Inspections for the day of: Monday, September 23, 2019.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS19-00311 BLD-Conference9/20/20199/23/20199/24/2019 10:51:45 AMADONE
possible work without a permit Phone #: ###-####//went by location on 9/23 and 9/24 no work appears to be going on//this is a flooring and countertop warehouse//
BLD19-03105 BLD-Framing/Rough-in9/23/20199/23/20199/23/2019 3:23:06 PMPNR
Daniel Phone #: ###-####//needs electrical inspection//need to add studs at locations discussed//need to add shear blocks//call in for framing after electrical passes//
BLD19-02787 BLD-Ceiling Grid Inspection9/23/20199/23/20199/23/2019 2:00:57 PMPPART
Sid Phone #: ###-####//need to fire caulk penetrations at fire wall//ok to cover grid--leave grid out at firewall to check at final//
BLD19-02849 BLD-Foundation9/20/20199/23/20199/23/2019 11:04:37 AMAPART
Ryan-wall Phone #: ###-####//basement only//will need to call in for remainder of foundation//
BLD19-02888 BLD-Foundation9/20/20199/23/20199/23/2019 10:28:48 AMAPASS
Mud at 11 - Tiffany-stem wall Phone #: ###-####
BLD19-02384 BLD-Wall Bracing9/20/20199/23/20199/23/2019 9:19:21 AMAPART
Phone #: ###-#### Inspection requested via web by James Jackson//ok to wrap exterior//check blocking and portal frame straps at framing//will need to add holddown at front door where STHD14 is in wrong location//