MIS18-00344
| MIS-Aging Inspection | 7/11/2019 | 7/11/2019 | 7/15/2019 11:30:52 AM | | PASS |
|
|
|
BLD19-00889
| BLD-Foundation | 7/11/2019 | 7/11/2019 | 7/11/2019 4:03:09 PM | P | CANC |
|
|
Andras Phone #: ###-####//requested underfloor//no inspection required//
|
BLD19-01898
| BLD-Final | 7/10/2019 | 7/11/2019 | 7/11/2019 3:50:12 PM | P | PASS |
|
|
Matt Phone #: ###-####//TI complete per plans//all other required signatures signed off//
|
BLD19-01694
| BLD-Footing | 7/11/2019 | 7/11/2019 | 7/11/2019 3:17:13 PM | P | FAIL |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron//adjust footings to be square on lot per plans//must meet side setback requirements//
|
BLD19-01271
| BLD-Framing/Rough-in | 7/11/2019 | 7/11/2019 | 7/11/2019 2:46:55 PM | P | FAIL |
|
|
Mark Phone #: ###-####//correction notice posted on front window//make corrections and call for re-inspection///
|
BLD19-02366
| BLD-Final | 7/10/2019 | 7/11/2019 | 7/11/2019 2:14:46 PM | P | FAIL |
|
|
On-site contact: Mierins ###-#### Inspection requested via web by BRS Permitting//electrical final failed//obtain final electrical and call for Re-inspection//
|
BLD19-01806
| BLD-Footing | 7/10/2019 | 7/11/2019 | 7/11/2019 2:05:46 PM | P | PASS |
|
|
Dane Phone #: ###-####//setbacks per plans//
|
BLD19-01804
| BLD-Foundation | 7/10/2019 | 7/11/2019 | 7/11/2019 2:05:24 PM | P | PASS |
|
|
Dane Phone #: ###-####//ok per plans//
|
BLD19-01724
| BLD-Footing | 7/10/2019 | 7/11/2019 | 7/11/2019 2:05:03 PM | P | PASS |
|
|
Dane Phone #: ###-####//setbacks ok per plans//
|
BLD18-03045
| BLD-Framing/Rough-in | 7/11/2019 | 7/11/2019 | 7/11/2019 1:19:17 PM | P | PASS |
|
|
Michael Phone #: ###-####//framing ok per plans//rough ins inspected//ok to insulate //
|
BLD18-04321
| BLD-Other | 7/11/2019 | 7/11/2019 | 7/11/2019 12:47:01 PM | P | NR |
|
|
ok to cover // Mike Phone #: ###-####//get letter from design engineer on framing and shear changes//also include bearing changes for beam in kitchen.//electrical/mechanical will need to be rough in and inspected prior to framing.///
|
BLD19-00839
| BLD-Framing/Rough-in | 7/10/2019 | 7/11/2019 | 7/11/2019 11:49:04 AM | A | PASS |
|
|
Please call prior to inspection Phone #: ###-#### Inspection requested via web by Aron Mock//ok to insulate//add blocking at stairs and landing//
|
BLD19-00839
| BLD-Wall Bracing | 7/10/2019 | 7/11/2019 | 7/11/2019 11:48:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Aron Mock//bracing ok//conversion chart for staples was provided//
|
BLD19-01915
| BLD-Foundation | 7/11/2019 | 7/11/2019 | 7/11/2019 11:46:28 AM | P | PART |
|
|
Stanley Phone #: ###-####//wall ok//need to install hold downs//
|
BLD18-04345
| BLD-Ceiling Grid Inspection | 7/9/2019 | 7/11/2019 | 7/11/2019 11:20:18 AM | A | NR |
|
|
Approve to install border ceiling tile throughout. Phone #: ###-#### Inspection requested via web by Brandon Grote//need fire sprinker and alarm inspections prior to cover///
|
BLD19-00784
| BLD-Final | 7/10/2019 | 7/11/2019 | 7/11/2019 11:10:00 AM | A | PASS |
|
|
Ted Phone #: ###-####//final complete//art studio-office space addition//all trades final complete//stairs and handrail ok//
|
BLD19-02245
| BLD-Framing/Rough-in | 7/10/2019 | 7/11/2019 | 7/11/2019 11:10:00 AM | A | FAIL |
|
|
Dustin Phone #: ###-####//obtain mechanical inspection and permit//add cripple studs at bay window framing//frame opening in garage separation wall//advised on safety glazing in shower window//
|
BLD19-00784
| DOC - Permit Finaled | 7/11/2019 | 7/11/2019 | 7/11/2019 11:09:11 AM | P | PASS |
|
|
|
BLD19-01221
| BLD-Foundation | 7/11/2019 | 7/11/2019 | 7/11/2019 9:46:49 AM | A | PASS |
|
|
corrections made//ok to pour wall//
|
BLD19-01221
| BLD-Wall cover | 7/10/2019 | 7/11/2019 | 7/11/2019 9:45:27 AM | A | CANC |
|
|
Terry Phone #: ###-####
|