Inspections for the day of: Monday, January 28, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00847 Tracking Control1/28/20191/28/20191/31/2019 3:58:49 PMPPASS
Trackout cleaned up.
ESC17-01196 General Inspection1/28/20191/28/20191/30/2019 4:35:12 PM PASS
ESC18-00184 General Inspection1/28/20191/28/20191/30/2019 2:22:55 PM PART
Correction request to pick up loose trash behind home from project to RP Scott who was on site. No other issues.
ESC18-00311 General Inspection1/28/20191/28/20191/30/2019 1:51:45 PM PASS
WIP. No trackout or loose trash. Subdivsion BMPs installed.
ESC17-00971 Aging Inspection1/28/20191/28/20191/28/2019 4:59:39 PM CANC
ESC18-00920 BMP Violation1/28/20191/28/20191/28/2019 4:59:23 PMPFAIL
Corrections completed:
- road has been swept
- additional rock installed on entrance
- dumped washout cleaned up


Corrections remaining:

- stake in perimeter wattles
- build new leak-proof washout
- pay re-inspection fee
ESC18-01375 BMP Violation1/25/20191/28/20191/28/2019 3:58:40 PMPPEND
check on new washout

new above-ground lined washout installed and in use. Inspection conducted with Pat with Biltmore, requested the lining be secured to the sides, which was completed.

Corrections remaining:
- sweep gravel and rock out of the streets

Pat wants to have a meeting regarding the re-inspection fees assessed.

Case pending
ESC16-00290 DOC - Permit Finaled1/28/20191/28/20191/28/2019 8:34:23 AMPPASS
ESC16-00290 Aging Inspection1/28/20191/28/20191/28/2019 8:33:56 AM CANC
ESC18-00180 General Inspection1/28/20191/28/20191/28/2019 8:24:03 AM PASS
See ESC17-01687 for all remaining ESC inspections for project
ESC18-00180 DOC - Permit Finaled1/28/20191/28/20191/28/2019 8:23:55 AMPPASS
ESC18-00122 DOC - Permit Finaled1/28/20191/28/20191/28/2019 8:22:39 AMPPASS