Inspections for the day of: Thursday, January 2, 2020.
Number of inspections: 28
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01761 Conference12/23/20191/2/20201/6/2020 4:29:39 PMACANC
ESC19-00160 General Inspection12/24/20191/2/20201/6/2020 4:28:38 PMPCANC
ESC19-00494 General Inspection12/24/20191/2/20201/6/2020 4:28:31 PMPCANC
ESC19-01673 Site Preparation1/2/20201/2/20201/3/2020 10:22:42 AMPPASS
Randy Stevenson - onsite foreman ###-####; listed RP Jason also onsite.

Construction entrance rock installed on north perimeter of site on Glenwood and this will be the main access for hauling. Notified Randy that trackout control and extension of rock entrance will be required as activity increases. Currently workers and site access is from Cole Road behind the barn. Storm drain has DI sediment bag; there is an area where stormwater ponds in front of this entrance that should be avoided by site traffic when muddy.

Plan is to preserve existing vegetation and pasture area oustide the work area around the Tuttle Canal within the Spaulding Ranch site. Will follow up next week to check on entrance condtions.
ESC15-00857 General Inspection1/2/20201/2/20201/2/2020 4:58:50 PM CANC
ESC19-00188 General Inspection1/2/20201/2/20201/2/2020 4:56:59 PM CANC
see ESC19-00181
ESC19-00189 General Inspection1/2/20201/2/20201/2/2020 4:56:45 PM CANC
see ESC19-00181
ESC19-00949 Site Final1/2/20201/2/20201/2/2020 4:56:27 PMPPASS
ESC19-00947 Site Final1/2/20201/2/20201/2/2020 4:56:15 PMPPASS
ESC19-00951 Site Final1/2/20201/2/20201/2/2020 4:56:03 PMPPASS
ESC19-00950 Site Final1/2/20201/2/20201/2/2020 4:55:44 PMPPASS
ESC19-00187 General Inspection1/2/20201/2/20201/2/2020 4:46:20 PM CANC
see ESC19-00181
ESC19-01689 General Inspection1/2/20201/2/20201/2/2020 4:32:01 PMPPASS
Common driveway installed. No foundation or other work started yet. No trackout No ESC corrections requested.
ESC19-00857 DOC - Permit Finaled1/2/20201/2/20201/2/2020 4:30:54 PMPPASS
Demo complete. No covered by Windy Court phase II ESC permits.
ESC19-01716 General Inspection1/2/20201/2/20201/2/2020 4:21:58 PMPPASS
Demo of trailer home has been complete. Some work and debris haul off in progress. Site has perimter construction fencing. No trackout. Permit sign posted.
ESC19-00773 General Inspection1/2/20201/2/20201/2/2020 4:20:40 PMPPASS
WIP. No trackout. Permit posted.
ESC19-00884 General Inspection1/2/20201/2/20201/2/2020 4:15:13 PMPPASS
WIP. No significant trackout. Permit posted. Workers parking on paved parking lot across the street. No corrections at this time.
ESC19-01279 Site Final1/2/20201/2/20201/2/2020 4:14:24 PMPPASS
Demo complete. No trackout or issues from the parcel. Trees left onsite; all permits finaled
ESC19-00156 General Inspection1/2/20201/2/20201/2/2020 4:09:18 PMPFAIL
Mud and dirt on gutter, sidewalk and street. Loose trash/uncontained trashpile at site

Notified Carl of the following corretions:
- pick up trash, build trash container. Was notified the trash trailer was stolen from site a few weeks ago
- clean up sidewalk & gutter. Scrape mud out of gutter with shovel; sweep street

Carl agreed to complete corrections. Follow up next week.
ESC19-01166 General Inspection1/2/20201/2/20201/2/2020 4:08:10 PMPFAIL
Mud and dirt on gutter, sidewalk and street. Loose trash/uncontained trashpile at site. $55 re-inspection has not been paid.

Notified Carl of the following corretions:
- pick up trash, build trash container. Was notified the trash trailer was stolen from site a few weeks ago
- clean up sidewalk & gutter. Scrape mud out of gutter with shovel; sweep street
- pay $55 fee

Carl agreed to complete corrections. Follow up next week.
ESC19-00207 Aging Inspection1/2/20201/2/20201/2/2020 2:08:22 PM CANC
ESC19-00207 Site Final1/2/20201/2/20201/2/2020 2:08:17 PMPPASS
Home complete and landscaped. One active project in progress. No corrections.
ESC19-00120 Site Final1/2/20201/2/20201/2/2020 1:57:52 PMPPASS
Home complete and landscaped. One active project on block. No corrections requested
ESC19-00100 Aging Inspection1/2/20201/2/20201/2/2020 1:28:53 PM CANC
ESC19-00187 Site Preparation1/2/20201/2/20201/2/2020 11:02:54 AMPCANC
ESC19-00302 DOC - Permit Finaled1/2/20201/2/20201/2/2020 11:01:54 AMPPASS
ESC19-00195 DOC - Permit Finaled1/2/20201/2/20201/2/2020 11:00:55 AMPPASS
ESC17-01287 General Inspection1/2/20201/2/20201/2/2020 10:57:45 AM PASS
revegetation of hillside in progress. Bond issued with PW hillside. Will continue to monitor.