Inspections for the day of: Friday, January 12, 2018.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00156 General Inspection1/12/20181/12/20181/16/2018 8:06:04 AM CANC
ESC17-00344 Aging Inspection1/12/20181/12/20181/12/2018 4:12:27 PM PASS
Work complete, BLD finaled. No ESC issues.
ESC17-00344 DOC - Permit Finaled1/12/20181/12/20181/12/2018 4:12:04 PMPPASS
ESC15-01579 General Inspection1/12/20181/12/20181/12/2018 12:11:39 PM PEND
No trackout or discharges.

Need to advise RP to protect root zones of trees south of project, vehicle and equipment have tracked here.
ESC16-01650 General Inspection1/12/20181/12/20181/12/2018 11:57:46 AM CANC
rescheduled
ESC17-00793 General Inspection1/12/20181/12/20181/12/2018 11:57:06 AMAPASS
Foundation and rock walls complete. Perimeter wattles installed. Snake-bag check dams placed in gutter below site to slow and treat runoff. RP on duty. No corrections.
ESC16-01714 DOC - Permit Finaled1/12/20181/12/20181/12/2018 11:52:01 AMPPASS
ESC17-00549 Site Final1/12/20181/12/20181/12/2018 11:44:55 AMPPASS
Work complete, BLD finaled. No disturbed area or loose materials on site. ESC permit finaled.
ESC04-00737 DOC - Permit Finaled1/12/20181/12/20181/12/2018 11:43:13 AMPPASS
ESC03-01304 DOC - Permit Finaled1/12/20181/12/20181/12/2018 11:43:05 AMPPASS
ESC03-00033 DOC - Permit Finaled1/12/20181/12/20181/12/2018 11:41:58 AMPPASS
ESC17-00791 General Inspection1/12/20181/12/20181/12/2018 11:39:25 AMPPASS
Grading and boulder removal has started. Permit sign posted. Perimeter vegetation preserved, no trackout. RP states that boulders to be hauled off, debris dumped on site over years removed and then additional perimeter BMPs will be installed. No corrections at this time.
ESC16-00225 Conference1/12/20181/12/20181/12/2018 11:26:09 AMPPASS
No new erosion issues, slopes are well vegetated. RP on site daily. Gutters on slopes have snake-bag check dams to slow flow of water and trap sediment. Basin DIs have filter mats throughout, drains on slope do not.

Correctiive action discussed with RP Eric:
- install slope interupting berm or BMPs above the new stormwater pond at east end of Trent. He said equipment will be onsite next week and he will have it done weather permitting.
ESC17-00892 General Inspection1/12/20181/12/20181/12/2018 11:23:35 AMPPART
WIP on exterior finishes and interior. No trackout or discharges observed. No sediment runoff observed on back slope to Windsong.

Maintenance and sweeping needed in gutter around storm drain on Echo. Install new filter mat.
ESC16-00329 General Inspection1/12/20181/12/20181/12/2018 11:21:56 AM PASS
WIP on addition. No ESC violations. Runoff from disturbed flows to back yard.
ESC17-00392 General Inspection1/12/20181/12/20181/12/2018 10:44:32 AMPPART
Vertical construction in progress on apartment building. Site is not yet paved, most worker vehicles are parked on street to prevent trackout. Some minor trackout to Goodman, but does not extend to Warm Springs. Permit sign posted, trash container onsite. Site is below grade of surrounding area and retains stormwater.

Correction request:
- pick up loose trash around site, in particular on the NW side of building.
- continue to do regualar cleaning of trackout until curb and sidewalk is installed and new road mix base can be put in parking lot. Note: Suez water to return to pick up asphalt pile and small stock pile.
- sweep dirt in entrance to adjacent dental office.
ESC17-01135 General Inspection1/12/20181/12/20181/12/2018 10:43:59 AMPPART
Vertical construction in progress on apartment building. Site is not yet paved, most worker vehicles are parked on street to prevent trackout. Some minor trackout to Goodman, but does not extend to Warm Springs. Permit sign posted, trash container onsite. Site is below grade of surrounding area and retains stormwater.

Correction request:
- pick up loose trash around site, in particular on the NW side of building.
- continue to do regualar cleaning of trackout until curb and sidewalk is installed and new road mix base can be put in parking lot. Note: Suez water to return to pick up asphalt pile and small stock pile.
- sweep dirt in entrance to adjacent dental office.
ESC03-01097 DOC - Permit Finaled1/12/20181/12/20181/12/2018 10:11:27 AMPPASS
ESC17-00194 Aging Inspection1/12/20181/12/20181/12/2018 9:51:42 AM CANC
rescheduled