PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, January 24, 2019
.
Number of inspections:
10
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-00099
General Inspection
1/24/2019
1/24/2019
1/30/2019 2:22:36 PM
PART
Correction request to pick up loose trash behind home from project to RP Scott who was on site. No other issues.
ESC18-00920
BMP Violation
1/24/2019
1/24/2019
1/24/2019 5:02:39 PM
P
FAIL
Significant violation:
- concrete washout dumped at entrance of site. Evidence of slurry flow down hill towards gutter
Routine violation:
- trackout from unmaintained construction entrance
Corrections requested to Kevin w/ Roth Homes
- clean up dumped concerete to prevent further dumping
- provide new lined and leakproof washout container or pit.
- sweep up trackout
- provide new rock and maintain and widen construciton entrance.
Compliance Date:
Monday 1/28 2 PM
Re-inspeciton fee issued to permit. Must be paid and ESC inspeciton requested prior to compliance or parcel hold and addition investigation fees will be assessed to site.
ESC16-00935
BMP Violation
1/24/2019
1/24/2019
1/24/2019 5:02:04 PM
P
PASS
ESC16-00935
General Inspection
1/24/2019
1/24/2019
1/24/2019 4:19:21 PM
P
CANC
ESC18-00818
General Inspection
1/24/2019
1/24/2019
1/24/2019 4:19:03 PM
P
FAIL
Corrections needed:
- provide stabilized access to home from the road to prevent boot and vehicular trackout.
- install trash container/trailer/dumpster
ESC18-00659
BMP Violation
1/23/2019
1/24/2019
1/24/2019 3:21:22 PM
P
PEND
Biltmore project manager Pat called to state that corrections are in progress and a new compliant washout will be installed, re-inspection fees paid and a follow up conducted Friday or Monday
ESC18-00181
Aging Inspection
1/24/2019
1/24/2019
1/24/2019 3:11:21 PM
PASS
No violations. No recent changes at site.
ESC18-00240
Aging Inspection
1/24/2019
1/24/2019
1/24/2019 8:28:54 AM
FAIL
Corrections needed:
- trash pick up on west end of subdivsion and between the fence and the Greenbelt.
- clean up non-compliant washout that is not fully lined. Replace with above ground washout.
ESC17-00475
Aging Inspection
1/24/2019
1/24/2019
1/24/2019 8:12:11 AM
CANC
ESC17-00475
DOC - Permit Finaled
1/24/2019
1/24/2019
1/24/2019 8:12:06 AM
P
PASS