BLD18-00105
| BLD-Final | 8/1/2019 | 8/1/2019 | 8/1/2019 4:10:01 PM | P | NR |
|
|
Please call to schedule Phone #: ###-#### Inspection requested via web by Andy Thompson//need final fire sprinkler inspection, life safety inspection//have plans onsite for final//
|
BLD19-02698
| BLD-Conference | 7/31/2019 | 8/1/2019 | 8/1/2019 3:36:26 PM | A | DONE |
|
|
follow up//owner met with contractor and concerns will be addressed and inspection will be re-scheduled//
|
BLD18-04514
| BLD-Final | 7/31/2019 | 8/1/2019 | 8/1/2019 3:35:38 PM | P | NR |
|
|
Pat Phone #: ###-####//exit signs ok//break room counter height needs to be 34" per plans//bathroom sink clearance needs 2'5" floor to bottom of sink//
|
BLD19-00212
| BLD-Wall Bracing | 8/1/2019 | 8/1/2019 | 8/1/2019 2:42:20 PM | P | PASS |
|
|
Inspection requested via web by James Jackson
|
BLD19-01756
| BLD-Wall Bracing | 8/1/2019 | 8/1/2019 | 8/1/2019 1:15:52 PM | P | PASS |
|
|
ARMANDO Phone #: ###-####//corrections made//
|
BLD19-02533
| BLD-Footing | 8/1/2019 | 8/1/2019 | 8/1/2019 1:04:38 PM | P | DONE |
|
|
Brandon- Concrete at 1:30 footing foundation Phone #: ###-####//no property pins were present//contractor is pouring footings at his own risk--unable to call off concrete//pins need to be set and setbacks verified prior to going vertical//
|
BLD19-02216
| BLD-Final | 7/31/2019 | 8/1/2019 | 8/1/2019 11:20:19 AM | P | CANC |
|
|
Leren Phone #: ###-####//cancel per Leren//need to pass fire final//
|
BLD19-01076
| BLD-Final | 7/31/2019 | 8/1/2019 | 8/1/2019 11:15:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher//sign is complete//
|
BLD19-01076
| DOC - Permit Finaled | 8/1/2019 | 8/1/2019 | 8/1/2019 11:14:52 AM | P | PASS |
|
|
|
BLD18-02369
| BLD-Final | 7/30/2019 | 8/1/2019 | 8/1/2019 11:14:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher//sign is complete//
|
BLD18-02369
| DOC - Permit Finaled | 8/1/2019 | 8/1/2019 | 8/1/2019 11:14:20 AM | P | PASS |
|
|
|
BLD18-04178
| BLD-Blower Door Test Results | 8/1/2019 | 8/1/2019 | 8/1/2019 11:02:55 AM | A | DONE |
|
|
4.29 ACH 50
1263 CFM @ 50 pa
|
BLD18-04178
| BLD-Final | 7/31/2019 | 8/1/2019 | 8/1/2019 11:01:35 AM | A | PASS |
|
|
Larry Phone #: ###-####//corrections made//final complete//
|
BLD18-04178
| DOC - Permit Finaled | 8/1/2019 | 8/1/2019 | 8/1/2019 11:01:11 AM | P | PASS |
|
|
|
BLD18-04174
| BLD-Blower Door Test Results | 8/1/2019 | 8/1/2019 | 8/1/2019 10:56:45 AM | A | DONE |
|
|
4.34 ACH 50 1395 CFM @ 50pa
|
BLD18-04174
| BLD-Final | 7/31/2019 | 8/1/2019 | 8/1/2019 10:55:01 AM | A | PASS |
|
|
Larry Phone #: ###-####//corrections made//final complete//
|
BLD18-04174
| DOC - Permit Finaled | 8/1/2019 | 8/1/2019 | 8/1/2019 10:54:36 AM | P | PASS |
|
|
|
BLD19-01655
| BLD-Wall Bracing | 7/31/2019 | 8/1/2019 | 8/1/2019 10:34:54 AM | A | PASS |
|
|
Alex Phone #: ###-####
|
BLD18-04321
| BLD-Energy code compliance | 7/31/2019 | 8/1/2019 | 8/1/2019 10:34:38 AM | A | PASS |
|
|
Mike Phone #: ###-####
|
BLD18-01968
| BLD-Final | 7/31/2019 | 8/1/2019 | 8/1/2019 9:44:35 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Scott Smith//roof appears to be installed within code requirements//
|
BLD18-01968
| DOC - Permit Finaled | 8/1/2019 | 8/1/2019 | 8/1/2019 9:44:05 AM | P | PASS |
|
|
|
BLD15-01171
| BLD-Energy code compliance | 7/31/2019 | 8/1/2019 | 8/1/2019 9:29:24 AM | A | PASS |
|
|
Dan Phone #: ###-####
|
BLD18-02261
| BLD-Final | 7/31/2019 | 8/1/2019 | 8/1/2019 8:43:51 AM | A | CANC |
|
|
Call ahead // Gavin Phone #: ###-####//Gavin will reschedule when life safety passes//
|
BLD19-02594
| BLD-Footing | 7/31/2019 | 8/1/2019 | 8/1/2019 8:22:29 AM | A | PASS |
|
|
Jose Phone #: ###-####//corrections made//ok per plans//
|
MIS18-00368
| MIS-Aging Inspection | 8/1/2019 | 8/1/2019 | 8/1/2019 7:58:34 AM | | PASS |
|
|
|
BLD17-03168
| BLD-Final | 7/31/2019 | 8/1/2019 | 7/31/2019 1:43:32 PM | A | CANC |
|
|
Chip Moved From Weds--###-####//fist thing if possible//cancel per Chip//
|