BLD20-01921
| BLD-Final | 6/16/2020 | 6/17/2020 | 6/17/2020 4:59:52 PM | P | NR |
|
|
Please contact Bryce (Foreman) @ ###-#### or George (Electrician) @ ###-#### one hr prior if you have any questions. Thanks in advance, Rob Inspection requested via web by Rob Maes//Electrical did not pass// rescheduled for tomorrow//
|
BLD19-04013
| BLD-Energy code compliance | 6/17/2020 | 6/17/2020 | 6/17/2020 4:58:46 PM | P | PART |
|
|
Matt *screened* Phone #: ###-####//107, 108,207,208,307,308// energy requirements updated by designer via res check//attic insulation in these units will Be r50//fire caulk complete//
|
BLD20-00230
| BLD-Framing/Rough-in | 6/17/2020 | 6/17/2020 | 6/17/2020 2:25:27 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//need mechanical, did walk through for corrections//will need re-insepction//
|
BLD20-00337
| BLD-Footing | 6/17/2020 | 6/17/2020 | 6/17/2020 11:31:46 AM | P | PART |
|
|
Chase Phone #: ###-####//add top mat bar in F7A footings//areas ok signed off on plans//interior footing column pads//pend all specials//
|
BLD19-00441
| BLD-Final | 6/16/2020 | 6/17/2020 | 6/17/2020 11:02:39 AM | P | CANC |
|
|
Steve *screened* Phone #: ###-####//talked with Jay, will re-schedule, needs mechanical requirement removed from inspection requirements//will provide photos of the rough framing etc, as no rough in framing inspection was completed//
|
BLD18-03811
| BLD-Framing/Rough-in | 6/17/2020 | 6/17/2020 | 6/17/2020 10:57:25 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Andy Thompson Inspection cancelled from web by: Andy Thompson
|
BLD19-03254
| BLD-Energy code compliance | 6/17/2020 | 6/17/2020 | 6/17/2020 10:51:25 AM | A | PASS |
|
|
Inspection requested via web by Carl Funk//ok per plans, add VB over window headers//framing ok per plans, changes in engineering and verbal walk through with engineer based on the first 8 units//
|
BLD20-01914
| BLD-Energy code compliance | 6/17/2020 | 6/17/2020 | 6/17/2020 10:51:10 AM | A | PASS |
|
|
Inspection requested via web by Carl Funk//ok per plans, add VB over window headers//framing ok per plans, changes in engineering and verbal walk through with engineer based on the first 8 units//
|
BLD19-03257
| BLD-Energy code compliance | 6/17/2020 | 6/17/2020 | 6/17/2020 10:50:07 AM | A | PASS |
|
|
Inspection requested via web by Carl Funk//add VB over window headers//add stud where cut for bearing//add studd to header over stairs-joey will send photos//other framing ok per plans or in compliance with engineers changes and verbal walk through based on the first 8 units inspected//
|
BLD19-03256
| BLD-Energy code compliance | 6/17/2020 | 6/17/2020 | 6/17/2020 10:42:10 AM | A | FAIL |
|
|
Inspection requested via web by Carl Funk//need to remove tub/shower on 3rd floor to insulate and install vapor barrier//
|
BLD19-03209
| BLD-Framing/Rough-in | 6/16/2020 | 6/17/2020 | 6/17/2020 10:06:45 AM | A | PART |
|
|
Tom *screened* Phone #: ###-####//Phase 4, two offices, ok per plans//
|
BLD20-01377
| BLD-Foundation | 6/16/2020 | 6/17/2020 | 6/17/2020 9:54:19 AM | A | PART |
|
|
Screened- sHAWN-please go after 9am Phone #: ###-####//housekeeping pad, rebar per plan, excavated area has water due to rain, contractor will remove cage, get water out and re compact subgrade prior to installing concrete//WIP//
|
BLD20-00225
| BLD-Foundation | 6/16/2020 | 6/17/2020 | 6/17/2020 12:00:00 AM | P | CANC |
|
|
Dane *screened* Phone #: ###-####
|