ESC13-00788
| BMP Violation | 1/14/2014 | 1/14/2014 | 1/14/2014 4:25:49 PM | P | FAIL |
|
|
RP Bobby Silva to clean sidewalks from the recent blowout onto Arrow Villa.
Corrections to be made: 1. Clean up dirt/sediment on street 2. Replace affected DI bags 3. Re-install damaged wattles 4. Place permiter wattles on bare sites owned by Wood River.
Will re-inspect
|
ESC12-01066
| Tracking Control | 1/14/2014 | 1/14/2014 | 1/14/2014 2:43:15 PM | P | PEND |
|
|
Track out observed yesterday has been reduced, but the construction entrance needs to be elongated to full 50 feet with thicker layer of rock/gravel. Verbal CN given to RP Kent Giese.
Kent # ###-####
|
ESC11-00525
| Aging Inspection | 1/14/2014 | 1/14/2014 | 1/14/2014 12:48:14 PM | | PASS |
|
|
Neighborhood BMPs satisfactory. Washout less than 50% capacity and open lots have perimeter wattles. Some track out by Brighton Homes to be addressed. seperately. Sweeping frequency may need to be increased if contractors can't keep dirt on lots.
|
ESC13-01276
| Site Preparation | 1/14/2014 | 1/14/2014 | 1/14/2014 12:39:41 PM | P | PART |
|
|
Austin Phone #: ###-####
Site is ready for excavation. No construction activity has started prior to this site prep inspection; permit will be posted this afternoon. Need to clean up alley for work on 2551 Old Hickory before work can begin.
Note: Austin has assumed role of RP for Hunter Homes for Rollo Bird.
|
ESC13-01251
| Site Preparation | 1/14/2014 | 1/14/2014 | 1/14/2014 12:37:43 PM | P | PART |
|
|
Austin Phone #: ###-####
Site is ready for excavation. No construction activity has started prior to this site prep inspectoin; permit will be posted this afternoon.
Note: Austin has assumed role of RP for Hunter Homes for Rollo Bird.
|
ESC13-00824
| General Inspection | 1/14/2014 | 1/14/2014 | 1/14/2014 12:07:34 PM | | PART |
|
|
Verbal to RP Shane to keep contractors off mud as much as possible. Parking should be on street only. No other corrections at this time. WIP.
|
ESC13-00806
| General Inspection | 1/14/2014 | 1/14/2014 | 1/14/2014 12:05:09 PM | | PART |
|
|
Most of site in good condition.
Corrections:
1. Trench in back of lot silt fence
2. Replenish construction entrance. 3. Continue weekly sweeping
Verbal CN given to contractor Randy ####-#### and ESC assistant Todd whom were on-site. They have till Thursday to complete corrections.
|
ESC13-00798
| General Inspection | 1/14/2014 | 1/14/2014 | 1/14/2014 11:14:05 AM | | FAIL |
|
|
RP David Wipper to re-install perimeter BMPs that have failed, pick up trash, and sweep sidewalks. This in addition to addressing issues on Canyon Crest future homesites in Eyrie Canyon 6 & 7.
|
ESC13-00802
| General Inspection | 1/14/2014 | 1/14/2014 | 1/14/2014 11:13:05 AM | | FAIL |
|
|
RP David Wipper to re-install perimeter BMPs that have failed, pick up trash, and sweep sidewalks. This in addition to addressing issues on Canyon Crest future homesites in Eyrie Canyon 6 & 7.
|
ESC13-00764
| Conference | 1/13/2014 | 1/14/2014 | 1/14/2014 11:02:37 AM | A | DONE |
|
|
Met RP/developer Colin Connel with Evan and ACHD eerosion inspector.
Meeting discussed corrections to be made at end of Bent Bow and perimeter. Lots that have been graded but do not have current construction activity permits will be accomplished by Wood River and Canyon Crest whom own some of the individual sites.
Contractors have been given several days to have BMPs delivered and installed. Sweeping and DI bag clean out will be addressed today.
|
ESC12-00380
| Aging Inspection | 1/14/2014 | 1/14/2014 | 1/14/2014 8:56:40 AM | | PASS |
|
|
Finaled.
|
ESC12-00380
| DOC - Permit Finaled | 1/14/2014 | 1/14/2014 | 1/14/2014 8:56:27 AM | P | PASS |
|
|
Townhome exterior complete and landscaped. No materials outside site. No further development. BLD for 2018 Pond is open but all ESC permit conditions satisfied
|
ESC13-00710
| General Inspection | 1/14/2014 | 1/14/2014 | 1/14/2014 8:45:26 AM | | PASS |
|
|
No construction activity has started. Permit was paid for online before issued, so is not actually issued - software error. BLD permit still under review. ESC plan submitted and approved. 2nd week of January.
|