Inspections for the day of: Friday, January 29, 2016.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00338 General Inspection1/29/20161/29/20162/1/2016 10:13:19 AM PASS
No activity at site. No issues.
ESC15-00811 Aging Inspection1/29/20161/29/20161/29/2016 4:19:44 PM PASS
WIP of SFH. Driveway not paved so should be kept off during rain. No trackout or issues, no MS4 on this section of 20th street.
ESC15-01435 Site Preparation1/25/20161/29/20161/29/2016 3:56:12 PMAPART
RP Walt called to inform he was having perimeter BMPs re-installed. Conduct site preparation inspection.

Site is clean with ESC permit sign posted. Perimeter wattles have been installed, but are not properly trenched in or staked in at right frequency.

Need to install DI bag on stormdrain to the left of driveway.

Conference with RP-GC Walt on Monday.
ESC15-00541 General Inspection1/29/20161/29/20161/29/2016 3:54:29 PM PART
Need to post sign and install a tracking entrance or block the upper entrance to prevent future trackout. Site is in a depression, so water does not run off. The adjacent infiltration/retention areas have been undisturbed.

No trackout or discharges.
ESC14-01083 General Inspection1/29/20161/29/20161/29/2016 3:20:43 PMPFAIL
Corrections needed at site:

- need to empty overflowing trash bins
- need to check DI's on Thoroughbred because stormwater is overflowing the filter bags rather than flowing through.
- concrete washout was repaired poorly. Need to secure visqueen leak proof barrier and dispose of the trash and chemical barrels.
- material loader leaking oil and mixing with stormwater causing sheen. Need to check vehicles for leaks frequently and have spill absorbent on site.

Corrections issued to new Brighton Homes supervisor Kyle ###-####
ESC14-00788 General Inspection1/29/20161/29/20161/29/2016 3:15:40 PMPPASS
Group training inspection and walk-through at Privada

No activity. Hillside wattles installed properly and keeping sediment on site.

Strorm drains have filter bags installed, will need to check for maintenance as some are not draining properly. Slopes have been divet-tracked to create depression storage and others covered with bark to prevent rainfall coming in contact with sediment.

No corrections other than DI maintenance, RP Jeff noted a crew will be onsite next week doing BMP maintenance.
ESC14-01011 General Inspection1/29/20161/29/20161/29/2016 3:06:46 PM CANC
ESC15-00556 General Inspection1/29/20161/29/20161/29/2016 11:43:12 AM PASS
No subdivision development activity. No trackout or loose sediment leaving site. On site stormwater system has sediment control BMPs installed. SFH work by Tahoe occuring in the first phase of East Valley.
ESC15-00633 Aging Inspection1/29/20161/29/20161/29/2016 9:00:15 AM PASS
WIP. East Valley BMPs and regular housekeeping are in compliance.
ESC15-00634 Aging Inspection1/29/20161/29/20161/29/2016 8:59:50 AM PASS
Construction complete. To be landscaped by Tahoe crews weather permitting. Open permits and temp BMPs installed at EV
ESC15-00634 DOC - Permit Finaled1/29/20161/29/20161/29/2016 8:59:08 AMPPASS
ESC15-00742 Aging Inspection1/29/20161/29/20161/29/2016 8:58:58 AM PASS
WIP. East Valley BMPs and regular housekeeping are in compliance.
ESC15-00741 Aging Inspection1/29/20161/29/20161/29/2016 8:58:44 AM PASS
WIP. East Valley BMPs and regular housekeeping are in compliance.