 BLD-Wall Bracing6/16/20206/16/20206/16/2020 3:49:25 PMPPASS
ok to wrap when nails added as dicussed//
BLD20-01018 BLD-Framing/Rough-in6/15/20206/16/20206/16/2020 3:49:12 PMPCANC
James *screened* Phone #: ###-####
BLD20-01596 BLD-Wall cover6/15/20206/16/20206/16/2020 3:44:43 PMPPART
Jerrold- picture inspection please, call please, traveled out of state in last 14 days. Phone #: ###-####//area around tub ok to cover when insulation added and niche is moved to the interior wall//this is only for partial cover in this area as mechanical and electrical will need to be completed prior to any other areas covered//
BLD20-01839 BLD-Final6/16/20206/16/20206/16/2020 3:20:12 PMPDONE
Inspection on a completed metal roofing project. Previous roof was peeled back during a wind storm. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-01839 DOC - Permit Finaled6/16/20206/16/20206/16/2020 3:19:58 PMPPASS
new standing seam roofing installed//no access to roof//appears to be complete--trim installed//can see at soffit areas that some decking was replaced//limited access to view roof//
MIS20-00197 BLD-Conference6/15/20206/16/20206/16/2020 2:29:03 PMADONE
CN issued for re-roof//Brian mechanical inspecor witnessed roof being installed// follow up in 10 days//
BLD20-01637 BLD-Energy code compliance6/16/20206/16/20206/16/2020 1:28:14 PMPPASS
Screened- Derek Phone #: ###-####//ok when insulation added to rim board area and at the plumbing chase on exterior wall--will take photos of this completed//close cell foam with value of roughly R21 installed//
BLD20-00225 BLD-Foundation6/15/20206/16/20206/16/2020 1:18:07 PMPPART
Screened-foundation wall Phone #: ###-####//ok//still need to remove rebar from plans//setbacks still appear to be ok//WIP//
BLD19-00535 BLD-Framing/Rough-in6/15/20206/16/20206/16/2020 12:18:25 PMAPART
Inspection on 3rd and 4th floor for approval to insulate Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to insulate//need fire approval//add firecaulk as discussed//fix studs//shear ok//
BLD20-01921 BLD-Final6/15/20206/16/20206/16/2020 11:58:54 AMPCANC
Pls contact Bryce (Foreman) @ ###-#### or George (Electrician) @ ###-#### one hr prior as someone will need to meet inspector on site. Thanks in advance. >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Rob Maes
BLD20-01131 BLD-Framing/Rough-in6/15/20206/16/20206/16/2020 10:59:56 AMADONE
Taylor Barton is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting//onsite contact stated no structural changes were being done//will schedule final//
BLD20-01299 BLD-Conference6/15/20206/16/20206/16/2020 10:37:24 AMADONE
Miles *screened* Phone #: ###-####//discussed inspection timelines//slab cutouts and rebar ok per plans--pend any electrical, mechanical or plumbing rough in inspections//
BLD17-00258 BLD-Final6/15/20206/16/20206/16/2020 10:25:55 AMANR
Shawn Phone #: ###-####//need to have plumbing permit and final//original permit is expired//let contact know to re-schedule//
BLD19-04013 BLD-Energy code compliance6/15/20206/16/20206/16/2020 10:19:33 AMAFAIL
screened // Matt Phone #: ###-####//label fire walls in attic--fire caulk penetrations//wall insulation does not meet rescheck//window u-values do not meet rescheck//1 hour rated laydown parapet was not installed for 4' from separation walls at deck//need fire sprinkler tenting inspection//
BLD20-00380 BLD-Energy code compliance6/15/20206/16/20206/16/2020 9:29:29 AMAPASS
screened // Randy Phone #: ###-####//plans show r 49 insulation, let builder know to post on certification for final//
MIS20-00178 BLD-Conference6/2/20206/16/20206/16/2020 8:40:18 AMADONE
follow up on permits
MIS20-00178 DOC - Permit Finaled6/16/20206/16/20206/16/2020 8:40:08 AMPPASS
roof permit was issued and finaled//other permits were for minor hvac changes and a new water heater//