Inspections for the day of: Friday, September 27, 2019.
Number of inspections: 39
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01726 BLD-Aging Inspection9/27/20199/27/20199/27/2019 5:29:37 PM PASS
Expires: 11/12/19
BLD19-03105 BLD-Wall Bracing9/27/20199/27/20199/27/2019 5:28:53 PMPPASS
Dan Phone #: ###-####
BLD19-01949 BLD-Framing/Rough-in9/27/20199/27/20199/27/2019 5:04:09 PMPFAIL
Call half hour before // Doyle Phone #: ###-####//1 hr ceiling does not meet details on plans//submit plan mod for changes in fire rated ceiling//verify penetrations for cans in rated ceiling//
BLD19-00093 BLD-Final9/27/20199/27/20199/27/2019 4:42:29 PMPNR
Charity-call prior to meet for access Phone #: ###-####//need plumbing final//all other areas ok//
BLD19-02660 BLD-Ceiling Grid Inspection9/27/20199/27/20199/27/2019 4:13:42 PMPPASS
firecaulk complete//grid ok//
BLD18-02107 BLD-Conference9/26/20199/27/20199/27/2019 3:54:07 PMPDONE
If we can meet after 3:30 that would be great. Please call or text me 15min before you get to my house and I will meet you there. Thank you! Phone #: ###-#### Inspection requested via web by Daniel Grover
BLD19-03315 BLD-Footing9/26/20199/27/20199/27/2019 3:35:57 PMPPASS
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru//cancel per Ricardo//
BLD19-01838 BLD-Final9/26/20199/27/20199/27/2019 2:55:16 PMPPART
Carl Phone #: ###-####//phase 1 TCO approved//
BLD19-02660 BLD-Ceiling Grid Inspection9/27/20199/27/20199/27/2019 2:30:08 PMPNR
Tony Phone #: ###-####//need to firecaulk all penetrations through 2 hour wall//
BLD19-03727 BLD-Final9/27/20199/27/20199/27/2019 2:08:24 PMPFAIL
Phone #: ###-#### Inspection requested via web by Joseph knight//need plumbing permits and electrical permits and inspections for remodel//
BLD17-01642 BLD-Final9/27/20199/27/20199/27/2019 1:54:28 PMPCANC
Brandy Phone #: ###-####//cannot find address//correct address and call for re-inspection//
BLD19-02288 BLD-Final9/27/20199/27/20199/27/2019 1:49:53 PMPFAIL
Brandy Phone #: ###-####//need to add handrail to back steps//handrail on front steps to high at front//38'' max height//
BLD17-03869 BLD-Final9/27/20199/27/20199/27/2019 1:43:30 PMPFAIL
Brandy Phone #: ###-####//correction notice posted//need to add handrails//maintain 1.5 inch clearance on sides of handrails//
BLD19-02289 BLD-Final9/27/20199/27/20199/27/2019 1:36:10 PMPFAIL
Brandy Phone #: ###-####//need handrail on rear steps//need electrical final(not linked to permit)//correction notice postede//
BLD18-00367 BLD-Final9/27/20199/27/20199/27/2019 1:25:39 PMPFAIL
Brandy Phone #: ###-####//guard at steps to low//handrail too low//correction notice posted//
BLD17-04226 BLD-Final9/27/20199/27/20199/27/2019 1:19:17 PMPFAIL
Brandy Phone #: ###-####//handrail at back steps is still over 38" max height//
BLD19-02290 BLD-Final9/27/20199/27/20199/27/2019 1:08:02 PMPFAIL
Brandy Phone #: ###-####//back porch handrail needs to return back into guard//
BLD19-02972 BLD-Wall Bracing9/26/20199/27/20199/27/2019 12:52:17 PMPFAIL
shear // Vedad Phone #: ###-####//need engineering for tall walls//add straps to header at portal frame//correction notice posted//
BLD18-03443 BLD-Energy code compliance9/27/20199/27/20199/27/2019 12:42:48 PMPPASS
