Inspections for the day of: Friday, January 18, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00935 General Inspection1/18/20191/18/20191/24/2019 4:19:26 PM CANC
ESC18-00529 General Inspection1/17/20191/18/20191/22/2019 1:17:22 PMPPASS
ESC16-00741 Site Final1/18/20191/18/20191/18/2019 4:51:15 PMPPASS
Building construction complete. Job site has been cleaned up, no loose trash, debris, loose sediment or disturbed area.

Storm drain has been cleaned on Idaho @ 6th as requested.

ESC permit conditions satisfied.
ESC17-00836 General Inspection1/18/20191/18/20191/18/2019 4:40:43 PM CANC
ESC18-01082 General Inspection1/18/20191/18/20191/18/2019 4:40:23 PMPPASS
WIP. straw man walk mud prevention installed over work area. DI bag installed south of site on Main.
ESC18-00946 General Inspection1/18/20191/18/20191/18/2019 4:37:50 PMPFAIL
Runoff from upper portion of lot is now starting to flow down the disturbed slope and is causing a rill. Wattle is about to overflow but has trapped the mud so far.

Called RP, he is coming to clean up mud behind wattle and install a berm or wattle at top of slope to prevent water from flowing over the slope.
ESC17-00954 Tracking Control1/18/20191/18/20191/18/2019 4:31:56 PMPPEND
Correction request to RP John to order street sweeper to clean up after SFH covered under ESC18-01244.
ESC18-01244 Complaint Inspection1/18/20191/18/20191/18/2019 4:16:03 PMPFAIL
Mud and dirt tracked out from accessing lot below home and driving around. RP out of town,

Subdivision RP John to order street sweeper for tonight to try to beat the rain storm that has been predicted.

Final trackout warning to RP. Will need to do through sweep, clean up, and maintenance on all BMPs.
ESC18-00106 Aging Inspection1/18/20191/18/20191/18/2019 2:48:38 PM PASS
ESC18-00430 General Inspection1/16/20191/18/20191/18/2019 2:38:57 PMPPART
Inlet protection installed in storm drain is not adequate.

Site did sweep sidewalk and gutter as requested. Permit sign now posted out front.

Request to install operational sediment filter bag in storm drain.
ESC18-01210 Site Preparation1/18/20191/18/20191/18/2019 2:37:25 PMPPASS
re-inspection fee paid, corrections in progress. Dewatering plan submitted and approved.

check plan set and corrections @ 1:30

Site has been swept as requested, permit sign is posted on fence along State STreet. Site currently inactive. Pusher Excavation will install new construction entrance leading west out of site to the old Turner's parking lot, site currently closed to access.

Reviewed ESC plan. Setup of pipes will begin this weekend, dewatering to resume next week. Request to install sediment protection on MS4 on State Street and to check that there will be no issues or obstructions along the route of dewatering water.

Follow up on Tuesday the 22nd
ESC16-00741 Site Final1/18/20191/18/20191/18/2019 11:47:26 AMPNR
Dirt and debris trapped by sediment bag at Idaho and 6th was left behind after removal and has not yet been cleaned as requested. Notified Adam with ESI
ESC18-01683 Site Final1/18/20191/18/20191/18/2019 10:39:04 AMPPASS
Demolition complete. All debris removed. Surface leveled with gravel. No temporary BMPs remaining arouund site. Permit finaled.
ESC18-01684 Site Final1/18/20191/18/20191/18/2019 10:38:49 AMPPASS
Demolition complete. All debris removed. Surface leveled with gravel. No temporary BMPs remaining arouund site. Permit finaled.
ESC17-01289 General Inspection1/18/20191/18/20191/18/2019 8:28:35 AM CANC
ESC17-01156 Aging Inspection1/18/20191/18/20191/18/2019 8:25:35 AM CANC
ESC17-01147 Site Final1/17/20191/18/20191/17/2019 2:59:41 PMPPASS
Home complete, landscaped, and occupied. No temp BMPs or disturbed area on site. ESC permit conditions satisfied.