Inspections for the day of: Thursday, June 4, 2020.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-02583 BLD-Aging Inspection6/4/20206/4/20206/5/2020 7:14:27 AM PEND
needs to turn in signature card
BLD19-04526 BLD-Blower Door Test Results6/4/20206/4/20206/4/2020 3:51:22 PMPDONE
4.56 ACH 50
BLD19-04526 BLD-Final6/4/20206/4/20206/4/2020 3:51:09 PMPPASS
willie Phone #: ###-####//corrections made//
BLD19-04526 DOC - Permit Finaled6/4/20206/4/20206/4/2020 3:50:54 PMPPASS
BLD20-01722 BLD-Other6/4/20206/4/20206/4/2020 3:38:03 PMPDONE
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-01722 DOC - Permit Finaled6/4/20206/4/20206/4/2020 3:37:53 PMPPASS
roof appears to be installed within code requirements//no access to back//
BLD20-01101 BLD-Final6/4/20206/4/20206/4/2020 3:15:45 PMPPASS
screened // Steve Phone #: ###-####//letter from engineer specifying anchor size, and letter from engineer stating that no bolting is required as the equipment is considered as furniture--based on these letters the owner used two bolts to prevent sliding, the engineer did not require this based on the letter from June 1 2020//railing was added with tight chain and permant railing from manufacturer was ordered and will be installed per the owner//
BLD20-00230 BLD-Wall cover6/4/20206/4/20206/4/2020 2:24:01 PMPPART
Phone #: ###-#### Inspection requested via web by Andy Thompson//wall bracing inspection//nails added in areas while onsite//add blocking on shear panels between trusses and nail//add hold down on corner-see plans//add straps on inside of PFH//exterior ok to wrap//
BLD19-00820 BLD-Conference6/4/20206/4/20206/4/2020 2:10:13 PMPDONE
Mark *screened* Phone #: ###-####//need ele final//needto add smoke detectors in bedrooms and smoke/co detectors outside bedrooms and in addition--ust be interconnected//flashing at roof will be replaced when new roof is installed this summer//add landing at exterior doors//add 2min or solid core door self closing at garage/ addition doorway//
BLD20-01230 BLD-Foundation6/4/20206/4/20206/4/2020 12:43:44 PMPPASS
early pm - stem wall - screened // Christian Phone #: 5###-####
BLD19-04773 BLD-Wall Bracing6/4/20206/4/20206/4/2020 11:35:22 AMAPART
//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
BLD19-04772 BLD-Wall Bracing6/4/20206/4/20206/4/2020 11:35:03 AMAPART
//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
BLD19-04770 BLD-Wall Bracing6/4/20206/4/20206/4/2020 11:34:46 AMAPART
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
BLD19-04767 BLD-Wall Bracing6/4/20206/4/20206/4/2020 11:34:21 AMAPART
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
BLD20-01495 DOC - Permit Finaled6/4/20206/4/20206/4/2020 10:57:05 AMPPASS
kickout flashing installed photos provided//roof complete//
BLD20-00399 BLD-Wall Bracing6/4/20206/4/20206/4/2020 10:55:18 AMAPART
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
BLD20-00398 BLD-Wall Bracing6/4/20206/4/20206/4/2020 10:55:01 AMAPART
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
BLD20-00397 BLD-Wall Bracing6/4/20206/4/20206/4/2020 10:54:45 AMAPART
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
BLD20-00357 BLD-Wall Bracing6/4/20206/4/20206/4/2020 10:54:28 AMAPART
1st floor shear inspection Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
BLD19-02700 BLD-Final6/3/20206/4/20206/4/2020 10:46:57 AMAPASS
screened // Brandon Phone #: ###-####//see zoning for easment vacation///
BLD19-02700 DOC - Permit Finaled6/4/20206/4/20206/4/2020 10:46:31 AMPPASS
easment vacated and email recieved from zoning allowing occupancy//
BLD18-01837 BLD-Final6/3/20206/4/20206/4/2020 7:13:32 AMACANC