Inspections for the day of: Thursday, July 11, 2019.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00344 MIS-Aging Inspection7/11/20197/11/20197/15/2019 11:30:52 AM PASS
BLD19-00889 BLD-Foundation7/11/20197/11/20197/11/2019 4:03:09 PMPCANC
Andras Phone #: ###-####//requested underfloor//no inspection required//
BLD19-01898 BLD-Final7/10/20197/11/20197/11/2019 3:50:12 PMPPASS
Matt Phone #: ###-####//TI complete per plans//all other required signatures signed off//
BLD19-01694 BLD-Footing7/11/20197/11/20197/11/2019 3:17:13 PMPFAIL
Phone #: 2086971241 >> Inspection requested via mobile web by Heron//adjust footings to be square on lot per plans//must meet side setback requirements//
BLD19-01271 BLD-Framing/Rough-in7/11/20197/11/20197/11/2019 2:46:55 PMPFAIL
Mark Phone #: ###-####//correction notice posted on front window//make corrections and call for re-inspection///
BLD19-02366 BLD-Final7/10/20197/11/20197/11/2019 2:14:46 PMPFAIL
On-site contact: Mierins ###-#### Inspection requested via web by BRS Permitting//electrical final failed//obtain final electrical and call for Re-inspection//
BLD19-01806 BLD-Footing7/10/20197/11/20197/11/2019 2:05:46 PMPPASS
Dane Phone #: ###-####//setbacks per plans//
BLD19-01804 BLD-Foundation7/10/20197/11/20197/11/2019 2:05:24 PMPPASS
Dane Phone #: ###-####//ok per plans//
BLD19-01724 BLD-Footing7/10/20197/11/20197/11/2019 2:05:03 PMPPASS
Dane Phone #: ###-####//setbacks ok per plans//
BLD18-03045 BLD-Framing/Rough-in7/11/20197/11/20197/11/2019 1:19:17 PMPPASS
Michael Phone #: ###-####//framing ok per plans//rough ins inspected//ok to insulate //
BLD18-04321 BLD-Other7/11/20197/11/20197/11/2019 12:47:01 PMPNR
ok to cover // Mike Phone #: ###-####//get letter from design engineer on framing and shear changes//also include bearing changes for beam in kitchen.//electrical/mechanical will need to be rough in and inspected prior to framing.///
BLD19-00839 BLD-Framing/Rough-in7/10/20197/11/20197/11/2019 11:49:04 AMAPASS
Please call prior to inspection Phone #: ###-#### Inspection requested via web by Aron Mock//ok to insulate//add blocking at stairs and landing//
BLD19-00839 BLD-Wall Bracing7/10/20197/11/20197/11/2019 11:48:24 AMAPASS
Phone #: ###-#### Inspection requested via web by Aron Mock//bracing ok//conversion chart for staples was provided//
BLD19-01915 BLD-Foundation7/11/20197/11/20197/11/2019 11:46:28 AMPPART
Stanley Phone #: ###-####//wall ok//need to install hold downs//
BLD18-04345 BLD-Ceiling Grid Inspection7/9/20197/11/20197/11/2019 11:20:18 AMANR
Approve to install border ceiling tile throughout. Phone #: ###-#### Inspection requested via web by Brandon Grote//need fire sprinker and alarm inspections prior to cover///
BLD19-00784 BLD-Final7/10/20197/11/20197/11/2019 11:10:00 AMAPASS
Ted Phone #: ###-####//final complete//art studio-office space addition//all trades final complete//stairs and handrail ok//
BLD19-02245 BLD-Framing/Rough-in7/10/20197/11/20197/11/2019 11:10:00 AMAFAIL
Dustin Phone #: ###-####//obtain mechanical inspection and permit//add cripple studs at bay window framing//frame opening in garage separation wall//advised on safety glazing in shower window//
BLD19-00784 DOC - Permit Finaled7/11/20197/11/20197/11/2019 11:09:11 AMPPASS
BLD19-01221 BLD-Foundation7/11/20197/11/20197/11/2019 9:46:49 AMAPASS
corrections made//ok to pour wall//
BLD19-01221 BLD-Wall cover7/10/20197/11/20197/11/2019 9:45:27 AMACANC
Terry Phone #: ###-####