BLD19-00266
| BLD-Aging Inspection | 6/8/2020 | 6/8/2020 | 6/9/2020 7:25:41 AM | | PEND |
|
|
|
BLD19-00535
| BLD-Framing/Rough-in | 6/8/2020 | 6/8/2020 | 6/8/2020 4:49:27 PM | P | NR |
|
|
Corridor framing inspection preliminary of framing Phone #: ###-#### Inspection requested via web by Travis Blackburn//add nails to hangers//addhorizontal hold down where missing//fire caulk penetrations//verify trades inspections approved//
|
BLD19-00527
| BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 3:21:03 PM | P | PASS |
|
|
INspection for additional floor to floor straps and hold downs add afterwards Phone #: ###-#### Inspection requested via web by Travis Blackburn//added hold downs and floor to floor strapping--ok//
|
BLD19-00526
| BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 3:20:33 PM | P | PASS |
|
|
Additional hardware and hold downs added after the fact Phone #: ###-#### Inspection requested via web by Travis Blackburn//added hold downs and floor to floor strapping--ok//
|
BLD20-01417
| BLD-Framing/Rough-in | 6/7/2020 | 6/8/2020 | 6/8/2020 2:56:49 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Tyler Olson//ok to insulate//do not cover FP until Mechanical has passed//
|
BLD20-01487
| BLD-Framing/Rough-in | 6/8/2020 | 6/8/2020 | 6/8/2020 2:01:53 PM | P | NR |
|
|
Aaron *screened* Phone #: ###-####//still need framing to match engineering or engineering to reflect as built porch and cover//need to add supprt to overbuild//footing size verified where new//existing footings need to be approved for use by engineer//
|
BLD19-04773
| BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 12:58:42 PM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//1st floor shear nailing re-inspection//nails were added in areas in accordance with shear schedule//
|
BLD19-04772
| BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 12:58:18 PM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//1st floor shear nailing re-inspection//nails were added in areas in accordance with shear schedule//
|
BLD19-04770
| BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 12:58:00 PM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//1st floor shear nailing re-inspection//nails were added in areas in accordance with shear schedule//
|
BLD19-04767
| BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 12:57:36 PM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//1st floor shear nailing re-inspection//nails were added in areas in accordance with shear schedule//
|
MIS18-00257
| DOC - Permit Finaled | 6/8/2020 | 6/8/2020 | 6/8/2020 11:53:28 AM | P | PASS |
|
|
no activity on MIS permit//
|
BLD20-00399
| BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 11:50:04 AM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//1st floor shear nailing re-inspection//nails were added in areas in accordance with shear schedule//
|
BLD20-00398
| BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 11:49:47 AM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//1st floor shear nailing re-inspection//nails were added in areas in accordance with shear schedule//
|
BLD20-00397
| BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 11:49:32 AM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//1st floor shear nailing re-inspection//nails were added in areas in accordance with shear schedule//
|
BLD20-00357
| BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 11:49:14 AM | A | PART |
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//1st floor shear nailing re-inspection//nails were added in areas in accordance with shear schedule//
|
BLD20-01341
| BLD-Foundation | 6/7/2020 | 6/8/2020 | 6/8/2020 11:00:35 AM | A | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo //measured setbacks from pins//need to adjust foundation to exact 2' setback on all sides//discussed with contact onsite and working on this when I left//hold downs and some forms still WIP//
|
BLD20-01340
| BLD-Foundation | 6/7/2020 | 6/8/2020 | 6/8/2020 11:00:19 AM | A | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo //measured setbacks from pins//need to adjust foundation to exact 2' setback on all sides//discussed with contact onsite and working on this when I left//hold downs and some forms still WIP//
|
BLD20-01339
| BLD-Foundation | 6/7/2020 | 6/8/2020 | 6/8/2020 11:00:02 AM | A | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo //measured setbacks from pins//need to adjust foundation to exact 2' setback on all sides//discussed with contact onsite and working on this when I left//hold downs and some forms still WIP//
|
BLD20-01279
| BLD-Foundation | 6/7/2020 | 6/8/2020 | 6/8/2020 10:59:44 AM | A | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo //measured setbacks from pins//need to adjust foundation to exact 2' setback on all sides//discussed with contact onsite and working on this when I left//hold downs and some forms still WIP//
|
BLD20-01361
| BLD-Foundation | 6/7/2020 | 6/8/2020 | 6/8/2020 10:59:27 AM | A | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo //measured setbacks from pins//need to adjust foundation to exact 2' setback on all sides//discussed with contact onsite and working on this when I left//hold downs and some forms still WIP//
|
BLD20-01360
| BLD-Foundation | 6/7/2020 | 6/8/2020 | 6/8/2020 10:59:08 AM | A | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo //measured setbacks from pins//need to adjust foundation to exact 2' setback on all sides//discussed with contact onsite and working on this when I left//hold downs and some forms still WIP//
|
BLD20-01359
| BLD-Foundation | 6/7/2020 | 6/8/2020 | 6/8/2020 10:58:51 AM | A | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo //measured setbacks from pins//need to adjust foundation to exact 2' setback on all sides//discussed with contact onsite and working on this when I left//hold downs and some forms still WIP//
|
BLD20-01358
| BLD-Foundation | 6/7/2020 | 6/8/2020 | 6/8/2020 10:58:22 AM | A | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo //measured setbacks from pins//need to adjust foundation to exact 2' setback on all sides//discussed with contact onsite and working on this when I left//hold downs and some forms still WIP//
|
BLD20-01228
| BLD-Final | 6/5/2020 | 6/8/2020 | 6/8/2020 9:39:09 AM | A | NR |
|
|
Whitney *screened* Phone #: ###-####//need to safety glaze window adjacent to new door//finish trim out of door and seal//
|
BLD20-01715
| BLD-Final | 6/5/2020 | 6/8/2020 | 6/8/2020 9:16:21 AM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by David Dexter//gate appears to be locked//knocked on front door no answer//will need to re-schedule when access is available//
|
BLD20-01629
| BLD-Final | 6/5/2020 | 6/8/2020 | 6/8/2020 7:07:22 AM | A | DONE |
|
|
Inspection on a completed asphalt re-roof project. Request was initially submitted on 6/2 but it''s been rescheduled every day even though our other inspections have happened so I wanted to make sure it''s not getting missed. Phone #: ###-#### Inspection requested via web by Michael La Pointe//this permit is already finaled//
|