PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, September 13, 2019
.
Number of inspections:
31
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Tell Riley
Title
BLD-COM/RES INSPECTOR
Phone #
830-2752
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
BLD18-03382
BLD-Final
9/13/2019
9/13/2019
9/16/2019 9:04:04 AM
P
PASS
Damion Phone #: ###-####//corrections made//
BLD19-00949
BLD-Aging Inspection
9/13/2019
9/13/2019
9/16/2019 8:06:58 AM
PASS
Expires: 10/29/19
MIS18-00226
MIS-Aging Inspection
9/13/2019
9/13/2019
9/16/2019 8:06:06 AM
DONE
last inspection Jim
BLD19-03376
BLD-Energy code compliance
9/12/2019
9/13/2019
9/16/2019 7:58:37 AM
P
PASS
Michael Phone #: ###-####
BLD19-01166
BLD-Final
9/13/2019
9/13/2019
9/13/2019 3:27:39 PM
P
PASS
Mike Phone #: ###-####//hand rail fixed//
BLD19-01166
DOC - Permit Finaled
9/13/2019
9/13/2019
9/13/2019 3:27:18 PM
P
PASS
BLD19-01724
BLD-Energy code compliance
9/13/2019
9/13/2019
9/13/2019 3:00:24 PM
P
PASS
BLD18-00180
BLD-Blower Door Test Results
9/13/2019
9/13/2019
9/13/2019 2:42:04 PM
P
DONE
3.45 ACH 50
1981 CFM @ 50 pa
BLD18-00180
BLD-Final
9/12/2019
9/13/2019
9/13/2019 2:40:45 PM
P
PASS
Senad Phone #: ###-####//corrections made// final complete//
BLD18-00180
DOC - Permit Finaled
9/13/2019
9/13/2019
9/13/2019 2:40:22 PM
P
PASS
BLD19-03108
BLD-Footing
9/13/2019
9/13/2019
9/13/2019 2:24:18 PM
P
PART
Dion Phone #: ###-####//need to add rebar on north side per engineering detail// west setback--pier footings will not meet 5 foot setbacks per zoning///ok to pour areas not in conflict with setbacks//
BLD19-00820
BLD-Energy code compliance
9/12/2019
9/13/2019
9/13/2019 2:00:50 PM
P
PASS
Call ahead to meet // Noel Phone #: ###-####
BLD19-00362
BLD-Wall Bracing
9/13/2019
9/13/2019
9/13/2019 1:38:48 PM
P
PART
hold down // Troy Phone #: ###-####//hold downs and anchor bolts for shear walls in area A and B--bolts ok and hold downs corrected// insulation visual inspection area B//ledger attachment per detail on gym//
BLD19-01189
BLD-Blower Door Test Results
9/13/2019
9/13/2019
9/13/2019 12:26:28 PM
P
DONE
4.5 ACH 50
1761 CFM @ 50 pa
BLD19-01189
BLD-Final
9/13/2019
9/13/2019
9/13/2019 12:25:01 PM
P
PASS
BLD19-01189
DOC - Permit Finaled
9/13/2019
9/13/2019
9/13/2019 12:24:34 PM
P
PASS
BLD19-01724
BLD-Framing/Rough-in
9/13/2019
9/13/2019
9/13/2019 11:44:12 AM
P
CANC
Vinnie Phone #: ###-####//should be energy//
BLD19-01724
BLD-Framing/Rough-in
9/13/2019
9/13/2019
9/13/2019 11:37:51 AM
P
PASS
Vinnie Phone #: ###-####//corrections made//enginering fix provided and completed for cantilever beam//
BLD19-03376
BLD-Framing/Rough-in
9/12/2019
9/13/2019
9/13/2019 11:19:59 AM
A
PASS
Michael Phone #: ###-####
BLD19-01678
BLD-Framing/Rough-in
9/12/2019
9/13/2019
9/13/2019 10:59:07 AM
A
PASS
Phone #: 2086089669 >> Inspection requested via mobile web by Nate Mason//corrections made and information provided//
BLD19-01265
BLD-Wall Bracing
9/13/2019
9/13/2019
9/13/2019 10:44:55 AM
P
PART
//most walls ok to cover//need to add hold downs as discussed//need to portal frame at garage opening// re- nail portals at 3 inch oc//
BLD19-01265
BLD-Framing/Rough-in
9/12/2019
9/13/2019
9/13/2019 10:43:12 AM
A
CANC
BLD19-02312
BLD-Final
9/12/2019
9/13/2019
9/13/2019 10:06:40 AM
A
NR
Kevin Phone #: ###-####//need to have plans onsite for inspection//call in for re-isnpection//
BLD19-02377
BLD-Energy code compliance
9/12/2019
9/13/2019
9/13/2019 9:59:33 AM
A
PASS
BLD19-01189
BLD-Final
9/12/2019
9/13/2019
9/13/2019 9:39:04 AM
A
FAIL
Chad-call for access code Phone #: ###-####//need blower door test completed//
BLD19-01888
BLD-Framing/Rough-in
9/12/2019
9/13/2019
9/13/2019 9:17:20 AM
A
PART
If no one there, there is a lock box by the back door with key to the back door. The code to the box is 1957. After inspection could you let me know if it is okay to insulate. Phone #: ###-#### Inspection requested via web by Loren Dahl//need print out for engineered wood for floor joist span//add 4x4 for bearing per plans//need to add load bearing header at bedroom door//ok to insulate only///
BLD19-03108
BLD-Footing
9/12/2019
9/13/2019
9/13/2019 8:54:07 AM
A
FAIL
Setbacks will need to be approved by zoning--plans show 8 foot eastside setback measures roughly 6 foot 4 inches//please establish west propert line to verify setbacks//rebar will need to be installed and tied per engineering//call for re-inspection//
MIS18-00198
DOC - Permit Finaled
9/13/2019
9/13/2019
9/13/2019 8:14:17 AM
P
PASS
MIS18-00206
DOC - Permit Finaled
9/13/2019
9/13/2019
9/13/2019 8:13:07 AM
P
PASS
MIS18-00186
DOC - Permit Finaled
9/13/2019
9/13/2019
9/13/2019 8:12:07 AM
P
PASS
MIS18-00019
DOC - Permit Finaled
9/13/2019
9/13/2019
9/13/2019 8:10:07 AM
P
PASS