BLD19-01314
| BLD-Foundation | 6/17/2019 | 6/17/2019 | 6/17/2019 4:09:46 PM | P | PART |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron//rebar installed per plans//work in progress//
|
BLD19-01801
| BLD-Footing | 6/14/2019 | 6/17/2019 | 6/17/2019 2:48:57 PM | P | PASS |
|
|
Dane Phone #: ###-####//footings and setbacks ok per plans.//
|
BLD19-01704
| BLD-Footing | 6/14/2019 | 6/17/2019 | 6/17/2019 2:48:27 PM | P | PASS |
|
|
Dane Phone #: ###-####//footings and setbacks ok per plans//
|
BLD19-00282
| BLD-Framing/Rough-in | 6/17/2019 | 6/17/2019 | 6/17/2019 2:02:12 PM | P | CANC |
|
|
John Phone #: ###-####//frame ok per plans.//call for energy inspection.//
|
MIS19-00169
| BLD-Conference | 6/17/2019 | 6/17/2019 | 6/17/2019 12:53:34 PM | P | DONE |
|
|
working without permit//windows changed out//windows boarded up//left stop work order and asked to contact PDS//
|
BLD19-00376
| BLD-Energy code compliance | 6/14/2019 | 6/17/2019 | 6/17/2019 11:12:42 AM | A | PASS |
|
|
Josh Phone #: ###-####//ok to cover framing//
|
MIS18-00254
| MIS-Aging Inspection | 6/17/2019 | 6/17/2019 | 6/17/2019 11:03:24 AM | | PEND |
|
|
car lot still in operation.
|
MIS19-00130
| BLD-Conference | 6/3/2019 | 6/17/2019 | 6/17/2019 10:35:38 AM | A | DONE |
|
|
Check on progress...//does not appear to be work done since last inspection.// will schedule follow up.// stop work order still posted//
|
BLD19-00670
| BLD-Conference | 6/14/2019 | 6/17/2019 | 6/17/2019 10:13:53 AM | A | CANC |
|
|
|
BLD19-00290
| BLD-Framing/Rough-in | 6/14/2019 | 6/17/2019 | 6/17/2019 10:12:41 AM | A | NR |
|
|
brian Phone #: ###-####//complete air seal of floor/ceiling/plate penetrations. cover seal holes in ceiling.//
|
BLD19-01015
| BLD-Final | 6/14/2019 | 6/17/2019 | 6/17/2019 9:35:05 AM | A | PASS |
|
|
Please call Bradden (###-####) 30 minutes prior to arrival Phone #: ###-#### Inspection requested via web by Bradden Jensen//final complete per plans.//
|
MIS18-00245
| MIS-Aging Inspection | 6/17/2019 | 6/17/2019 | 6/17/2019 8:03:27 AM | | DONE |
|
|
Plumb/Mechanical working on Permit.//
|
MIS18-00242
| MIS-Aging Inspection | 6/17/2019 | 6/17/2019 | 6/17/2019 8:00:58 AM | | DONE |
|
|
BLD-Final 12/6/2018 12/6/2018 12/6/2018 P PASS
Name: Jim Sly //BP was finaled. //
|
MIS18-00238
| MIS-Aging Inspection | 6/17/2019 | 6/17/2019 | 6/17/2019 7:56:53 AM | | DONE |
|
|
$9K demo bond required.
|