Inspections for the day of: Wednesday, June 17, 2020.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-01921 BLD-Final6/16/20206/17/20206/17/2020 4:59:52 PMPNR
Please contact Bryce (Foreman) @ ###-#### or George (Electrician) @ ###-#### one hr prior if you have any questions. Thanks in advance, Rob Inspection requested via web by Rob Maes//Electrical did not pass// rescheduled for tomorrow//
BLD19-04013 BLD-Energy code compliance6/17/20206/17/20206/17/2020 4:58:46 PMPPART
Matt *screened* Phone #: ###-####//107, 108,207,208,307,308// energy requirements updated by designer via res check//attic insulation in these units will Be r50//fire caulk complete//
BLD20-00230 BLD-Framing/Rough-in6/17/20206/17/20206/17/2020 2:25:27 PMPNR
Phone #: ###-#### Inspection requested via web by Andy Thompson//need mechanical, did walk through for corrections//will need re-insepction//
BLD20-00337 BLD-Footing6/17/20206/17/20206/17/2020 11:31:46 AMPPART
Chase Phone #: ###-####//add top mat bar in F7A footings//areas ok signed off on plans//interior footing column pads//pend all specials//
BLD19-00441 BLD-Final6/16/20206/17/20206/17/2020 11:02:39 AMPCANC
Steve *screened* Phone #: ###-####//talked with Jay, will re-schedule, needs mechanical requirement removed from inspection requirements//will provide photos of the rough framing etc, as no rough in framing inspection was completed//
BLD18-03811 BLD-Framing/Rough-in6/17/20206/17/20206/17/2020 10:57:25 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Andy Thompson Inspection cancelled from web by: Andy Thompson
BLD19-03254 BLD-Energy code compliance6/17/20206/17/20206/17/2020 10:51:25 AMAPASS
Inspection requested via web by Carl Funk//ok per plans, add VB over window headers//framing ok per plans, changes in engineering and verbal walk through with engineer based on the first 8 units//
BLD20-01914 BLD-Energy code compliance6/17/20206/17/20206/17/2020 10:51:10 AMAPASS
Inspection requested via web by Carl Funk//ok per plans, add VB over window headers//framing ok per plans, changes in engineering and verbal walk through with engineer based on the first 8 units//
BLD19-03257 BLD-Energy code compliance6/17/20206/17/20206/17/2020 10:50:07 AMAPASS
Inspection requested via web by Carl Funk//add VB over window headers//add stud where cut for bearing//add studd to header over stairs-joey will send photos//other framing ok per plans or in compliance with engineers changes and verbal walk through based on the first 8 units inspected//
BLD19-03256 BLD-Energy code compliance6/17/20206/17/20206/17/2020 10:42:10 AMAFAIL
Inspection requested via web by Carl Funk//need to remove tub/shower on 3rd floor to insulate and install vapor barrier//
BLD19-03209 BLD-Framing/Rough-in6/16/20206/17/20206/17/2020 10:06:45 AMAPART
Tom *screened* Phone #: ###-####//Phase 4, two offices, ok per plans//
BLD20-01377 BLD-Foundation6/16/20206/17/20206/17/2020 9:54:19 AMAPART
Screened- sHAWN-please go after 9am Phone #: ###-####//housekeeping pad, rebar per plan, excavated area has water due to rain, contractor will remove cage, get water out and re compact subgrade prior to installing concrete//WIP//
BLD20-00225 BLD-Foundation6/16/20206/17/20206/17/2020 12:00:00 AMPCANC
Dane *screened* Phone #: ###-####