ESC18-01497
| BMP Violation | 1/29/2019 | 1/30/2019 | 2/1/2019 11:29:34 AM | P | FAIL |
|
|
No corrections made. Pictures sent to RP. Stated he thought it was washout on Cassia.
Clean up is need on Hilton lots...
|
ESC16-00406
| General Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 5:00:57 PM | P | FAIL |
|
|
Corrections needed:
- fix erosion and sediment runoff occuring on Sandpoint (lot 9, block 2). Previous inspeciton notes on 12/11 incorrect, no repair of rill/channel. Need to install additional wattles to slow flow of water and retain on lots rather than flowing down cut slopes. - fix erosion off Broadstone on common area leading to golf course. - pick up loose trash in common areas.
|
ESC18-01687
| General Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 4:34:47 PM | P | PASS |
|
|
WIP on grading and excavation within the Ft. Boise basin area. No offhaul yet, no additional construction entrance installed yet. No sediment runoff or trackout observed. Job site and worker parking area has been kept clean.
|
ESC18-00462
| General Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 3:15:46 PM | | PASS |
|
|
|
ESC18-00440
| General Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 3:14:29 PM | | PEND |
|
|
homeowner continued site work after pool contractor left. Will continue to monitor. Lot may soon be new SFH.
|
ESC18-00498
| General Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 3:00:50 PM | P | PASS |
|
|
Hillside erosion controls in place. Some grasses are starting to grow. No significant rills or sediment runoff observed. Subdivision storm drains have sediment protection. RP on site. No corrections.
|
ESC17-01113
| DOC - Permit Finaled | 1/30/2019 | 1/30/2019 | 1/30/2019 2:50:03 PM | P | PASS |
|
|
|
ESC17-01113
| DOC - Permit Finaled | 1/30/2019 | 1/30/2019 | 1/30/2019 2:49:07 PM | P | PASS |
|
|
|
ESC18-00984
| Site Final | 1/30/2019 | 1/30/2019 | 1/30/2019 2:48:42 PM | P | PASS |
|
|
BLD finaled. No disturbed area or loose dirt around site. ESC permit finaled.
|
ESC18-00844
| General Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 2:47:51 PM | P | PASS |
|
|
WIP. Permit posted, construction entrance installed. Perimeter vegetation preserved. Approved.
|
ESC18-01749
| BMP Violation | 1/30/2019 | 1/30/2019 | 1/30/2019 2:21:48 PM | P | PASS |
|
|
Water truck now onsite and in use for fugitive dust control as requested. Will continue to monitor.
|
ESC18-00946
| General Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 1:45:54 PM | P | PEND |
|
|
No new work or BMPs added since the first clean up and watttle placement.
still need to clean out dirt behind wattles and install additional controls on the upper section and stake in wattles.
RP should be back in town.
|
ESC18-01776
| General Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 1:29:46 PM | P | PASS |
|
|
Demo complete. No trackout. Site is below grade of road. Site is to become additional parking for the Jacksons. No corrections requested.
|
ESC17-01754
| General Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 11:03:28 AM | P | FAIL |
|
|
Correction request remaining: - street sweepers need to focus on Federal Way SE bound between Targee and Latimer
Corrections competed: - storm drain inlet sediment protection on Targee and SE Federal Way to Ralfroy have been installed - pit run has been placed through site to limit mud from deliveries and workers - worker parking has been rocked - Hudson and Targee have been swept.
Correction request and inspection of Federal Way dirt conducted with RP JC. Sweep street tonight.
|