BLD18-03378
| BLD-Aging Inspection | 9/3/2019 | 9/3/2019 | 9/4/2019 8:13:03 AM | | CANC |
|
|
|
BLD18-03122
| BLD-Energy code compliance | 8/30/2019 | 9/3/2019 | 9/3/2019 3:48:34 PM | A | PART |
|
|
Matt Phone #: ###-####//corrections made//ok to cover//fire sprinklers were approved per troy//103,104,203,204,303,304//
|
BLD18-00104
| BLD-Final | 9/3/2019 | 9/3/2019 | 9/3/2019 3:23:50 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//temp only//need to fire tape or fire caulk seams in upper riser room//fire caulk around areas cut in lower riser room//fix ceiling (hole wher sprinkler was moved)//will need to call re-inspection to verifiy//
|
BLD19-01937
| BLD-Energy code compliance | 9/3/2019 | 9/3/2019 | 9/3/2019 2:46:29 PM | P | PASS |
|
|
Charles Phone #: ###-####
|
BLD19-03225
| BLD-Conference | 9/3/2019 | 9/3/2019 | 9/3/2019 2:23:44 PM | P | DONE |
|
|
Would like a meet up to address a couple item. Please give me a shout if you can prior to coming by. Framer (Tom) is on site but id like to be in the conversation. Thanks, Ryan Allen Phone #: ###-#### Inspection requested via web by Ryan Allen
|
BLD19-02263
| BLD-Wall Bracing | 9/3/2019 | 9/3/2019 | 9/3/2019 1:34:28 PM | P | FAIL |
|
|
Gari Phone #: ###-####//portal frames do not match engineering//details on engineering are not readable//please see correction notice onsite//
|
BLD19-03216
| BLD-Foundation | 9/3/2019 | 9/3/2019 | 9/3/2019 1:08:00 PM | P | PASS |
|
|
Mike- foundation Phone #: ###-####
|
BLD19-03376
| BLD-Conference | 8/30/2019 | 9/3/2019 | 9/3/2019 10:49:21 AM | A | DONE |
|
|
Michael Phone #: ###-####//pre-con//
|
BLD19-01166
| BLD-Final | 8/30/2019 | 9/3/2019 | 9/3/2019 10:14:30 AM | A | PART |
|
|
Mike Phone #: ###-####//need to change handrail at steps to meet code requirements//discussed with contractor on phone//all other areas complete//
|
BLD19-01314
| BLD-Framing/Rough-in | 8/30/2019 | 9/3/2019 | 9/3/2019 10:11:02 AM | A | PASS |
|
|
Willy Phone #: ###-####//ok to insulate only//correction for minor framing corrections posted//
|
BLD19-01949
| BLD-Framing/Rough-in | 8/30/2019 | 9/3/2019 | 9/3/2019 9:30:45 AM | A | PART |
|
|
Doyle Phone #: ###-####//north wing framing of exterior accents ok per plans//ad fire blocking as discussed//call for other wings framing inspections//
|