Inspections for the day of: Thursday, January 15, 2015.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00572 General Inspection1/14/20151/15/20151/15/2015 2:48:16 PMPPASS
Additional wattles have been installed along hillside contour/drainage path. Some minor hillside erosion will need to be raked/re-tracked. No significant trackout or discharges.
ESC14-00487 General Inspection1/15/20151/15/20151/15/2015 2:47:01 PM PASS
Home near completion, no further earth work but needs landscaping/stabilization. BMPs installed. No corrections at this time.
ESC14-00766 Aging Inspection1/15/20151/15/20151/15/2015 2:16:42 PM PASS
ESC14-00749 Aging Inspection1/15/20151/15/20151/15/2015 1:55:47 PM CANC
ESC14-00702 Aging Inspection1/15/20151/15/20151/15/2015 1:52:39 PM PASS
Home is complete, landscaped, and occupied. No ESC issues or corrections. Permit finaled.
ESC14-00702 DOC - Permit Finaled1/15/20151/15/20151/15/2015 1:52:12 PMPPASS
ESC14-01129 Site Preparation1/15/20151/15/20151/15/2015 1:39:02 PMPPART
CBH homes in Dropzone sub all have some trackout on sidewalks and streets, but is not being tracked out of subdivision. Drop inlet protection is installed on MS4. Permits posted at each site.

Corrections:
1. Need to have sweeping 1-2x every 2 weeks
2. Need to train employees to not park or drive on the mud.
ESC14-01035 General Inspection1/14/20151/15/20151/15/2015 11:26:53 AMAPART
check to see if Hard Rock cleaned up trackout

No major trackout and sediment kept within the BMP perimeter/designated area of disturbance.

Corrections:
1. Sweep sidewalks , especially where tractor drove across
2. Install new inlet protection for the damaged mats directly in front of site.

Verbal CN issued to RP Michael
ESC14-01129 Site Preparation1/14/20151/15/20151/15/2015 11:22:15 AMACANC
Brian Phone #: ###-####

approved to start, will inspect in the PM

ESC14-00661 General Inspection1/15/20151/15/20151/15/2015 11:20:04 AM PASS
ESC14-00662 General Inspection1/15/20151/15/20151/15/2015 10:55:59 AM PASS
DH #12 stockpiles in staging area are being redistributed across the site. The vehicle traffic is staying within site boundaries so no significant trackout to Old Hickory or Warm Springs.

No offsite discharges occuring at time of inspection, stormwater retention/settling pond still receive runoff and then flows into the pasture south of Warm Springs. No corrections at this time.
ESC14-01083 Random Inspection1/15/20151/15/20151/15/2015 10:51:21 AMAPASS
Barber Valley /Marian Willams Park townhome project is in progress. All sewer work is complete and no dewatering is in progress. Currently there is very little activity at site.

No trackout, permit posted, SWPPP and NOI at site.
ESC14-00676 General Inspection1/15/20151/15/20151/15/2015 10:11:52 AM PASS
Level 3 interior TI complete. BLD finaled. No disturbed area, waste materials or stockpiles remaining on site. ESC permit finaled.
ESC14-00676 DOC - Permit Finaled1/15/20151/15/20151/15/2015 10:10:56 AMPPASS
ESC14-00529 General Inspection1/15/20151/15/20151/15/2015 9:05:52 AM PASS
ESC14-00656 General Inspection1/15/20151/15/20151/15/2015 8:51:29 AM PASS
Warehouse frame is up and parking lot is paved.. WIP. No ESC violations observed.