Inspections for the day of: Thursday, January 14, 2016.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01003 Aging Inspection1/14/20161/14/20161/14/2016 4:18:04 PM PASS
ESC14-00432 General Inspection1/14/20161/14/20161/14/2016 3:43:08 PM CANC
rescheduled 1/18
ESC14-00206 General Inspection1/14/20161/14/20161/14/2016 3:42:16 PM PASS
ESC15-00556 General Inspection1/14/20161/14/20161/14/2016 3:30:00 PM PASS
No muddy runoff from snowmelt. No corrections needed at this time.
ESC15-00729 Tracking Control1/14/20161/14/20161/14/2016 3:28:06 PMPPART
Trackout has been attempted to be cleaned at both access points to Harris Ranch North.

Barber Drive entrance has been improved with sandy pit run and a rock tracking pad. Smaller round rock used for pad which is not as effective as the prescribed 2-3" rock for entrance

Council Springs Road has been cleaned but is so muddy that wet mud and sediment is in the road cracks and currently can't be removed. Need to bolster the rock entrance and continue to clean daily.

ESC13-00684 General Inspection1/14/20161/14/20161/14/2016 2:16:31 PM PASS
No discharges or trackout out of subdivision. Several SFHs in progress. Streets will need to be swept when conditions dry. Storm drains have sediment bags installed. Approved.
ESC12-01066 General Inspection1/14/20161/14/20161/14/2016 12:52:24 PM PEND
Kent with Steed is back in town on new project, he stated he will get the DI bag in MS4 removed.
ESC15-01061 General Inspection1/14/20161/14/20161/14/2016 11:45:46 AMPPASS
WIP. No significant trackout, no discharges. Most of silt fence is still trenched in and keep sediment off sidewalk and onsite.
ESC03-01358 DOC - Permit Finaled1/14/20161/14/20161/14/2016 11:41:57 AMPPASS
old permit in database
ESC15-01520 Site Preparation1/14/20161/14/20161/14/2016 11:41:15 AMPPASS
Approved for excavation earlier in coordination with adjacent lot by same builder.

Snow covered conditions at time of inspection. No trackout, excavator not driving off of lot. Workers parked on street. Perimeter wattles installed. Approved, no corrections at this time.

ESC14-00759 General Inspection1/14/20161/14/20161/14/2016 11:24:57 AM PASS
Home is complete, landscaped, and retaining walls & perimeter vegetation are in place. No erosion issues observed in recent inspections, all temp BMPs removed.

ESC conditions satisfied.
ESC14-00759 DOC - Permit Finaled1/14/20161/14/20161/14/2016 11:21:08 AMPPASS
ESC14-01011 General Inspection1/14/20161/14/20161/14/2016 10:42:32 AM PASS
ESC15-00509 General Inspection1/14/20161/14/20161/14/2016 9:37:48 AM PASS
WIP on interior and frame. No excavation activities. Workers parking on paved culdesac instead of using driveway to reduce trackout. Silt fence BMP is installed at the downhill side of the project. No corrections at this time. Will need to sweep when conditions allow - wet and frozen dirt should be removed as best as practicable
ESC15-00884 Aging Inspection1/14/20161/14/20161/14/2016 9:02:20 AM PASS
Earth disturbance associated with construction has been stabilized. BLD is open. No sediment or other materials leaving site. No further ESC inspections.
ESC15-00884 DOC - Permit Finaled1/14/20161/14/20161/14/2016 9:01:24 AMPPASS