BLD18-03443 BLD-Framing/Rough-in9/26/20199/27/20199/27/2019 12:41:56 PMPCANC
Greg Phone #: ###-####
BLD19-02859 BLD-Final9/26/20199/27/20199/27/2019 12:28:45 PMPPASS
Patrick Phone #: ###-####//final complete//
BLD19-02859 DOC - Permit Finaled9/27/20199/27/20199/27/2019 12:28:27 PMPPASS
BLD19-03537 BLD-Final9/23/20199/27/20199/27/2019 12:19:01 PMAPASS
Inspection requested via web by Hans Weikl//roof appears to be installed within code requirements//
BLD19-03537 DOC - Permit Finaled9/27/20199/27/20199/27/2019 12:18:30 PMPPASS
BLD19-03194 BLD-Framing/Rough-in9/27/20199/27/20199/27/2019 12:09:33 PMPPASS
Call 20 mins ahead-Tim Phone #: ###-####//ok for wall cover only//call for grid inspection//
BLD19-02546 BLD-Final9/26/20199/27/20199/27/2019 11:57:25 AMAPASS
Need inspection ASAP in morning please...... and thank you! have a great weekend! Phone #: ###-#### Inspection requested via web by Candyce Moss
BLD19-02546 DOC - Permit Finaled9/27/20199/27/20199/27/2019 11:56:46 AMPPASS
BLD19-03649 BLD-Final9/26/20199/27/20199/27/2019 11:44:12 AMAPASS
Adam Phone #: ###-####//no changes to existing//
BLD19-03267 BLD-Framing/Rough-in9/26/20199/27/20199/27/2019 11:20:43 AMANR
call ahead please- John Phone #: ###-####//window ok//need plumbing and electrial rough completed//
BLD19-03311 BLD-Final9/26/20199/27/20199/27/2019 11:05:17 AMAPASS
Brian Prussia: ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD19-03311 DOC - Permit Finaled9/27/20199/27/20199/27/2019 11:05:08 AMPPASS
BLD19-01045 BLD-Other9/26/20199/27/20199/27/2019 10:50:26 AMAPASS
fire wall // Tony Phone #: ###-####//all penetrations sealed//
BLD18-03200 BLD-Final9/26/20199/27/20199/27/2019 10:50:01 AMAPASS
Tony Phone #: ###-####//final complete per plans//pending all special inspections are complete and final//
BLD19-02010 BLD-Wall Bracing9/27/20199/27/20199/27/2019 10:02:52 AMAFAIL
Phone #: ###-#### Inspection requested via web by Carl Funk//sthds in wrong locations//framing and nailing needs address at portal frames//window added in shear location at front entry//2 hr wall does not reflect plans//
BLD19-02007 BLD-Wall Bracing9/27/20199/27/20199/27/2019 10:01:43 AMAFAIL
Phone #: ###-#### Inspection requested via web by Carl Funk//need to address nailing and blocking at portal frames//sthds in wrong locations//windows added in shear location at front entry//2 hr wall contruction does not match plans//
BLD19-02600 BLD-Framing/Rough-in9/27/20199/27/20199/27/2019 9:26:14 AMAFAIL
Phone #: ###-#### Inspection requested via web by Kelly Stover//need rough ins for mechanical completed and inspected prior to framing//
BLD19-02238 BLD-Framing/Rough-in9/26/20199/27/20199/27/2019 9:24:47 AMAPART
Chris Phone #: ###-####//ok to cover bathroom walls only//need shearwalls to reflect plans--anchoring, posts,mechanical connections and shear nailing//need mechanical inspection for ceilings//
BLD19-01619 BLD-Wall Bracing9/26/20199/27/20199/27/2019 8:51:05 AMAPASS
Dean Phone #: ###-####//ok per plans//
BLD19-01949 BLD-Framing/Rough-in9/26/20199/27/20199/27/2019 8:24:53 AMAFAIL
Doel Phone #: ###-####//no framers onsite//appears to be front entry cover--framing is not visible as framing has already been covered//call for re-inspection//