Inspections for the day of: Wednesday, January 24, 2018.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00013 General Inspection1/24/20181/24/20181/26/2018 4:51:43 PM CANC
ESC15-01579 BMP Violation1/23/20181/24/20181/24/2018 4:39:36 PMPPEND
Trash pickup still in progress. ESC permit signs are being posted around site. RP is aware of all corrections pending and due this Friday including covered dumpster. Inspection Thursday morning

ESC16-00625 General Inspection1/24/20181/24/20181/24/2018 11:52:16 AM FAIL
pick up uncontained trash in front of house during windy season

No trackout or discahrges observed

Verbal correction request to RP to provide dumpster or haul away waste.
ESC15-01138 General Inspection1/24/20181/24/20181/24/2018 11:52:04 AM FAIL
pick up uncontained trash in front of house during windy season

No trackout or discahrges observed

Verbal correction request to RP to provide dumpster or haul away waste.
ESC17-01077 General Inspection1/24/20181/24/20181/24/2018 11:03:08 AMAPASS
WIP. No trackout from site. Storm drains protected on Melrose. Workers parking on the street to avoid tracking. Permit sign posted.
ESC17-00027 Tracking Control1/24/20181/24/20181/24/2018 10:38:04 AMPFAIL
Complaint about trackout.

Significant trackout from south site acces to Sorenson extending to Cole. Mud and dirt from site visible on sidewalk and gutter on Victory due to trackout from the north access.

Correction request 24 hour compliance time
1. Sweep Sorenson and Victory sidewalk and gutter at entrance
2. Improve and maintain both construction entrances.
3. Install DI protection on Victory 100 M east of site access

Verbal corrections issued to project manager Rodger
ESC04-00820 DOC - Permit Finaled1/24/20181/24/20181/24/2018 10:22:16 AMPPASS