Inspections for the day of: Friday, June 19, 2020.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-02684 BLD-Aging Inspection6/19/20206/19/20206/23/2020 7:18:56 AM CANC
BLD19-02037 BLD-Aging Inspection6/19/20206/19/20206/23/2020 7:18:31 AM CANC
BLD18-01547 BLD-Final6/19/20206/19/20206/19/2020 4:15:32 PMPNR
For building access, please call Jon Jackson @ ###-#### thirty minutes prior to arrival. Thanks! Phone #: ###-#### Inspection requested via web by Gary Beck//need zoning approval prior to final//
BLD17-04648 BLD-Final6/19/20206/19/20206/19/2020 4:15:07 PMPNR
For building access, please call Jon Jackson @ ###-#### thirty minutes prior to arrival. Thanks! Phone #: ###-#### Inspection requested via web by Gary Beck//plans show no changes to restrooms//restrooms appear to have been updated//need to provide confiramtion of bathrroms, if remodeled need to provide plan mod//
BLD20-01921 BLD-Final6/19/20206/19/20206/19/2020 3:36:31 PMAFAIL
need to provide plan for fire setbacks on solar// plan needs to be approved by plan review//
BLD19-00535 BLD-Energy code compliance6/19/20206/19/20206/19/2020 3:33:16 PMPPART
3rd and 4th floor for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok after plumbing is fire caulked as discussed//
BLD20-00230 BLD-Energy code compliance6/17/20206/19/20206/19/2020 2:50:46 PMPPART
Phone #: ###-#### Inspection requested via web by Andy Thompson//u-values and R values do not meet minimum code//provide res-check to meet code minimums as discussed on frame walk through//repair joist per engineering//add VB to garage separation wall//other framing corrections completed//if walls are covered, at own risk and energy code requirements will need to be met//
BLD19-04651 BLD-Framing/Rough-in6/19/20206/19/20206/19/2020 1:46:29 PMPFAIL
Amy Phone #: ###-####//engineering provided for roof accent on front of home//framing does not meet the requirements of the engineering for size, material, and bearing//
BLD19-04576 BLD-Final6/19/20206/19/20206/19/2020 12:35:50 PMPCANC
screened - prints on water heater// Willy Phone #: ###-####//cancel until hold is released for sprinkler permit//
BLD20-01136 BLD-Framing/Rough-in6/19/20206/19/20206/19/2020 12:23:43 PMPPART
screened // Vince Phone #: ###-####//based on new information provided,,still need a few things corrected, trus bracing, bearing etc//CN posted for details//ok to insulate//
BLD17-00258 BLD-Final6/18/20206/19/20206/19/2020 11:46:34 AMANR
screened // Shawn Phone #: ###-####//need smoke detector dust covers removed//adjust springs hinges on garage man door//fire caulk penetrations at garage separation wall//waiting for response from zoning//
BLD20-01563 BLD-Footing6/19/20206/19/20206/19/2020 10:44:22 AMPCANC
Screened- Brian Phone #: ###-####
BLD20-02040 BLD-Final6/18/20206/19/20206/19/2020 10:43:41 AMAFAIL
Final roof inspection needed Phone #: ###-#### Inspection requested via web by Kenneth Clark//need to add kickout flashing at wall terminations//
BLD20-00680 BLD-Wall Bracing6/16/20206/19/20206/19/2020 9:45:00 AMAFAIL
Phone #: ###-#### Inspection requested via web by Kelly Stover//sheathing needs installed on all corners 2nd story//finish sheathing on first story//no one onsite//
BLD20-01240 BLD-Final6/18/20206/19/20206/19/2020 9:33:42 AMAFAIL
Final roof inspection needed Phone #: ###-#### Inspection requested via web by Kenneth Clark//flashing needs nailed down at valley above garage//fix curled/raised shingles near ridge over front door area//
BLD19-03256 BLD-Energy code compliance6/19/20206/19/20206/19/2020 9:14:24 AMAPASS
Inspection requested via web by Carl Funk//area behind tup insulated and VB installed//
MIS19-00178 DOC - Permit Finaled6/19/20206/19/20206/19/2020 7:23:04 AMAPASS
permit was issued and finaled