Inspections for the day of: Wednesday, January 2, 2019.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01414 General Inspection1/2/20191/2/20191/7/2019 4:29:42 PM CANC
ESC15-00556 General Inspection1/2/20191/2/20191/7/2019 4:27:50 PM CANC
ESC18-01438 General Inspection12/28/20181/2/20191/4/2019 10:12:13 AMPFAIL
corrections not complete. No new violations.

2nd request to RP Joel to complete corrections by Thursday 1/10 PM
ESC18-01651 General Inspection12/28/20181/2/20191/4/2019 10:11:38 AMPFAIL
corrections not complete. No new violations.

2nd request to RP Joel to complete corrections by Thursday 1/10 PM
ESC17-01386 General Inspection12/28/20181/2/20191/4/2019 10:04:17 AMPCANC
rescheduled for site final
ESC17-01479 General Inspection1/2/20191/2/20191/4/2019 10:03:31 AM CANC
rescheduled
MIS18-00472 ESC-Conference12/28/20181/2/20191/3/2019 4:54:17 PMAPEND
No new activity where open parcel was accessed off Winter Camp by excavator machine.

Jenkins Erosion Control has installed a perimeter sediment control wattle properly, and material for erosion control blankets has been placed on a disturbed slope but does require further work for proper installation (stakes unable to be hammered in due to frozen ground, key trench at top of blanket, and shingle blankets down the slope). ESC contact Jill shall be notified of the corrections needed.

Notice was given to not do any placement of gravel or other material on this parcel until further notice or approval.

No further corrections requested at this time. Case is still under investigation for full resolution.
ESC17-01455 Aging Inspection1/2/20191/2/20191/3/2019 3:24:47 PM PASS
ESC18-01285 General Inspection12/28/20181/2/20191/3/2019 3:04:51 PMAFAIL
check on entrance

Corrections needed:

Entrance is compacted and will not work when muddy conditions return

Correction requests:
- scrape compacted rock to loosen hardened dirt.
- add additional angular rock to entrance to add edges to scape tires. Check construction details in ESC plan for specs.
- sweep sidewalk and gutter along Raymond Street next to project.

Written Correction notice posted with CM Company Darrel G.

Compliance is due Monday Jan 7 @12 PM
ESC14-01063 General Inspection1/2/20191/2/20191/3/2019 1:15:19 PM PART
3 SFHs in progress on Eyrie Way. Perimeter sediment control wattles and slope interuption wattles on hillsides are installed properly. No discharges or sediment runoff observed.

Lined concrete washout is installed at Arrow Villa and Winter Camp.

Correction request for next inspection (2 weeks)
- pick up and remove discarded BMPs and materials laying around on the parcel on Arrow Villa across from Goshawk, the former location of the concrete washout for phase 8 homes.
ESC17-01236 Aging Inspection1/2/20191/2/20191/3/2019 1:11:05 PM CANC
ESC18-01506 General Inspection1/2/20191/2/20191/3/2019 10:20:10 AMPPART
Inspected 1/2 5 PM.

Concrete for garage poured. Washout used was near full. Most washout was able to be contained. Some spills around washout area and in close proximity to ditch are visible; ditch is currently dry

Correction request:
- wait for washout in container to dry, then dispose of. New washout containment will be needed for upcoming cement work.

Correction issued to RP/GC.

No other violations, trash contained. Storm drain on Rim has sediment protection.
ESC18-00158 Aging Inspection1/2/20191/2/20191/2/2019 3:46:39 PM CANC
rescheduled for site final
ESC18-00156 Aging Inspection1/2/20191/2/20191/2/2019 3:44:04 PM CANC
rescheduled for site final
ESC18-00488 Conference1/2/20191/2/20191/2/2019 3:08:13 PMPDONE
phone call regarding submission of dewatering plan and updated SWPPP for project.
ESC18-00176 Conference1/2/20191/2/20191/2/2019 1:00:00 PMAPASS
ESC onsite conference with RP Eric to review ESC BMPs

- double-lined wooden concrete washout box has been placed on site. Will relocate once pump truck arrives
- large rock stabilized access is installed.
- sandbag perimeter built around the storm drain for sediment protection.
- ESC permit sign is posted.

Approved for construction.
ESC17-01771 Conference1/2/20191/2/20191/2/2019 12:44:34 PMPDONE
eric 2085591629


See ESC18-00176 for ESC permit coverage
ESC17-01771 DOC - Permit Finaled1/2/20191/2/20191/2/2019 12:44:17 PMPPASS
ESC18-00246 Aging Inspection1/2/20191/2/20191/2/2019 12:38:28 PM PASS
ESC18-00246 DOC - Permit Finaled1/2/20191/2/20191/2/2019 12:38:23 PMPPASS
ESC18-00939 BMP Violation1/2/20191/2/20191/2/2019 12:29:23 PMPFAIL
Corrections needed:

- pick up all loose trash and put in trash container
- sweep sidewalk, gutter, and street in front of the two projects by Harding Homes.

Verbal corrections issued to RP-GC Gene. Note: Young Meadow onsite contact is Ron. Follow up scheduled 1/7
ESC17-00315 General Inspection1/2/20191/2/20191/2/2019 8:21:04 AM CANC
ESC16-00617 General Inspection1/2/20191/2/20191/2/2019 8:12:32 AM CANC
ESC18-00233 DOC - Permit Finaled1/2/20191/2/20191/2/2019 8:09:22 AMPPASS