Inspections for the day of: Wednesday, July 1, 2020.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-01265 BLD-Aging Inspection7/1/20207/1/20207/7/2020 7:31:51 AM PEND
BLD19-00479 BLD-Aging Inspection7/1/20207/1/20207/7/2020 7:30:47 AM PEND
no inspections requested
BLD19-02398 BLD-Final7/1/20207/1/20207/1/2020 4:28:13 PMPPASS
Call Wes Phone #: ###-#### Inspection requested via web by Wes palm//CDHD signature was confirmed via photo from Wes//final is now complete for occupancy//
BLD19-04013 BLD-Wall cover7/1/20207/1/20207/1/2020 3:22:06 PMPPART
areas in fire wall to roof deck over center stairways were filled with gyp board and penetrations fire caulked//this was verified by photos sent by contractor//
BLD20-00381 BLD-Framing/Rough-in7/1/20207/1/20207/1/2020 2:58:01 PMPPASS
Randy *screened* Phone #: ###-####//ok to insulate//add truss bracing// add for three ply headers in back//move water box out of rated wall in 7790//
MIS20-00157 BLD-Conference7/1/20207/1/20207/1/2020 2:01:58 PMPCANC
follow up on 5 day notice of violation
BLD20-01815 BLD-Final6/30/20207/1/20207/1/2020 1:10:13 PMADONE
Inspection on a completed asphalt re-roof project. We also replaced some fascia. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-01815 DOC - Permit Finaled7/1/20207/1/20207/1/2020 1:10:04 PMPPASS
roof appears to be installed within code requirements//kick out flashing installed on front where needed//no access to back//
BLD20-00097 BLD-Blower Door Test Results7/1/20207/1/20207/1/2020 12:22:42 PMPDONE
4.0 ACH 50
BLD20-00097 BLD-Final6/30/20207/1/20207/1/2020 12:22:23 PMAPASS
Garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover//plan mod for R38 in attic//final complete//
BLD20-00097 DOC - Permit Finaled7/1/20207/1/20207/1/2020 12:21:55 PMPPASS
BLD20-01290 BLD-Energy code compliance6/29/20207/1/20207/1/2020 11:51:38 AMAPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD20-01292 BLD-Energy code compliance6/29/20207/1/20207/1/2020 11:51:22 AMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle//need to add truss bracing to roof trusses per engineering//no cover until framing has passed//
BLD20-01292 BLD-Framing/Rough-in6/29/20207/1/20207/1/2020 11:50:51 AMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle//need to add truss bracing to roof trusses per engineering//
BLD20-01294 BLD-Framing/Rough-in6/30/20207/1/20207/1/2020 11:49:19 AMAPART
screened // Shawn Phone #: ###-####//framing in areas that do not have plumbing ok, shawn will send photos of headers and jambs when installed//electrical rough approved//brace wall at office with 45 degree bracing//
BLD19-00532 BLD-Framing/Rough-in6/30/20207/1/20207/1/2020 11:13:28 AMAPART
Pre rock areas for tubs and plumbing walls Phone #: ###-#### Inspection requested via web by Travis Blackburn//add bolts 1st floor as discussed//add studs where needed//pending electrical in areas to be covered//
BLD19-00147 BLD-Framing/Rough-in6/30/20207/1/20207/1/2020 10:33:18 AMAPASS
screened // Lloyd Phone #: ###-####//Video inspection completed due to occupied dwelling and pandemic guidelines//ok pending electrical pass rough in//discussed egress requirements for new bedroom, and smoke/CO detector requirments//
MIS20-00157 BLD-Conference6/24/20207/1/20207/1/2020 10:17:13 AMACANC
follow up on 5 day notice of violation//moved to PM//
BLD20-00225 BLD-Wall Bracing6/30/20207/1/20207/1/2020 10:02:16 AMAPASS
Vinny *screened* Phone #: ###-####//ok when HD galvanized nails added to Pt plate//
BLD19-01131 BLD-Final6/30/20207/1/20207/1/2020 9:36:23 AMAFAIL
Mike Phone #: ###-####//CN notice issued for barrier gate, and window alarm requirements listed on plans and description//