Inspections for the day of: Tuesday, January 2, 2018.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01723 Site Final12/29/20171/2/20181/2/2018 2:23:12 PMAPASS
5x10 hole took out parcel basement owner didn''t not want filled. owner wants to put in full basement // Gerrie Phone #: ###-####

Structure demolished and debris removed. New home to be built onsite and is not vegetated. Lot is below grade of Gage Street. Okay for ESC permit final.

Schedule BLD - final
ESC17-00108 General Inspection1/2/20181/2/20181/2/2018 1:34:26 PM CANC
ESC15-00976 General Inspection1/2/20181/2/20181/2/2018 1:34:19 PM PASS
Foundations for new Idaho St. townhomes have been poured on east end of block. No activity currently. No ESC or housekeeping issues observed.
ESC17-01559 General Inspection1/2/20181/2/20181/2/2018 12:11:26 PMPPASS
Grading for project has not yet started. Stockpiles placed on lot prior to GRD issuance still onsite. More stockpiling is occuring by Lurre Construction. No trackout to Saturn, rock construction entrance installed. Will check conditions next week during warm weather to check for snowmelt discharges or trackout.
ESC16-01268 Aging Inspection1/2/20181/2/20181/2/2018 11:40:38 AM CANC
ESC17-00223 Aging Inspection1/2/20181/2/20181/2/2018 11:39:38 AM CANC
ESC17-00044 Aging Inspection1/2/20181/2/20181/2/2018 11:39:31 AM CANC
ESC16-00879 General Inspection1/2/20181/2/20181/2/2018 11:39:13 AMPPASS
Subdivision complete and awaiting new SFH construction by CBH in 2018. No ESC issues observed.
ESC17-01088 General Inspection1/2/20181/2/20181/2/2018 11:38:28 AMAPASS
No activity. Road has been graded but still needs utilities and paving. Multiple stockpiles on site, some bermed up along Cloverdale. No trackout, SWPPP posted on Simsbury.
ESC17-00218 General Inspection1/2/20181/2/20181/2/2018 11:24:43 AMPPASS
WIP on duplexes. No corrections requested. DI bags installed on Gatewood south of site in good condition. Trash contained.
ESC16-00192 General Inspection1/2/20181/2/20181/2/2018 11:23:20 AMPPASS
ESC16-00192 DOC - Permit Finaled1/2/20181/2/20181/2/2018 11:23:06 AMPPASS
Duplex complete and stabilized. DI bags installed on Gatewood for remaining construction. All permits finaled.
ESC16-00190 Site Final1/2/20181/2/20181/2/2018 11:22:53 AMPPASS
Duplex complete and stabilized. DI bags installed on Gatewood for remaining construction. All permits finaled.
ESC16-01008 Site Final1/2/20181/2/20181/2/2018 11:15:29 AMAPASS
Home complete, landscaped and occupied. DI bags for Peppermill will be removed by CBH upon completion of subdivision
ESC16-01265 DOC - Permit Finaled1/2/20181/2/20181/2/2018 11:13:22 AMPPASS
ESC16-01265 DOC - Permit Finaled1/2/20181/2/20181/2/2018 11:12:09 AMPPASS
ESC17-00102 General Inspection1/2/20181/2/20181/2/2018 11:02:18 AM PASS
WIP on framing apartment 4-plexes. Bird Street is now paved between Hackamore and Overland, some sections of sidewalk along east side of street are in progress. No trackout or discharges to Bird. Will follow up next week during above freezing temperature.
ESC17-00799 Random Inspection1/2/20181/2/20181/2/2018 10:38:23 AMAPASS
WIP on site and building interior. Parking lot is paved, stabilized construction access. No violations observed.

Note: no trackout currently from vacant lot on Ardene. Fence installed at Del Taco has been knocked down. Will request new solution once trackout occurs again.
ESC17-00657 General Inspection1/2/20181/2/20181/2/2018 10:35:28 AMAPASS
WIP on structures within site. No trackout or loose dirt leaving site. No discharges or loose trash issues observed. Permit sign and SWPPP posted.
ESC16-00973 General Inspection1/2/20181/2/20181/2/2018 8:46:13 AM CANC