BLD19-02583
| BLD-Aging Inspection | 6/4/2020 | 6/4/2020 | 6/5/2020 7:14:27 AM | | PEND |
|
|
needs to turn in signature card
|
BLD19-04526
| BLD-Blower Door Test Results | 6/4/2020 | 6/4/2020 | 6/4/2020 3:51:22 PM | P | DONE |
|
|
4.56 ACH 50
|
BLD19-04526
| BLD-Final | 6/4/2020 | 6/4/2020 | 6/4/2020 3:51:09 PM | P | PASS |
|
|
willie Phone #: ###-####//corrections made//
|
BLD19-04526
| DOC - Permit Finaled | 6/4/2020 | 6/4/2020 | 6/4/2020 3:50:54 PM | P | PASS |
|
|
|
BLD20-01722
| BLD-Other | 6/4/2020 | 6/4/2020 | 6/4/2020 3:38:03 PM | P | DONE |
|
|
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-01722
| DOC - Permit Finaled | 6/4/2020 | 6/4/2020 | 6/4/2020 3:37:53 PM | P | PASS |
|
|
roof appears to be installed within code requirements//no access to back//
|
BLD20-01101
| BLD-Final | 6/4/2020 | 6/4/2020 | 6/4/2020 3:15:45 PM | P | PASS |
|
|
screened // Steve Phone #: ###-####//letter from engineer specifying anchor size, and letter from engineer stating that no bolting is required as the equipment is considered as furniture--based on these letters the owner used two bolts to prevent sliding, the engineer did not require this based on the letter from June 1 2020//railing was added with tight chain and permant railing from manufacturer was ordered and will be installed per the owner//
|
BLD20-00230
| BLD-Wall cover | 6/4/2020 | 6/4/2020 | 6/4/2020 2:24:01 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//wall bracing inspection//nails added in areas while onsite//add blocking on shear panels between trusses and nail//add hold down on corner-see plans//add straps on inside of PFH//exterior ok to wrap//
|
BLD19-00820
| BLD-Conference | 6/4/2020 | 6/4/2020 | 6/4/2020 2:10:13 PM | P | DONE |
|
|
Mark *screened* Phone #: ###-####//need ele final//needto add smoke detectors in bedrooms and smoke/co detectors outside bedrooms and in addition--ust be interconnected//flashing at roof will be replaced when new roof is installed this summer//add landing at exterior doors//add 2min or solid core door self closing at garage/ addition doorway//
|
BLD20-01230
| BLD-Foundation | 6/4/2020 | 6/4/2020 | 6/4/2020 12:43:44 PM | P | PASS |
|
|
early pm - stem wall - screened // Christian Phone #: 5###-####
|
BLD19-04773
| BLD-Wall Bracing | 6/4/2020 | 6/4/2020 | 6/4/2020 11:35:22 AM | A | PART |
|
|
//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
|
BLD19-04772
| BLD-Wall Bracing | 6/4/2020 | 6/4/2020 | 6/4/2020 11:35:03 AM | A | PART |
|
|
//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
|
BLD19-04770
| BLD-Wall Bracing | 6/4/2020 | 6/4/2020 | 6/4/2020 11:34:46 AM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
|
BLD19-04767
| BLD-Wall Bracing | 6/4/2020 | 6/4/2020 | 6/4/2020 11:34:21 AM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
|
BLD20-01495
| DOC - Permit Finaled | 6/4/2020 | 6/4/2020 | 6/4/2020 10:57:05 AM | P | PASS |
|
|
kickout flashing installed photos provided//roof complete//
|
BLD20-00399
| BLD-Wall Bracing | 6/4/2020 | 6/4/2020 | 6/4/2020 10:55:18 AM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
|
BLD20-00398
| BLD-Wall Bracing | 6/4/2020 | 6/4/2020 | 6/4/2020 10:55:01 AM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
|
BLD20-00397
| BLD-Wall Bracing | 6/4/2020 | 6/4/2020 | 6/4/2020 10:54:45 AM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
|
BLD20-00357
| BLD-Wall Bracing | 6/4/2020 | 6/4/2020 | 6/4/2020 10:54:28 AM | A | PART |
|
|
1st floor shear inspection Phone #: ###-#### Inspection requested via web by Shane Shade//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
|
BLD19-02700
| BLD-Final | 6/3/2020 | 6/4/2020 | 6/4/2020 10:46:57 AM | A | PASS |
|
|
screened // Brandon Phone #: ###-####//see zoning for easment vacation///
|
BLD19-02700
| DOC - Permit Finaled | 6/4/2020 | 6/4/2020 | 6/4/2020 10:46:31 AM | P | PASS |
|
|
easment vacated and email recieved from zoning allowing occupancy//
|
BLD18-01837
| BLD-Final | 6/3/2020 | 6/4/2020 | 6/4/2020 7:13:32 AM | A | CANC |
|
|
|