Inspections for the day of: Wednesday, January 29, 2014.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01149 General Inspection1/29/20141/29/20141/29/2014 2:43:48 PM PASS
DI in front of remodel is protected. Wattles installed on slope on east side of house. Permit is posted. No corrections at this time.
ESC11-00879 Random Inspection1/29/20141/29/20141/29/2014 2:34:28 PMPPART
Permiter and downslope BMPs are filtering runoff and containing sediment.

Some rill erosion is occuring in between graded lots and destroying the banks seperating lots. Will need to be fixed or it will continue to get worse.

Jayo has been informed of the issues. Will continue to monitor.
ESC13-00193 Random Inspection1/29/20141/29/20141/29/2014 2:25:03 PMPPART
SWO is being obeyed, but there is a failed wattle below culdesace entrance that is allowing some sediment to flow in storm drain and pond.

Corrections:
1. Fix wattle by adding additional trenched wattle
(a diversion channel may also be helpful to divert flow away from roady.)
2. Empty DI bag when runoff has stopped.
ESC13-00806 Random Inspection1/29/20141/29/20141/29/2014 2:11:30 PMPPASS
Silt fence protecting hillside part of lot has been retrenched as requested. Orion Ct. is clean with limited trackout. Construction entrance was rebuilt.
ESC13-01132 General Inspection1/29/20141/29/20141/29/2014 1:52:16 PM PASS
Work is mainly in the interior and backyard. No sediment leaving site, no trackout, no stockpiles. Approved.
ESC13-01113 General Inspection1/29/20141/29/20141/29/2014 12:20:22 PM PASS
Hillside stabiliization is holding up through precipitation. No sediment laden runoff flowing to Castello. No corrections required at this time.
ESC13-00344 Random Inspection1/29/20141/29/20141/29/2014 12:09:17 PMPFAIL
Some channel/rill erosion and sediment transport is occuring at top of Windsong and flowing down through gutters.

Verbal CN to RP contact Eric Allen to place check dams in channel that has developed and additional wattles/silt fencing to filter out sediment as much as possible before runoff enters gutter.

Check downstream DI's on Toluka and Windsong for sediment accumulation and make corrections as necessary.
ESC09-00352 Tracking Control1/29/20141/29/20141/29/2014 11:09:46 AMPPEND
Trackout from stockpiling was swept up as requested. Barber Valley Road is now clean.

Disposition is pending due to investigating if location of stockpile is on a permitted parcel.
ESC14-00009 Site Preparation1/28/20141/29/20141/29/2014 11:02:27 AMAPASS
eric Phone #: ###-####

Site is ready for excavation. Extra wattles on-site to install once stock piling begins. Eric stated excavation will start this afternoon or tomorrow once rain has stopped.
ESC13-00897 General Inspection1/29/20141/29/20141/29/2014 9:47:59 AM PASS
Tennant improvement of former K-mart. Construction supplies and materials kept within designated staging area. No earthwork or stockpiling observed. No corrections at this time.
ESC13-00895 General Inspection1/29/20141/29/20141/29/2014 9:09:46 AM PASS
Work ongoing indoors on 3rd floor. No ESC issues at this time.
ESC13-00444 Aging Inspection1/29/20141/29/20141/29/2014 8:52:08 AM PASS
ESC13-00443 Aging Inspection1/29/20141/29/20141/29/2014 8:50:18 AM PASS