Inspections for the day of: Friday, August 7, 2020.
Number of inspections: 16
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00081 MIS-Aging Inspection8/6/20208/6/2020   
BLD17-03275 BLD-Footing8/6/20208/7/20208/7/2020 3:34:22 PMPPART
JR *screened* Phone #: ###-####//WIP//
BLD19-04218 BLD-Conference8/7/20208/7/20208/7/2020 3:19:18 PMPDONE
*Screened* Shawn Phone #: ###-####
BLD19-04742 BLD-Framing/Rough-in8/6/20208/7/20208/7/2020 2:38:19 PMPPASS
David Baldwin on site contact Phone #: ###-#### Inspection requested via web by Ron Ramza//door framing per plans//
BLD20-02602 BLD-Final8/7/20208/7/20208/7/2020 2:09:45 PMPFAIL
Please call Matthew Jones prior to arrival. Phone #: ###-#### Inspection requested via web by Nicholas Buck//need to provide engineered letter for existing roof structure-no notes in description--letter is not with plans//plans do not show setbacks from eaves///CN left with packet//
BLD19-03701 BLD-Final8/6/20208/7/20208/7/2020 1:16:54 PMPFAIL
Call for access ... ok with video/photo // Mark Phone #: ###-####//handrail on exterior stairs does not mee code requirements// see correction notice for code sections of handrails//other corrections have been made//
BLD19-03050 BLD-Framing/Rough-in8/6/20208/7/20208/7/2020 12:56:28 PMPPASS
Dave - */Screened*/ Phone #: ###-####//ok to insulate//
BLD20-01191 BLD-Energy code compliance8/6/20208/7/20208/7/2020 12:00:29 PMAPART
ok with video/photo // Chris Phone #: ###-####//let Lucas know onsite areas that need fixed--he will fix take photos and hang lid to blow in the attic//2nd floor knee wall VB needs to be on warm side of the wall--let Chris know--will need to verify//other walls that were opened/furred out have had the cavity filled//
BLD20-01749 BLD-Wall cover8/6/20208/7/20208/7/2020 10:43:16 AMADONE
screened // Eric Phone #: ###-####//asked for screw inspection on drywall//does not appear to be needed--no shear wall or rated walls specifiying screws//used as conference//
BLD20-01891 BLD-Final8/6/20208/7/20208/7/2020 10:28:48 AMAPASS
Call ahead John - */Screnned*/ Phone #: ###-####//corrections made//accessible route is currently only hard surface underlayment//
BLD20-00337 BLD-Other8/6/20208/7/20208/7/2020 9:54:18 AMAPART
screened - masonry // Chase Phone #: ###-####//masonry for gym walls//pend special inspections//
BLD20-00344 BLD-Ceiling Grid Inspection8/6/20208/7/20208/7/2020 9:19:03 AMAPASS
Miles *screened* Phone #: ###-####//mechanical passed//ok to fill grid in phase 2//
MIS20-00200 BLD-Conference7/17/20208/7/20208/7/2020 8:46:54 AMADONE
plans have been submiited, intake failed due to plumbing plans//
BLD19-04985 BLD-Footing8/6/20208/7/20208/7/2020 7:43:09 AMPCANC
Phone #: 2086971241 >> Inspection requested via mobile web by heron Inspection cancelled via mobile web on Friday, August 07, 2020.
BLD19-00553 BLD-Aging Inspection8/7/20208/7/20208/7/2020 7:36:44 AM PEND
BLD19-02690 BLD-Aging Inspection8/7/20208/7/20208/7/2020 7:36:01 AM PEND