Inspections for the day of: Wednesday, January 23, 2019.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01244 Conference1/22/20191/23/20191/24/2019 8:27:01 AMPDONE
Street and sidewalk have been swept. Gatorguard perimeter sediment control is trenched in and not broken.

Correction requests:
- remove dirt and sand captured behind gravel bag check dams in gutter on south side of street (same side as house)
- replace broken gravel check bags
- install new lined washout pit for driveway work
- clean up washout dumped on lower lot, prevent access by workers or vehicles onto this lot
ESC18-00946 BMP Violation1/22/20191/23/20191/23/2019 5:52:31 PMAPEND
RP cleaned mud and debris out of gutter and placed a wattle at top of site for futher installation, ground is frozen.

Work to be completed before Friday by subcontractor Giovanni, who is to call for instructions.

- request to remove sediment and mud captured behind wattles
- more wattle installation per site meeting to be scheduled.
ESC18-00243 Aging Inspection1/23/20191/23/20191/23/2019 9:02:53 AM FAIL
Corrections needed at East Valley Rim

- pick up all the loose trash at the west side of site and behind homes/between Greenbelt
- need to have a fully lined washout. The washout only is partially lined.
ESC17-00455 General Inspection1/23/20191/23/20191/23/2019 8:19:54 AM CANC
ESC16-00938 General Inspection1/23/20191/23/20191/23/2019 8:19:45 AM CANC
ESC18-01703 BMP Violation1/22/20191/23/20191/22/2019 5:24:08 PMPCANC
ESC18-01703 BMP Violation1/22/20191/23/20191/22/2019 4:52:13 PMPPEND
Lined washout installed on south side of road across the street. Permits posted.

No new corrections.