Inspections for the day of: Monday, January 22, 2018.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00945 General Inspection1/22/20181/22/20181/26/2018 4:51:37 PMPCANC
ESC17-01263 BMP Violation1/17/20181/22/20181/25/2018 2:55:36 PMPPASS
Permit signs posted, DI sediment bags have been cleaned out and reinstalled. No major trackout.
ESC17-01182 BMP Violation1/17/20181/22/20181/25/2018 2:55:25 PMPPASS
Permit signs posted, DI sediment bags have been cleaned out and reinstalled. No major trackout.
ESC17-00027 Tracking Control1/22/20181/22/20181/24/2018 10:49:45 AMPCANC
ESC17-00334 General Inspection1/22/20181/22/20181/22/2018 12:01:40 PM CANC
ESC17-00456 Site Final1/22/20181/22/20181/22/2018 11:43:39 AMANR
Need to clean up adjacent lot, some rock and materials still staged there.
ESC16-01394 Site Final1/22/20181/22/20181/22/2018 11:20:12 AMAPASS
Home complete, landscapecd and occupied. DI bags to remain installed for future construction on lot to the north. ESC permit finaled.
ESC16-01342 Aging Inspection1/22/20181/22/20181/22/2018 11:16:34 AM PASS
No activity at site, prepped for future residential. Silt fence installed on south side of site in addition to preserved grassy banks. No trackout or discharges observed.
ESC14-01083 General Inspection1/22/20181/22/20181/22/2018 11:11:58 AM PEND
No trackout or discharges.

Correction request to conduct general perimeter trash pick up around Barber Valley townhomes phases and plastic sheeting within south side staging area. Will conduct walk through at end of week.
ESC15-01579 Complaint Inspection1/22/20181/22/20181/22/2018 11:07:57 AMAFAIL
Written correction notice issued to on-site supervisor Shaun:

-24 hour compliance request to pick up all visible loose trash and construction debris along pathway and vegetation and inside of project fencing. Net out any floatables seen in water. If fail, potential SWO or other enforcement.

- 48 hours compliance deadline to pick up all loose debris and litter within site staging area.

- designate a smoking area with trash can, pick up all butts around site
ESC17-00392 General Inspection1/22/20181/22/20181/22/2018 9:49:09 AMPPEND
Trash along back of building on west side has been picked up. No significant trackout beyond site, no construction entrance installed and some vehicles parking next to building will cause trackout.

Will follow up later this week on schedule for Suez to pave over new water construction.