BLD18-03176
| BLD-Aging Inspection | 9/11/2019 | 9/11/2019 | 9/13/2019 8:11:17 AM | | PASS |
|
|
Expires: 03/09/20
|
MIS18-00019
| MIS-Aging Inspection | 9/11/2019 | 9/11/2019 | 9/13/2019 8:10:26 AM | | DONE |
|
|
Permit Number BLD18-00886 was issued and has expired
|
BLD18-03921
| BLD-Aging Inspection | 9/11/2019 | 9/11/2019 | 9/13/2019 8:07:32 AM | | PASS |
|
|
Expires: 03/09/20
|
BLD19-03466
| BLD-Final | 9/10/2019 | 9/11/2019 | 9/11/2019 4:49:23 PM | P | PASS |
|
|
call ahead // Kristin Winspear Phone #: ###-####//ok for occupancy//fire life safety passed// no changes to current building or layout//
|
BLD19-03279
| BLD-Final | 9/11/2019 | 9/11/2019 | 9/11/2019 4:07:10 PM | P | NR |
|
|
Charlie Phone #: ###-####//doors are locked//contact did not answer phone//left him a message to reschedule//
|
BLD19-01406
| BLD-Ceiling Grid Inspection | 9/11/2019 | 9/11/2019 | 9/11/2019 3:49:45 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Landvatter
|
BLD18-03382
| BLD-Final | 9/11/2019 | 9/11/2019 | 9/11/2019 3:36:05 PM | P | FAIL |
|
|
call for access // Damion Phone #: ###-####//second story layout does not reflect plans//added room upstairs// add step at garage man door//need blower door test//no crawl space access// see correction notice//
|
BLD18-02473
| BLD-Wall cover | 9/11/2019 | 9/11/2019 | 9/11/2019 3:08:32 PM | P | PASS |
|
|
Request for inspection for prior to wall cover, was asked by client to close opening in room. Framing, drywall etc Phone #: ###-#### Inspection requested via web by Neil Smart//will maintain existing rating on fire wall//hardware will be replaced prior to final//
|
BLD19-02220
| BLD-Ceiling Grid Inspection | 9/11/2019 | 9/11/2019 | 9/11/2019 2:35:57 PM | P | PASS |
|
|
Tom Phone #: ###-####//insulation fixed// grid ok to cover//
|
BLD19-03028
| BLD-Footing | 9/11/2019 | 9/11/2019 | 9/11/2019 2:06:27 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray//ok per approved plans//
|
BLD19-03389
| BLD-Footing | 9/10/2019 | 9/11/2019 | 9/11/2019 1:51:55 PM | P | FAIL |
|
|
john Phone #: ###-####//no plans available onsite//told worker onsite to call inspection in for tomorrow///
|
BLD18-04521
| BLD-Concrete | 9/10/2019 | 9/11/2019 | 9/11/2019 1:34:59 PM | P | PART |
|
|
Building Slab and interior footing pour scheduled for 6A.M. Thursday Morning. Phone #: ###-#### Inspection requested via web by Kris Linnell//vapor barrier ok//add bar to footings as discussed onsite// ok pending specials//
|
BLD19-03417
| BLD-Final | 9/10/2019 | 9/11/2019 | 9/11/2019 1:08:29 PM | P | FAIL |
|
|
David Phone #: ###-#### PLEASE CALL FOR ACCESS- main office is just accross the street//need fire final pass prior to inspection//
|
BLD19-03244
| BLD-Final | 9/9/2019 | 9/11/2019 | 9/11/2019 12:59:05 PM | P | PASS |
|
|
MAIN CONTACT - Brian Prussia: ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
|
BLD19-03244
| DOC - Permit Finaled | 9/11/2019 | 9/11/2019 | 9/11/2019 12:58:53 PM | P | PASS |
|
|
|
BLD19-01724
| BLD-Energy code compliance | 9/11/2019 | 9/11/2019 | 9/11/2019 12:26:16 PM | P | FAIL |
|
|
vinny Phone #: ###-####//need to fix framing of cantilever beam//
|
BLD19-01724
| BLD-Framing/Rough-in | 9/11/2019 | 9/11/2019 | 9/11/2019 12:25:37 PM | P | FAIL |
|
|
vinny Phone #: ###-####//site conditions on cantilevered beam do not match provided engineering//
|
BLD19-01678
| BLD-Framing/Rough-in | 9/10/2019 | 9/11/2019 | 9/11/2019 11:52:26 AM | A | FAIL |
|
|
Phone #: 2086089669 >> Inspection requested via mobile web by Nate Mason//add truss bracing// SDWC screws--a moajority of them are not installed correctly//correction notice onsite//
|
BLD19-01804
| BLD-Framing/Rough-in | 9/10/2019 | 9/11/2019 | 9/11/2019 11:20:27 AM | A | FAIL |
|
|
Vinnie Phone #: ###-####//correction notice posted 2 pages//
|
BLD19-03028
| BLD-Footing | 9/10/2019 | 9/11/2019 | 9/11/2019 10:38:25 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray///need city approved plans onsite//front property line need to be properly marked//
|
BLD19-03111
| BLD-Footing | 9/10/2019 | 9/11/2019 | 9/11/2019 10:20:31 AM | A | PART |
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru//setbacks ok per plans//WIP-still setting forms//discussed rebar he will get it in//
|
BLD19-00833
| BLD-Blower Door Test Results | 9/11/2019 | 9/11/2019 | 9/11/2019 10:13:53 AM | P | DONE |
|
|
3.0 ACH 50 1584 cfm @ 50 PA
|
BLD19-00833
| BLD-Final | 9/10/2019 | 9/11/2019 | 9/11/2019 10:12:10 AM | A | FAIL |
|
|
Garage Code: 4141 Phone #: ###-#### Inspection requested via web by Kai Duncan//need mechanical final//seal penetrations in garage around mechanical//
|
BLD17-04447
| BLD-Conference | 9/10/2019 | 9/11/2019 | 9/11/2019 9:52:12 AM | A | CANC |
|
|
Hello Michael, pre walk and consult preparing for final Phone #: ###-#### Inspection requested via web by Jim Carriveau//cancel per Jim-he will reschedule for tomorrow//
|
BLD19-00362
| BLD-Other | 9/11/2019 | 9/11/2019 | 9/11/2019 9:31:13 AM | A | PART |
|
|
area B and portion of area A hold downs//add double stud to hold down in corner// fix two hold downs(saddles upside down)// will double check next inspection//
|
BLD19-00362
| BLD-Other | 9/10/2019 | 9/11/2019 | 9/11/2019 9:28:58 AM | A | PART |
|
|
roof // Troy Phone #: ###-####//area c roof nailing//need to adjust nail depth//corrected onsite ok to continue...///
|
BLD19-01233
| BLD-Framing/Rough-in | 9/10/2019 | 9/11/2019 | 9/11/2019 8:39:39 AM | A | PASS |
|
|
jimmie//SSC clips installed per RFI 027 for connection of box header//correction made per Mikes notes//
|
BLD19-02763
| BLD-Energy code compliance | 9/10/2019 | 9/11/2019 | 9/11/2019 12:00:00 AM | A | CANC |
|
|
canel per dan conrad
Angie Phone #: ###-####
|
BLD19-00188
| BLD-Final | 9/10/2019 | 9/11/2019 | 9/11/2019 12:00:00 AM | P | CANC |
|
|
fire life saftey failed Melvin Phone #: ###-####
|