Inspections for the day of: Wednesday, January 16, 2019.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00041 Site Preparation1/16/20191/16/20191/16/2019 3:32:08 PMPPASS
Meeting with Carlo, Wendy w/ BPR, and Doug with BPW

Staging and entrance off Lake Harbor. No work within the river. Repair include installing fill, jute matting, and plantings to help stabilize the bank.

Request to keep a clean job site, post ESC permit sign, read and follow installation details for the jute matting.
ESC18-00430 General Inspection1/16/20191/16/20191/16/2019 11:45:39 AMPFAIL
Corrections needed:
- install sediment protection on the storm drain at the Anderson and State Street exit. No protection installed
- no ESC permit sign posted


No significant trackout, no loose trash, Outpak concrete washouts staged on site.

Verbal correction to Ron Perkins via phone. Follow up scheduled.
ESC18-01613 General Inspection1/16/20191/16/20191/16/2019 11:13:09 AMPPEND
Washout that was overfilled has been cleaned up. New lined washout provided on Birchgrove.

Wood River needs to build their own washout on Ashgrove