ESC16-00156
| General Inspection | 1/12/2018 | 1/12/2018 | 1/16/2018 8:06:04 AM | | CANC |
|
|
|
ESC17-00344
| Aging Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 4:12:27 PM | | PASS |
|
|
Work complete, BLD finaled. No ESC issues.
|
ESC17-00344
| DOC - Permit Finaled | 1/12/2018 | 1/12/2018 | 1/12/2018 4:12:04 PM | P | PASS |
|
|
|
ESC15-01579
| General Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 12:11:39 PM | | PEND |
|
|
No trackout or discharges.
Need to advise RP to protect root zones of trees south of project, vehicle and equipment have tracked here.
|
ESC16-01650
| General Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 11:57:46 AM | | CANC |
|
|
rescheduled
|
ESC17-00793
| General Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 11:57:06 AM | A | PASS |
|
|
Foundation and rock walls complete. Perimeter wattles installed. Snake-bag check dams placed in gutter below site to slow and treat runoff. RP on duty. No corrections.
|
ESC16-01714
| DOC - Permit Finaled | 1/12/2018 | 1/12/2018 | 1/12/2018 11:52:01 AM | P | PASS |
|
|
|
ESC17-00549
| Site Final | 1/12/2018 | 1/12/2018 | 1/12/2018 11:44:55 AM | P | PASS |
|
|
Work complete, BLD finaled. No disturbed area or loose materials on site. ESC permit finaled.
|
ESC04-00737
| DOC - Permit Finaled | 1/12/2018 | 1/12/2018 | 1/12/2018 11:43:13 AM | P | PASS |
|
|
|
ESC03-01304
| DOC - Permit Finaled | 1/12/2018 | 1/12/2018 | 1/12/2018 11:43:05 AM | P | PASS |
|
|
|
ESC03-00033
| DOC - Permit Finaled | 1/12/2018 | 1/12/2018 | 1/12/2018 11:41:58 AM | P | PASS |
|
|
|
ESC17-00791
| General Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 11:39:25 AM | P | PASS |
|
|
Grading and boulder removal has started. Permit sign posted. Perimeter vegetation preserved, no trackout. RP states that boulders to be hauled off, debris dumped on site over years removed and then additional perimeter BMPs will be installed. No corrections at this time.
|
ESC16-00225
| Conference | 1/12/2018 | 1/12/2018 | 1/12/2018 11:26:09 AM | P | PASS |
|
|
No new erosion issues, slopes are well vegetated. RP on site daily. Gutters on slopes have snake-bag check dams to slow flow of water and trap sediment. Basin DIs have filter mats throughout, drains on slope do not.
Correctiive action discussed with RP Eric: - install slope interupting berm or BMPs above the new stormwater pond at east end of Trent. He said equipment will be onsite next week and he will have it done weather permitting.
|
ESC17-00892
| General Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 11:23:35 AM | P | PART |
|
|
WIP on exterior finishes and interior. No trackout or discharges observed. No sediment runoff observed on back slope to Windsong.
Maintenance and sweeping needed in gutter around storm drain on Echo. Install new filter mat.
|
ESC16-00329
| General Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 11:21:56 AM | | PASS |
|
|
WIP on addition. No ESC violations. Runoff from disturbed flows to back yard.
|
ESC17-00392
| General Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 10:44:32 AM | P | PART |
|
|
Vertical construction in progress on apartment building. Site is not yet paved, most worker vehicles are parked on street to prevent trackout. Some minor trackout to Goodman, but does not extend to Warm Springs. Permit sign posted, trash container onsite. Site is below grade of surrounding area and retains stormwater.
Correction request: - pick up loose trash around site, in particular on the NW side of building. - continue to do regualar cleaning of trackout until curb and sidewalk is installed and new road mix base can be put in parking lot. Note: Suez water to return to pick up asphalt pile and small stock pile. - sweep dirt in entrance to adjacent dental office.
|
ESC17-01135
| General Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 10:43:59 AM | P | PART |
|
|
Vertical construction in progress on apartment building. Site is not yet paved, most worker vehicles are parked on street to prevent trackout. Some minor trackout to Goodman, but does not extend to Warm Springs. Permit sign posted, trash container onsite. Site is below grade of surrounding area and retains stormwater.
Correction request: - pick up loose trash around site, in particular on the NW side of building. - continue to do regualar cleaning of trackout until curb and sidewalk is installed and new road mix base can be put in parking lot. Note: Suez water to return to pick up asphalt pile and small stock pile. - sweep dirt in entrance to adjacent dental office.
|
ESC03-01097
| DOC - Permit Finaled | 1/12/2018 | 1/12/2018 | 1/12/2018 10:11:27 AM | P | PASS |
|
|
|
ESC17-00194
| Aging Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 9:51:42 AM | | CANC |
|
|
rescheduled
|