PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, January 11, 2017
.
Number of inspections:
22
Percentage of inspections complete:
91 %
Percentage of inspections not complete:
9 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC16-00406
General Inspection
1/5/2017
1/9/2017
P
check for snowmelt issues
ESC15-00853
General Inspection
1/10/2017
1/10/2017
ESC11-00879
General Inspection
1/11/2017
1/11/2017
1/19/2017 8:21:18 AM
CANC
ESC15-01175
General Inspection
1/11/2017
1/11/2017
1/19/2017 8:14:43 AM
CANC
ESC13-00806
General Inspection
1/11/2017
1/11/2017
1/17/2017 8:11:39 AM
CANC
ESC12-00403
General Inspection
1/11/2017
1/11/2017
1/17/2017 8:11:24 AM
CANC
ESC15-00403
General Inspection
1/11/2017
1/11/2017
1/12/2017 8:28:23 AM
CANC
ESC16-00770
General Inspection
1/11/2017
1/11/2017
1/12/2017 8:26:30 AM
CANC
ESC16-00788
General Inspection
1/11/2017
1/11/2017
1/12/2017 8:26:19 AM
CANC
ESC15-00729
General Inspection
1/11/2017
1/11/2017
1/11/2017 5:10:30 PM
P
PEND
Significant snow melt and storm water runoff is occuring on site. On the front side of site, all water is being retained in the stormwater ponds with no offsite discharge. Within the system the flow of water has eroded the check dam lined channel on the west side of Barber Dr up the hill near Hoot Owl. Check dams need new design with a V shape weir in the center to allow water to go down the middle of the channel instead of around it. The channel should also be stabilized and/or vegetated when conditions allow.
On the back side, there is some snowmelt and stormwater runoff discharging to Council Springs Creek per design. The retention/settling ponds are working to treat runoff but after discharging water has routed outside of the geotextile & rip rap lined channel causing erosion. Several areas of mudslides have displaced wattles and rill & gully erosion is occuring. Water running down these slopes go to the riprapped drainage channels and eventually to Council Springs.
Note: water in Council Springs Creek upstream from area of development is turbid/muddy and no visible significant change after passing through HRN discharge area.
Correction request:
- inspect back slope areas and discharge channel. Additional sediment controls and water management is required to prevent muddy discharges into the Creek.
Will conduct follow up tomorrow.
ESC15-01210
General Inspection
1/11/2017
1/11/2017
1/11/2017 4:58:56 PM
P
PASS
Observed on 1/10 in PM runoff was not reaching the subdivision inlets and blocked by snow and ice. Runoff was running down street beyond subdivsion stormwater facilities. Runoff was clear.
RP fulfilled correction request by having crew clear gutters and flow into inlets in the subdivision to capture and treat runoff. Crew chief stated inlet bags were also removed and new bags installed.
ESC16-01253
General Inspection
1/11/2017
1/11/2017
1/11/2017 4:55:19 PM
P
FAIL
No stockpile perimeter sediment controls installed on bottom end of foundation backfill stockpile placed on adajecent lot.
Construction entrance area beyond asphalt is muddy and needs more construction rock.
BMP follow up inspection scheduled for 1/12
ESC15-01288
General Inspection
1/11/2017
1/11/2017
1/11/2017 12:52:09 PM
A
PEND
Drainage channel within subdivision receiving large amount of runoff. Permalock mats for channel stabilization have been under cut by flow of water. Conditions currently not good for maintenance or repair and assessment of erosion that has occured. Muddy runoff collecting in the stormwater retention area at bottom of site and is 50% full (estimate) - no discharge to other side of road towards River. Will continue to monitor.
ESC16-00448
General Inspection
1/11/2017
1/11/2017
1/11/2017 11:15:31 AM
A
PEND
Rootop and site snowmelt, ice, and rain has pooled up around building foundation and entrance. Solution in works to remove water, no land application, flow to storm drains, or to garage trench drains and interceptor was allowed. Appears a vac truck is now being used....
Removal of temp BMP on MS4 allowed to try and improve drainage.
ESC16-00588
Aging Inspection
1/11/2017
1/11/2017
1/11/2017 8:16:12 AM
CANC
ESC16-00819
General Inspection
1/11/2017
1/11/2017
1/11/2017 8:14:44 AM
CANC
ESC16-00350
Aging Inspection
1/11/2017
1/11/2017
1/11/2017 8:14:25 AM
CANC
ESC16-00569
Aging Inspection
1/11/2017
1/11/2017
1/11/2017 8:13:52 AM
CANC
ESC16-00810
General Inspection
1/11/2017
1/11/2017
1/11/2017 8:13:38 AM
CANC
ESC16-00359
Aging Inspection
1/11/2017
1/11/2017
1/11/2017 8:12:57 AM
CANC
ESC16-00354
Aging Inspection
1/11/2017
1/11/2017
1/11/2017 8:12:26 AM
DONE
ESC16-00354
DOC - Permit Finaled
1/11/2017
1/11/2017
1/11/2017 8:08:57 AM
P
PASS