ESC19-00041
| Site Preparation | 1/16/2019 | 1/16/2019 | 1/16/2019 3:32:08 PM | P | PASS |
|
|
Meeting with Carlo, Wendy w/ BPR, and Doug with BPW
Staging and entrance off Lake Harbor. No work within the river. Repair include installing fill, jute matting, and plantings to help stabilize the bank.
Request to keep a clean job site, post ESC permit sign, read and follow installation details for the jute matting.
|
ESC18-00430
| General Inspection | 1/16/2019 | 1/16/2019 | 1/16/2019 11:45:39 AM | P | FAIL |
|
|
Corrections needed: - install sediment protection on the storm drain at the Anderson and State Street exit. No protection installed - no ESC permit sign posted
No significant trackout, no loose trash, Outpak concrete washouts staged on site.
Verbal correction to Ron Perkins via phone. Follow up scheduled.
|
ESC18-01613
| General Inspection | 1/16/2019 | 1/16/2019 | 1/16/2019 11:13:09 AM | P | PEND |
|
|
Washout that was overfilled has been cleaned up. New lined washout provided on Birchgrove.
Wood River needs to build their own washout on Ashgrove
|