Inspections for the day of: Thursday, January 23, 2020.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01167 General Inspection1/23/20201/23/20201/31/2020 5:06:13 PMPPEND
follow up
ESC19-00369 Aging Inspection1/23/20201/23/20201/27/2020 8:29:13 AM CANC
ESC19-00371 General Inspection1/23/20201/23/20201/23/2020 4:42:39 PMPPEND
Construction activity is on winter hold till April. Full walk through to be conducted, but no muddy runoff observe and BMPs are installed.

Correction needed:
- update contact info on inspection reports
- reinstall barricade. Appears there is more joyriding occuring and trackout from that.

Walk through next week.
ESC19-01001 Site Final1/22/20201/23/20201/23/2020 4:12:47 PMPPASS
call prior- Matt Phone #: ###-####
ESC18-01682 Complaint Inspection1/23/20201/23/20201/23/2020 3:56:56 PMPDONE
Dumped washout next to driveway cleaned up. Reviewed washout requirements with RP. Did not see reported washout into a culvert. No other violations
MIS20-00018 ESC-Conference1/22/20201/23/20201/23/2020 3:35:08 PMADONE
caller complaining of concrete truck being rinsed out into culvert to river Phone #: ###-####

Washout dumped adaject to house has been cleaned up. Reviewed washout requirments with RP-GC Josh. See ESC18-01682
ESC17-01009 General Inspection1/23/20201/23/20201/23/2020 3:02:00 PM CANC
ESC19-00114 General Inspection1/23/20201/23/20201/23/2020 3:01:31 PM PASS
ESC19-00082 General Inspection1/23/20201/23/20201/23/2020 2:28:03 PM PASS
NO trackout. Trash dumpster and concrete washout pan onsite. No erosion issues observed. Approved.
ESC19-00383 Site Final1/23/20201/23/20201/23/2020 2:16:33 PMPPASS
ESC19-01500 Site Preparation1/22/20201/23/20201/23/2020 1:12:47 PMAPASS
Randy ###-####

Met with Joel project manager for site. No activity at time of inspection.

Workers will use the existing paved parking lot adjacent to site so access to site should be limited. Site has perimter construction fence and trees to be remain have protective perimeter fences installed. Project will be scoop down 6" inches and removing existing and will replace with an improved topsoil. Additional plantings and sidewalks will be installed and steps down into Quinn's Pond.

Construction entrance installed and permit sign is posted. Turbidity curtain will be installed prior to activity along the bank of the pond. Leakproof concrete washout is to be installed prior to any concrete work.

Approved for construction.
ESC18-00754 General Inspection1/23/20201/23/20201/23/2020 11:16:28 AM PASS
ESC19-00383 Aging Inspection1/23/20201/23/20201/23/2020 8:43:39 AM CANC